The real reason for this is that Linzhou 23 million "on the big pressure small" subsidy is checked "Caixin net" (Comprehensive media report) Henan Linzhou to complete the "energy saving and emission reduction" mission to stop heating the people, after the news, the media follow-up report found that there are other reasons, the real reason is Linzhou 23 million "on the big pressure small "The subsidy is being checked. According to the "Beijing News" reported that Linzhou two thermal companies to stop heating, is due to provide a heat source of the power plant to create a promotion shutdown. And the Linzhou power plant shutdown, is due to the behavior of the money to be found. The newspaper said that, in 2007, Linzhou for the launch of Datang 2x30 million kw generator set project, put forward to shut off the power plant and other related power plants, so that the state "on the big pressure small" subsidy of 23 million yuan. But since then, the power plant is still generating electricity. But last December, in a routine inspection, the NDRC found that the power plant, which should have been shut down, is still generating electricity. Subsequently, the NDRC requested that Linzhou take measures to the power plant under the premise of safeguarding people's livelihood. January 5, the three towers of the excellent power plant were blown up. And the heat company in the "expired" the day before the notice. According to BCC Network reported that the excellent Chong power plant belongs to the "big pressure small" to be eliminated in the small unit, but it was 2005 years before the production and the energy-saving transformation, still in service, not in the mandatory shutdown of the list. Linzhou's decision was only to get subsidies. According to reports, the violation of the incident, the National Development and Reform Commission ordered Linzhou refund of 23 million yuan subsidy, and a fine of millions of yuan, and is jointly with the monitoring department to investigate the matter. Recently, media reports, from January 4 onwards, Henan Linzhou suddenly stopped the collective heating, and was told that this winter to stop heating, no longer restored. At that time Linzhou announced the reason: In accordance with the national energy-saving emission reduction requirements, shutdown for two thermal companies to provide heat source of the gifted power plant is a dead task. After the incident aroused public concern, the Linzhou government came forward to "explain", but more and more black. According to the Beijing News, at present, Linzhou two thermal company, the pipeline of the green-kun heat company temporarily connected to the medium-rise steel company boiler, began heating. Power source Thermal Co., Ltd. is a power plant to set up diesel boilers. Henan Electric Power Company ordered January 13, with immediate effect to increase the Linzhou 50,000-kilowatt load indicators to solve the immediate demand. (Caixin reporter Wangsu)
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.