Shenzhen and other special economic zones are celebrating their 30 birthday today

Source: Internet
Author: User
Keywords Today the first
BCC Beijing August 26 News According to the Chinese voice of the "Yang News" 11:10 report, Shenzhen Special Zone, 30. 30 years of the SAR time, Shenzhen speed to create a story in Shenzhen, Shenzhen Miracle. Today is the Shenzhen Special Economic Zone 30 anniversary of the date of the node, China's voice multi-channel reporters rushed to the SAR construction line, the scene to describe the impression of the SAR, guests on the new direction of the SAR in the future. New energy is a banner of Shenzhen's economic development, while in Shenzhen, when it comes to energy construction, Daya Bay is no doubt the landmark of this coastal zone.  Now we are connecting with the Chinese voice journalist Wang Xian, who is interviewing the Dayawan nuclear power base in Shenzhen.  Moderator: For many people who have never had access to a nuclear power base, nuclear power may have a certain mystique, can you give us a description of what you see in front of the Dayawan nuclear power base? Reporter: In fact, I am now in the position of Dayawan nuclear power base of a commanding point, I can now basically bird's eye to about dozens of square kilometers of the entire Dayawan nuclear power base part of my face is sea level, because today is very good weather, so the whole sea level gives a very calm feeling, At this point in time, I am actually playing a very powerful nuclear power base also gives a very calm feeling, because the original Dayawan nuclear power base where it is obviously Ling, so many of the projects here are named Ling O, now in my West is Ling AO Phase two reactor workstation nuclear power plant work site, The east side is the site of the commissioning of the two reactors in Leo phase two, in fact, because the reactor is completely sealed, I have been to enter the Dayawan nuclear power base, has been feeling the first is very very quiet, the scene in addition to be able to hear some of the very low noise of machinery, the whole is from the voice of nature, The scene may be through the microphone can not hear very clearly, around me not only can hear the voice of birds, in addition to the sound of small insects called also heard very clearly. Indeed very quiet, in fact this time the Daya Bay is not a rest, is working at Daya Bay but still very quiet, and in fact, I now in front of the vegetation is very good, because this is the hilly area, the staff to me, the original in the mountains here in these trees, Woods and so on the previous creatures are keeping their wild state, including the birds are now flying very low, I would like to share with you when I came to Dayawan yesterday when I entered the two phase of the main control of Ling AO work space experience, is actually very strict process, Although the whole Dayawan base is a completely natural relaxing state of the original ecology, but when I want to enter the work space first must wear the helmet, at that time passes through the security time to take off the body all metal goods, the colleague colleagues even took off their belt, passes through three way to enter the password the password door, The whole process of entry gave me a very tight feeling, but it was quiet and graceful. In fact, I think if the audience friend also has the opportunity to come to Dayawan, here gives you the first impression should be more like a park, the second printingLike a more rigorous workplace. Moderator: Today is also the use of voice to take us to the base to see, as a new energy model of the engineering base, Daya Bay nuclear power can meet the needs of how much?  From the quantization to introduce to us, but also vivid to us to introduce how much it can be satisfied? Reporter: Yesterday I also to the staff probably made an understanding, now actually at Daya Bay Nuclear power station is working is to have four million kilowatts of nuclear power plant, equivalent to how much can meet? To quantify, the equivalent of the entire Shenzhen 1/3 of the total electricity consumption, just now the staff told me that the current test run Ling O Phase two reactor last night is the first time to achieve full power operation, that is, reached 10.8 million-kilowatt, what is this concept?  Also equivalent to Ling O two of its hourly output is equivalent to 300,000 families a day of electricity consumption, for some prospects of new energy nuclear power, I am standing next to a veteran of our nuclear power work, and he is also Deputy Director of the Office of the Sou Saint, Mr.  Moderator: In fact, we are now concerned about the new energy may be more concerned about its future output, how much contribution, Daya Bay in this area is there any planning, can give us a long-term blueprint? Sou Saint: According to the National Nuclear power Long-term development plan, our country by 2020 the proportion of nuclear power will reach 4%, is currently 1%.  Nuclear power has become one of the world's three major energy pillars, thermal power, hydropower and nuclear power in the world, the proportion of nuclear electricity accounted for 16%, our country is now only 1% of the state, in the future in our country vigorously develop clean energy when nuclear power also has a wide range of development prospects. Moderator: There is another question, perhaps our listeners are more concerned about, our Daya Bay development of new energy, is nuclear power generation, this side of the security is how to achieve it?  Just now we reporter said, to enter the base of words to go through a lot of checkpoints, specific security how to do? Sou Saint: Safety and security according to the current nuclear power technology development today, the entire nuclear power plant from the design considerations, design, construction, equipment manufacturing to operate at all stages have very detailed norms and standards to ensure security. From the design stage we'll consider the principle of a solemn defense, design multi-channel barriers to prevent the release of radioactive (material) to the environment, the construction process in the process of equipment manufacturing and construction always adhere to safety first, quality first, in strict accordance with the quality standards of manufacturing equipment and construction of nuclear power plants, in the operational phase is also, in accordance with international standards, International nuclear power plants have operating standards, our country now also perfected the nuclear power plant operating standards, in strict accordance with the standards and regulations, as well as our technical requirements to operate to ensure the integrity of the barrier to prevent the release of radioactive (material) to the environment, the Daya Bay nuclear power plant now launched in 94 to now run 16 years, Now the radiation levels in our entire perimeter are maintained.In the original radiation the overall level did not change to the environment.  Moderator: New energy is also a banner of Shenzhen's economic development, we also look forward to nuclear power generation at Daya Bay and even say that the whole of China's nuclear power generation can account for a higher proportion, thank the Deputy Director of the Soviet Union also thanked our reporter Wang Xian brought the report. I also want to share with you the time when I came to Dayawan yesterday, when I entered the two-phase master-control workspace of Ling O, it was actually a very rigorous process. Although the whole Dayawan base is a completely natural relaxing state of the original ecology, but when I want to enter the work space first must wear the helmet, at that time passes through the security time to take off the body all metal goods, the colleague colleagues even took off their belt, passes through three way to enter the password the password door, The whole process of entry gave me a very tight feeling, but it was quiet and graceful.  In fact, I think if the audience friends also have the opportunity to come to Dayawan, the first impression here should be more like a park, the second impression is more like a rigorous workplace. Moderator: Today is also the use of voice to take us to the base to see, as a new energy model of the engineering base, Daya Bay nuclear power can meet the needs of how much?  From the quantization to introduce to us, but also vivid to us to introduce how much it can be satisfied? Reporter: Yesterday I also to the staff probably made an understanding, now actually at Daya Bay's nuclear power station is working has four million kilowatts of nuclear power plant, for everyone to quantify, equivalent to the entire Shenzhen year 1/3 of electricity consumption. A moment ago, the staff told me that the two-phase reactor at Ling O is now being tested, and it was the first time that the full power operation was realized last night, that is, what was the concept when it reached 10.8 Million-kilowatt? In other words, Ling O two per hour of power generation is equivalent to 300,000 families a day of electricity consumption.  As for the prospect of new energy nuclear power, I am standing next to an old-timer who works for nuclear power, and he is also Deputy Director of the Office of the China-Canton Nuclear Group, Mr. Sou Saint.  Moderator: Hello, Mr. Su, in fact, we are now concerned about the new energy may be more concerned about its future output, how much contribution, Daya Bay in this regard is there any planning, can give us a long-term blueprint? Sou Saint: According to the National Nuclear power Long-term development plan, our country by 2020 the proportion of nuclear power will reach 4%, is currently 1%.  At present, nuclear power has become one of the three major energy pillars in the world, including thermal power, hydropower and nuclear power, in the world, the proportion of nuclear electricity accounted for 16%, our country now the state is only 1%, in the future in our country vigorously develop clean energy, nuclear power also has a broad development prospects. Moderator: There is another question, perhaps our listeners are more concerned about, our Daya Bay development of new energy, nuclear power generation, this side of the security is how to achieve it? Just now our correspondent said that to enter the baseAfter a lot of road checkpoints, how to do the specific security protection? Sou Saint: Nuclear power technology development today, the entire nuclear power plant from the design considerations, design, construction, equipment manufacturing to operate at all stages have very detailed norms and standards to ensure security. Design a multi-channel barrier to prevent the release of radioactivity (material) to the environment, in the process of equipment manufacturing and construction always adhere to safety first, quality first, in strict accordance with the quality standards of manufacturing equipment and construction of nuclear power plants; in the operational phase, in accordance with international standards, nuclear power plants have operating standards, Now our country has also perfected the operation standard of nuclear power plant, strictly according to this standard and the regulation still have our technical request to run, guarantee the integrality of the barrier, prevent the release of radioactivity (material) to the environment. The Daya Bay nuclear power plant was put into operation for 16 years, and now the radioactivity level of our whole surrounding environment is still at the original level, and there is no change to the environment.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.