There was once a project on establishing a website providing some basic functions such as showing data from a database, Searching for some certain data and so on. Initially, I was considering to spend three weeks on this website project, both weeks to implement all the functions and th e Rest to design the user interface. The whole subject is accomplished by JSP and HTML. However, things didn ' t go as the
code, or designing for a product setup, still doesn't look that smooth.3, the advantages and disadvantages of TRAC:Pros: Very flexible and can be controlled with SVN integrationCons: The function is not very powerful4, the advantages and disadvantages of Bugzilla:Advantages: Free, with Chinese version supportCons: Fast search results are inaccurate. Only defects can be managed.5. Advantages and disadvantages of Apple Xcode:Advantages: Very fast compilation, fast and easy for each operation. Aut
How to demonstrate the product:
The speech focuses more on the statement of views on a certain issue. It mainly exchanges views and allows contention. The audience may disagree with your views, but will certainly defend your right to speak.
Purpose of presales demonstrationIntroduce the company, and display the company's image through your own words and deeds and product introductions;Strengthen your own advantages and set technical thresholds for competitors;The more users care about what
indicators to do what can improve performance, and do nothing that cannot improve performance. So there are a lot of things that are actually very important, but it is difficult to quantify them, so no one cares about what nobody does. At least in the short term, it is impossible to have such a perfect performance system.
17: 10
For example, I now feel that our demand analysis is poor. Because we don't have time to do this. We only have a month or two. It's impossible to fully understand it.
The boss went out to recruit people and threw a document before leaving: project implementation 9 Yin Zhenjing, surpassing competitors-18 Practical Skills of software project managers
The document does not contain the author's name, and I have not checked the source.
Let's see it first.
Here we will record the good sentences and personal insights in the docume
The fifth chapter overall design 1. Design process, the overall design is usually composed of two stages: System design phase: To determine the specific implementation of the system; Structure design phase: Determine the software structure. 2. The Nine Steps (1) of the overall design envisage alternative programmes, platforms, and technical certainty, using newer technical programmes as far as possible. (2) Choosing a reasonable scheme, usually at lea
The most recent interesting project is to be the front-end of the "counselor duty escalation system";This system is a back-office management system, for the instructors of the college to report on duty, the Ministry of Science and Engineering leadership in time to supervise and assign duty tasks;1. The initial target includes adding and deleting the information function, setting different permissions, positioning function, assigning the watch function
How to Write a solution:------ Introduction ---------------------It is not difficult to write a solution, but it is difficult to know how to write it.If there is a structure, there are ideas and solutions.In addition, those who actually write a solution will never be satisfied with the solution they have written. The only way to do this is to make a little progress every time, and the quality of the Solution level will grow with the company's capacity.
------- Four entry points ----------------
Google Pagespeed mod
4. Subversion
1) install directly from the source
$ Sudo apt-get install subversion
2) create a database
$ Sudo mkdir/var/svn cd/var/svn
$ Sudo svnadmin create repos cd repos/conf
3) Configure permissions
Configure svnserve. conf. Note that no space is left at the beginning of each line.
[General]
Anon-access=Read
Auth-access=Write
Password-db=Passwd
AuthzAuthz-db= Authz
Realm=IALSSVN Repository
Configure passwd
[Users]
RedmineRedmine= Redmine
Configure a
began to pilot the application of the network program in various national departments, comprehensively arrange the guiding ideology, and name this method "overall planning method ". The Network Planning Technology has been effectively promoted in domestic production and construction. I. Development and Current Situation of project management software The development of
Project management is closely related to the quality, efficiency, and final results of software development, this article describes the software project risk assessment, cost budget, customer communication, needs analysis, development management, finished product delivery and other processes.In today's domestic project
First, the intention of the customer two, the customer booking List III, risk assessmentSoftware project risk refers to the cost budget, development progress, technical difficulty, economic feasibility, safety management and other problems involved in the whole project cycle, and the impact of these problems on the project. The risk of the
During project development, 13 types of documents should be prepared as required, which should be targeted, accurate, clear, complete, flexible, and traceable.
◇
Feasibility Analysis Report: Describe the technical, economic, and social feasibility of the implementation of the software development project, and comment on various possible implementation schemes ava
Software project risk refers to the budget and progress encountered in the software development process and other aspects of the problem and the impact of these issues on the software project. Software
Introduction
The software Capability Maturity Model (SW-CMM), released by SEI in August 1991, it is used to evaluate the maturity level of software enterprise, so that the software Enterprise understands its advantages and disadvantages, so as to continuously improve the software development process, improve the manag
Content: Software project and process management course content SummaryAfter eight weeks of learning, software projects and process management courses are nearing the end of the day. Through this eight-week study, I have a deeper understanding of software projects and process management courses.First, about the team pr
Cost management is one of the main contents of software project management. It analyzes the problems existing in the current software development cost management process, and puts forward to consider linking progress with cost, the method that matches the workload with the actual cost. Based on the existing estimation method, the cost management system is designe
the project team members at all stages of the project life cycle;
C) report the project progress and difficulties in the project development process to the leaders on a regular basis.
D) configure, manage, and plan the project.
E) control the progress of each member of the
Why have we been plagued by problems such as the Development delay of software development projects, the cost exceeding the budget, and the inability to guarantee software quality? I never think that the main problem that arises is that the project management method is insufficient, the software engineering cannot be u
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.