The Land ministry Sword refers to the hoarding and tracing of the flood

Source: Internet
Author: User
Keywords National territorial Ministry of Land and Resources
Tags all levels basic data local site use
Land Grant is one of the major causes of land hoarding.  Ministry of Land and Resources 22nd on the national land departments at all levels to decorate a work ——— to carry out the second National Land survey, "batch but not used" land verification work. The Ministry of Land and Resources said that the "Grant without use" site verification is to ensure that the second national Land Survey data is true and accurate.  "Batch but not used" land in the second national Land Survey belongs to the construction land, carry out the "batch but not use" the site verification work is to approve the construction of local area and area, master all the real land basic data necessary measures. The Ministry of Land and resources requests that the provincial (district and municipal) administrative departments of land and resources, in accordance with the "Batch without using the" Land verification record form provided by the "batch but not used" plaque related information, to collect and find the original documents of the land grant, examine carefully the authenticity and validity of the "Grant without use" documents, and determine whether the documents are true and  Whether or not to authorize the use of land according to law, check the approval of the construction of the site, area, scope and so on, and the verification results are completed in the "batch without the use of" Land verification record form. "The State Land inspectorate in each place is responsible for the inspection of the results of the verification, the formation of supervision results." At the same time, the Ministry of Land and Resources will organize the Joint Inspection Unit to review and verify the results of inspection, spot checks.  Check the inspection checks lax, fraud, will be strictly investigated and investigated, accountability, and to be informed. As requested by the Ministry of Land and Resources, all localities will complete the verification of the "approved and unused" land before December 15.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.