Skills required for integrated cabling
In fact, Integrated Wiring is not an incomprehensible project. As long as you understand its principles and compare the product performance, you will be able to make a cost-effective system.
1. The Integrated Wiring System must be designed in advance to cooperate with civil engineering, fire fighting, air conditioning, lighting and other installation projects to avoid unnecessary construction conflicts.
2. When conditions permit, the weak current should go through its own weak current well to reduce the chance of electromagnetic interference. The floor wiring room and master room should be arranged as much as possible for development and maintenance. For the network, laying the physical layer is crucial because it is the foundation.
3. deploy as many points as possible. The dual-hole Panel (one voice and one data) is used to combine the cables with the electric cables and deploy the power points near the information points. Because the Integrated Wiring is generally a one-time project in place, it is difficult to change the wiring after the wiring is finished, and the communication equipment is growing with the development, so it is safer to deploy multiple cables.
4. Do not idealize Integrated Wiring, or integrate some dedicated networks into integrated wiring. Integrated Wiring is enough to integrate telephone networks, computer networks, and Building Automation Networks.
5. With the rapid development of network equipment, we should broaden the selection scheme as much as possible. We should adopt five or more levels to ensure that data and voice can be exchanged. Vertical use of optical fiber and a large logarithm of cable, for buildings with many points, optical fiber cables should be used for data backup instead of cables.
6. Because the price of optical products is constantly lowered, more bright spots should be considered for large open room cabling, Which is favorable for network construction.
7. When laying the DG pipe, a large diameter should be used and a margin should be left. When laying optical cables, pay special attention to the turning radius. If the turning radius is too small, it will cause serious link loss. Carefully check each optical cable, especially the Panel box of the optical contacts. Some panel boxes do not have enough depth, after the bright spot is ready, the Panel is good when it is not mounted to the box. After it is installed, the test is not good because the radius of the optical cable corner is too small after it is mounted, causing serious losses.
8. With the price reduction of optical fusion equipment, you can consider abandoning the traditional ST and SC head production methods for conditions, the fusion of pigtails and optical fibers ensures the optical path quality.
9. Do not unilaterally pursue the brand of cabling products. In the past few years, the performance of non-shielded cables, optical cables, modules, and other network equipment produced by some manufacturers in China has already reached industry standards, the price has a great advantage, so we can consider using our own products.
The above problems are frequently encountered in the project. In fact, Integrated Wiring is not an incomprehensible project. As long as you understand its principles and compare the product performance, you will be able to make a cost-effective system.