Change plan
I used to be ready to write a weather app for myself and add that I've already done a small example of Android development, and feel like I can do it. As a result, these five days proved to be the wrong idea at the beginning. So the last time with other classmates asked. Took a look at their plan. decided to want to find a few templates from the Internet, and then follow their own design ideas for creative development.
The example has been found yesterday, and I have automatically ignored yesterday's sprint. So yesterday was not counted as their own sprint of the day.
Change plan as follows
Today counts as the first day of my own sprint. Basic familiarity with the functions and roles of the various parts of the template, reading the code of each part of the author.
The No. 234 day according to their own design ideas bar app design template made out.
The 56th day Link Weather API interface, do the city database, and connect. To achieve the real-time temperature conditions of the weather.
Seventh day for bug debugging. and finishing work.
Well, that's the plan for the future, and if it's done properly, I think it's possible to hand over a basic app next week.
Today, the task has been completed, found a few good templates, which have a very detailed method of the production of weather app process. In addition the author's code is basically read, tomorrow continue to design their own app.
DB Weather App Sprint sixth day