The decision-making analysis (1) of the Software Project Management (CMMI Maturity) practice, as described above, is as follows.
(1) Evaluation results
Scenario One: 86.17, scenario Two: 87.08, programme three: 80.25
Based on the results of this assessment, the choice of scenario two, that is, the integration of Java EE platform into the system, to provide the system front-end development of technical capabilities, which is expected by the vast numbers of technical staff.
(2) Analysis results
Through the score, program two and plan one, the difference is less than 1 points, and three program scores did not pull open, what is the reason?
My initial analysis is that the overall difference between the three programs themselves is not small, even if the technical advantages of the program two obvious, however, the team in other areas still do not have a good grasp of conditions.
(3) The decision analysis process experience
In the decision-making process of possible technical options, if the project manager believes that the overall difference between technical solutions is not large, this method can be used to respect the choice of technical personnel, do their preferences, the project more favorable. If the project manager has enough resources, then it may be a different result, not to mention the lack of resources!