Cisco 6807XL Connection Configuration with Cisco 6800IA

Source: Internet
Author: User

Let's use an old diagram here to illustrate 6807XL and 6800IA.

650) this.width=650; "Src=" Http://s4.51cto.com/wyfs02/M02/86/09/wKiom1ey-16x3iLuAATm_Mc4Eck449.jpg-wh_500x0-wm_3 -wmp_4-s_413653667.jpg "title=" 6800ia Guide sevt.jpg "alt=" Wkiom1ey-16x3iluaatm_mc4eck449.jpg-wh_50 "/>

When the configuration is complete, 6800IA is the equivalent of a 6807XL board.

Here is a brief description of the configuration process, in fact, the configuration is very simple, but there are a few points to note:

1, the equipment after hand do not rush to configure, especially the equipment has never been contacted.

2. It is important to read the official configuration document carefully. The following official documents are attached here:

http://www.cisco.com/c/en/us/td/docs/switches/lan/catalyst6500/ios/15-1SY/config_guide/sup2T/15_1_sy_swcg_2T/ Instant_access.pdf

3, hands-on configuration.

***************************************************************************************************

An IA parent-a vss-mode Catalyst 6800 switch or A Vss-mode Catalyst 6500 Switch equipped with a Supervisor Engine 2T and O NE or more ws-x6904-40g-2t switching modules, configured to support 10GE links.


In the official document above, it is important to note that the "A Vss-mode", which means that the main switch on the 6800IA must be VSS mode. Of course, if you ignore this here, there will be some problems in the subsequent configuration process, such as: a command cannot be knocked up. The prompt does not support this command in this mode. As for the 2T engine mentioned later, it is not necessary to use it, now it has come out 6T engine.

I'm not going to describe the configuration of VSS here. Mainly look at the 6807XL and 6800IA connection configuration process, the entire configuration operation is done on 6807XL, the main command is as follows:

Fex 101
Description 6800ia-48-01
Module 1 Type C6800IA-48TD

Interface Port-channel1
Switchport
Switchport mode Fex-fabric
FEX Associate 101

Interface TENGIGABITETHERNET1/3/7
Switchport
Switchport mode Fex-fabric
Channel-group 1 mode on

Interface TENGIGABITETHERNET1/3/8
Switchport
Switchport mode Fex-fabric
Channel-group 1 mode on

The above command can also refer to the configuration manual.


After the above command configuration is complete, review the working status of 6800IA.

connected         c6800ia-48td       foc2016s1nd 


Note that the state at this time is connected, which is not the final state, but the beginning state. Check back later, as follows:

img_dnld          c6800ia-48td        FOC2016S1ND

Note that the status at this time is img_dnld, which means that 6800IA is downloading an img file from the uplink switch for upgrade. I'll see you later.


offline           c6800ia-48td        foc2016s1nd

If you see the status is Offine, then can tell you, you do not worry, 6800IA is restarting, patiently wait, and then observe.


Router#show Fex
Fex Fex Fex Fex
Number Description State Model Serial
---------------------------------------------------------------------------
101 6800ia-48-01 Online c6800ia-48td foc2016s1nd
After a wait, when you find that the status is online, that the 6800IA is connected to normal, you can configure it!


We can see if the interface of IA is added by the show Run command.

Router#show Run

........................ Also omit the N-line configuration ....... .........

Interface Gigabitethernet101/1/0/1
Switchport
Switchport trunk allowed VLAN 1
Switchport mode Dynamic Auto
Shutdown
!
Interface Gigabitethernet101/1/0/2
Switchport
Switchport trunk allowed VLAN 1
Switchport mode Dynamic Auto
Shutdown
!
Interface Gigabitethernet101/1/0/3
Switchport
Switchport trunk allowed VLAN 1
Switchport mode Dynamic Auto
Shutdown

.............................. There is no more than n lines to configure ......... .........

Seeing the above configuration indicates that our initial configuration has been completed.


Finally, it is strongly recommended that you read the official documents carefully, otherwise there will be "pits" waiting for you in the later use process.




This article is from the "Xunil" blog, make sure to keep this source http://136464.blog.51cto.com/126464/1839350

Cisco 6807XL Connection Configuration with Cisco 6800IA

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.