App software development is not complex, complete online app development but 9 steps, a look to understand what is going on.
First step: Needs assessment
Before the App project is officially launched, customers should evaluate their needs and confirm the project's development cycle and cost. Login to the apicloud custom Platform,3 minutes to submit App requirements, a one-on-one personalized customer service and form an evaluation report. Prior to the need for professional customer service and project supervision and full communication with customers to understand the type of customer to develop the APP , platform, function, product design needs, time, budget and so on, only to understand the detailed needs of customers to make development plans.
Step Two: Official signing
After confirming the development requirement of the app software project, we signed the official contract with Apicloud and started the project.
Step Three: Progress Management
In the Apicloud Project Management background, confirm the cycle progress of each development phase, so that both sides in the background to monitor the progress of the project in real time. Apicloud in strict accordance with the project phase of standardized development, enterprise customers online project management system in real-time inspection and confirmation of project progress and content, so that every step will not deviate from the project objectives.
Fourth Step product prototypes
The app project formally enters the development stage, first of all to confirm the product prototype design. After the completion of the prototype design, including the completion of each subsequent development phase, it is necessary for both sides to confirm the phase before they can enter the next stage of development. The convenience of online real-time management is to check the progress and confirm the two sides.
The design of the product prototype is critical, and as a basis for the next steps, the product prototype must reflect a process from the user registration to the end of the APP . The advantage of this is to avoid the subsequent UI phase and program development phase, the same problem repeatedly changed to change, this is a very waste of time. The same feature can take one hours to modify on the prototype, but it can take 4 hours to change the UI , and it may take 2 days to change the program.
Fifth Step + Sixth step:UI design, front- end development
Based on the design of the product prototype, the next step is to enter the UI design and start the front-end development.
After we have finished prototyping the app , we need to make each app 's page into a APPUI, and after that, each page looks like a real app , with realistic results.
The main color of the UI, usually determined by the APP 's orientation. For example: Fresh-type app most of the main color is green plus a little yellow, the main color of the app to locate mother and baby is generally light red, positioning the office of the app 's main color is generally blue. The app 's main hue directly determines the app 's viewing.
The front-end is then developed according to a good UI design, to restore the best results of UI design, but also to take into account the effects of buttons, page switching and so on. These details will have a direct impact on the user experience.
Seventh Step: server-side development
After the development of the front-end overall, the development of the server is continued. Server-side development may include architecture design and database design, business function implementation and interface encapsulation, and management background development.
Making apps is like building a house, trying to build a good house, and the foundation is always in the most important position. The bottom frame of the app is like the foundation of the House, which will directly determine the stability of the app and the readability of the app code that can be in plasticity.
Eighth step: interface interlock
Finally, the front end is connected to the service retransmitting, the interface is linked, and theapp software is developed.
nineth Step: Delivery acceptance
When entering the project closure, the development team strictly according to the Apicloud Standardized acceptance system, the front-end source code, requirements documents, design documents, Operation instructions, test reports and other deliverables are submitted to the enterprise customers, convenient project update iteration. The official commitment to each of the projects smoothly online to Apple and the various DA Zhuo application market.