Company to do a project, the beginning of the start of the diagram is two, both a start-up diagram and a similar to the ad map, laborious half-day hard to get out, the project on-line, customer requirements to change into a start diagram, but if the kind of images from the server dynamically obtained, I heard a dumbfounded, still can do so, the start diagram How to set? I went to Baidu, to various technical Exchange Group consulting. A technology Daniel told me a way to share it with you now.
First of all, the start diagram is not dynamic acquisition, to achieve that effect, can only make a false impression, let people feel that your launch map is dynamic acquisition.
(1) The start chart blank or part of the blank (here, if the start of the diagram blank, it will be very ugly, so the proposal is still part of the blank).
Here's the start page to set up as you do the start page.
(2) then make a VC used to do the dynamic get the server image and then display the function, this VC interface must be done and your startup page exactly the same.
Then in the first VC, set the code to animate, set the request down the start diagram of what is all right.
IOS dynamically set a picture of the boot diagram (set to a picture requested from the server)