Guangxi Guilin 3 year refuse to batch pollution project 200

Source: Internet
Author: User
Keywords Guilin Lijiang construction project Guilin City
Tags control development environment environmental environmental protection environmental protection department gui project
Chi Shimin Louqing, shortly before the establishment of the site in Guilin, Guangxi, the upper reaches of the Peach Blossom River, "Guilin Tian Gui Livestock Breeding Co., Ltd. slaughter the million-head beef Cattle Service System construction project" in the "EIA" was "jammed."  The reason is that the project can not properly handle the daily production of hundreds of tons of waste water, may be contaminated through the Guilin area of peach Blossom River, and even affect the Lijiang River.  At this point, Guilin City in Guangxi over the past 3 years has been more than 200 environmental impact of the project refused to approve, more than 300 projects proposed owners to relocate the construction. Guilin is a famous international tourism city, National historical and cultural cities, the ecological environment is the basic development of Guilin, but also the largest sustainable development power. The Lijiang River, which originated from South China's highest peak mountain, is the mother of Guilin. For thousands of years, Guilin formed a pattern of the development of the Li River for the central axis, urban residents, administrative institutions and two or three industries are crowded in the Lijiang River coast, is increasingly becoming the mother River Lijiang unbearable heavy. How to solve the problem of scientific protection and speeding up development?  Guilin from the strategic height, according to the nature of the city and environmental capacity to determine the direction and speed of economic development, in the adjustment of industrial layout, optimize the industrial structure at the same time, attaches great importance to ecological environmental protection and construction, "both Jinshan Yinshan, but also to Green mountains" to achieve industrial development and environmental protection "No matter how big the project, the environmental protection must be shut out!" "Guilin" as the precondition of project approval, and strengthen construction project management, pay attention to control the hidden danger from the source, do not conform to the national laws and regulations and industrial policies, not conducive to the protection of water source, seriously affect the ecological environment of the construction projects, resolutely exercise the right to environmental protection veto. For all new projects, strict implementation of environmental impact assessment, energy-saving assessment and review and environmental protection "three simultaneous" system, so that at the same time design, construction, at the same time acceptance. According to statistics, in the past 3 years, the city has completed more than 1000 environmental impact of the construction projects of Environmental Protection administrative license approval work on more than 200 of the environmental impact of the project is not administrative approval.  Among them, only the first half of this year, a total of 221 urban construction projects approved, more than 30 environmentally sensitive projects refused approval. According to Li Guibin of Guilin Environmental Protection Bureau, these rejected projects have a total of four categories: one is not in line with the State industrial policy, the second is illegal; the third is to choose the wrong location; four are located in the environment sensitive area. Among them, the total investment of 667 million yuan Nissan 4000 tons of dry cement project, in early August this year by the Environmental Protection department again "Jam", the pre-trial is not passed  , investment of 230 million yuan Carey Bio-power projects, not only in line with national industrial policy, is also energy conservation and environmental protection projects, but because of the wind direction in the city of Guilin, but also in the upper reaches of Lijiang, the Environmental Protection Department suggested that the owner of the site, the investment 60 million Yuan Dongling Ridge 30th Hotel Project, the sewage produced by the temporary access to the county sewage Treatment Pipe Network, the environmental protection According to Guilin, Shao Yongming, director of the comprehensive utilization of resources of the Economic Commission, introduced, to the existing industrial projects, Guilin increase industrial "waste" management efforts toEnvironmental pollution is minimized. From 2007 to 2010, the city phased out the backward shaft kiln cement production capacity of 1.2 million tons, the elimination of backward small ferroalloy smelting production capacity of 95,000 tons, thereby reducing sulfur dioxide emissions of 38,000 tons, reduce waste residue emissions 46,000 tons. Guanyang nonferrous metal smelting plant coarse tin construction project once in the elimination of arsenic emissions of toxic pollutants blocked, the relevant departments actively coordinate the project owners to Yunnan Yun Tin Group "learn from".  The project adjusted the process and technology, the pollutants were thoroughly controlled and successfully completed and put into production. Environmental protection, financial initiative. Guilin Finance Bureau Chanco Chief of the army told reporters that in recent years, the city of Guilin Finance has increased the support for environmental protection. Since 1994, the city has made use of the World Bank loan of 300 million yuan, implemented the comprehensive renovation of urban environment, starting from 1999, the total investment 1.1 billion yuan two phase started construction of "the River Four Lakes" project, the cumulative investment of 800 million yuan to implement the garbage harmless treatment project. In order to promote ecological and environmental protection construction of Lijiang River, the flood control and Lijiang River replenishment project were launched last year. The project has a total investment of 3.6 billion yuan, control rain area of 712 square kilometers, the total capacity of 498.5 million cubic meters, completion of the project, is expected to crack the flow of the Lijiang River, Guilin shouting "thirsty" predicament. More surprisingly, Guilin has invested heavily in 4 modern sewage purification plants in a city of just 700,000 people, with a total capacity of 228,500 tonnes a day. The construction of environmental protection infrastructure in the urban area has been completed by enlarging and upgrading the sewage treatment plant, perfecting the diversion of rain and sewage pipe network, building the harmless landfill and transfer station.  Figures show that 2006-2008, the financial use of industrial pollution, urban environmental infrastructure investment is 1.16 billion yuan, 1.38 billion yuan and 1.62 billion yuan, the total investment amounted to 4.16 billion yuan.  To keep the green hills is to keep the wealth, there is data for: the first half of this year, Guilin social fixed asset investment growth of 101.9% per cent, while the Lijiang River water quality year-round maintained in more than two categories, the first half of the city's air quality in the second level above, one of the days of 134 days, accounted for 74%, a larger range of growth. Good scientific development situation and ecological environment, attract Chinese and foreign tourists to follow: the first half of this year, a total of more than 7.92 million visitors, tourism revenue reached 5.219 billion yuan, the year-on-year growth of 22.61% and 38.18%, are all created a new record in the same period.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.