APC to build high reliable data center with Wuhu second house
Source: Internet
Author: User
KeywordsCloud computing data center healthcare Industry data center Schneider Electric
BEIJING/China, February 21, 2012--the world's leading power and refrigeration service provider Schneider Electric's APC (hereinafter referred to as APC) recently announced that infrastruxure™ integrated system successfully settled in Wuhu second People's Hospital (hereinafter referred to as the second Hospital of Wuhu), Provide a comprehensive data center physical infrastructure solution for the new data center in the hospital. In this project, the high reliability and high availability of the Infineon integrated system fully meet the requirements of the hospital for the availability of the data center. At the same time because of its modularity and "on-demand" features, but also to meet the user's future increase in the expansion of the same time, to ensure that the important load of the power supply and refrigeration capacity of redundancy. This complete set of Infineon integrated Systems is a typical application in the medical industry, providing a great reference for users in the healthcare industry to build and apply a new generation of data centers.
"As we all know, the health care industry has been at a high level in terms of security, stability, scalability, and green energy efficiency," said Huang Honghong, a senior vice president at Schneider Electric and president of Greater China. At the same time, under the background of the new medical reform, the hospital needs to improve the integrity and flexibility of the data center gradually, and also pay more attention to the prophase planning of Science. Especially in the hospital New data Center project, fully consider the future business growth, forward-looking planning has become the medical industry users consensus. APC has advanced technology and rich practical experience in data center planning and construction, comprehensive white Paper on data center planning, construction and operation, free online planning tools, innovative infrastruxure™ integrated system, provide users with from planning, design, implementation, Operations and other integrated systems solutions and services, and through a global perspective in the energy efficiency and other aspects to help enterprises enhance the competitiveness of the industry, thus calmly meet the challenges of future business growth. ”
Wuhu in Anhui Province is the pilot city of National public hospital reform and the National Health informatization Construction, and the Wuhu second hospital is a pilot hospital of the Ministry of Health Informatization. As a public hospital with a large number of responsibilities, the data center, in addition to its own business applications, also undertakes the information support work including Wuhu Drug Management Center and subordinate units, and Wuhu Health Information Centre, so its importance is self-evident. From the beginning of the planning, the second courtyard of Wuhu on the new data center in the high reliability, high scalability, easy maintenance, green energy saving and so on put forward a very high demand. Among them, due to the medical industry's application characteristics, including night emergency and ICU monitoring needs, the data center requires 7x24 hours x365 days uninterrupted operation. In addition, in view of industry trends, medical private cloud and industry cloud are the development direction that the second courtyard of Wuhu must face and explore, so it is necessary to meet the requirements of cloud computing for physical infrastructure to plan new data center construction.
APC's global experience has presented a perfect solution for the needs of the second chamber of Wuhu. New data center area of 200 square meters, in accordance with the electronic information System room a standard design. In this scheme, the Infineon Integrated system provides a real modular UPS system, allowing users to flexibly increase it power according to actual situation, to realize increasing UPS power supply capacity as the real load increases, and to save the capital waste and energy consumption caused by the UPS system over planning, And to meet the future business development needs; At the same time, its modular components and hot-swappable structure can be very easy to add and subtract various modules online, capacity expansion or online maintenance and maintenance, so in usability, maintainability with traditional 1+1 parallel incomparable advantages; System complete management and monitoring function also allows the hospital to ensure the safe and stable operation of the data center at the same time, can be extremely convenient for the entire data center for operation and Maintenance management. From the operational effect, Wuhu second courtyard and APC in the construction of data center at the beginning of the consideration and the corresponding planning is very forward-looking, the construction of the project in order to meet the future information needs of the second hospital in Wuhu, but also for the second hospital of Wuhu to build a medical cloud of the concept of a perfect practice and experience.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.