Recently I was in charge of a company's internal data center virtualization project, mainly involving the deployment of server virtualization and desktop virtualization. during the implementation process, I had some experiences and recorded them and shared them with you.

I. Preliminary Demand Survey
1. Network Topology
2. Hardware: storage, server, and switch
3. Software Platform: virtualization software, backup software, etc.
4. Backup space: the size of the local disk and storage space are mainly lun)

Ii. project implementation process
1. Storage division. The server configuration check project uses IBM Storwize V7000 storage)
2. A Huawei S9303 core switch, such as trunk, is used to configure the vswitch project)
3. the IBM X3650 M3 server is used to deploy vm esxi 4.1/5.0 node host projects)
4. Install vCenter on a single machine. Of course, you can install vcenter on a ready-made Virtual Machine. After vCenter is installed, you can perform migration and cluster operations)
5. You can select drs and vsphere ha for cluster creation. The former is dynamic resource balance, and the latter is fault tolerance)
6. Add the Host to vCenter to centrally manage and implement advanced VM function applications, such as HA and FT)
7. If you bind a node host Nic to multiple NICs, the switch uses a set link. You must select the ip hash option in the VM to perform load balancing)
8. to configure vMotion for migration to storage and other hosts, be sure to enable it. The case sensitivity is the same when vlan is created. Otherwise, vlanid is not recognized during migration)
9. Set up an SSR Server to back up virtual machines and migrate P2V servers)
10. Install the vSphere Mini Monitor quick, convenient, and free alarm tool to send custom alarms, regardless of whether the vSphere Client is running or not)
 
The preliminary work and implementation of the project have been basically completed. This is probably the process in which the vm project can be successfully implemented. In the future, I will share the specific configuration details of this project with a wide range of friends. Please let me know more.

Concepts to be understood:

Vmware DRS :( Distributed Resource Scheduler) Vmware Distributed Resource Scheduler DRS) dynamically allocates and balances computing capacity across hardware resources aggregated to the logical Resource pool. Vmware DRS continuously monitors utilization across resource pools and intelligently allocates available resources among multiple virtual machines based on predefined rules that reflect business needs and changing priority transactions. When the VM loads increase, Vmware DRS will automatically allocate more resources to it by re-distributing the VM among physical servers in the resource pool.

VSphere HA: it is mainly used for fault tolerance. Simply put, a physical machine is suspended and the virtual machine is automatically migrated to another physical machine, but the downtime is 2-5 minutes. You can also enable the FT function for each virtual machine. This is a resource image that does not have a switching time and does not interrupt services, but consumes double resources ).

 

This article from the "second O & M station" blog, please be sure to keep this source http://300second.blog.51cto.com/7582/1077747

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.