The more you try, the luckier you get.--51cto PMP Hundred Days Preparation notes (PMP4期VIP备考群180908 唐尧) After one months of long wait, finally received the PMI e-mail, when the first sight of "congratulations", excitement and excitement is difficult to suppress, clenched fist to himself shouted "yes! "Once again it's my motto," The more I try, the luckier I get.Last hav
The more you try, the luckier you get.--51cto PMP Hundred Days Preparation notes (PMP4期VIP备考群180908 唐尧) After one months of long wait, finally received the PMI e-mail, when the first sight of "congratulations", excitement and excitement is difficult to suppress, clenched fist to himself shouted "yes! "Once again it's my motto," The more I try, the luckier I get.Last hav
PMP: "flattering", changing life :)
PMP? What is the abbreviation of coops !?
Of course not, full name is project management professional (detailed content can refer to the "zengjibing article" http://blog.csdn.net/zengjibing/archive/2009/02/13/3888892.aspx), is a project management certification examination, 2008 ranking it hot certification 4th.
But why is it called the "flattering" test? It is said tha
Pt-pmp, mysqlptpmp
Pt-pmp has two functions: Obtain the stack information of a process, and summarize the stack information.
The stack information of a process is obtained using gdb. Therefore, the performance of the mysql server may be affected during the process.
In official words:
This will freeze the program for some period of time, ranging from a second or so to much longer on very busy systems with a
PMP, full name is Percona monitoring Plugins, is a plugin written by Percona company for MySQL monitoring. Support Nagios,cacti. Starting with PMP 1.1, Zabbix is supported.Below, see how to install the PMP on the Zabbix.Configuring the Zabbix AgentDownload PMP: https://www.percona.com/downloads/percona-monitoring-plugi
I am from 51cto PMP certification micro-position 4 intensive Class (1809) Xie An, first said say and 51cto how to make a bond. 12 University electronic Information engineering after graduating as a two-year communication soldier, 14 out of social work is the first job of the game server operation, internship because the company has requirements for Linux server, not Ah, the university has not learned, how to do, after their own internet search found 5
Today, I finally officially received the PMP certificate, which was delivered by shenzhoujulong via express delivery. A total of two envelopes are included.The small envelope contains a congratulatory message written by PMI manager Denny Smith and the correct rate of completing the questions at each stage of the exam.The big envelope contains a PMP certificate, a PMP
No relevant management process or policy;
No good planning;
(a) Inadequate resources (people, funds, equipment and tools);
Lack of training, no relevant knowledge and skills required;
The project stakeholders are not sufficiently identified and the stakeholders are not fully involved;
Lack of configuration management, change control, and version control;
High-level no real-time monitoring project;
Failure to accumulate, summarize
Registration: registration is made at least three months in advance on March 3, 6, 9, and December each year;Organization: Training Center of the State Bureau of Foreign Experts;Web site: http://www.chinapmp.net;Question type: PMP consists of 200 multiple-choice questions, 25 of which are not scored. These questions are used to collect and analyze statistical data and determine whether to include them in fu
The PMP certificate will expire at the end of the year. The certificate is updated in the past two days and shared with friends in need.
Before applying for a new certificate, you must ensure that you have 60 PDU in the PMP period:
1. Contact the PMI Asia Pacific Service Center. There are two ways, one is by email, the mailbox address is: asiapacific-sc@pmi.org; the other is a direct call, the number is:
Overall, I was lucky, 40 days from the Internet to learn that 51CTO college opened this course (because I have more than 10 years of work experience, relatively easy to understand), to the successful registration, the test time is 40 days, Kung Fu is not a conscientious! One pass. Not much experience, just to share your personal learning methods and skills, for reference only. At the beginning of the study, like "Zhang two monk can not touch the head", I also spent 1 days to check the online tho
It is said that the first simulation question of PMP is generally about 20%, and I spent about 3.5 hours doing it again, basically, I jumped over without feeling or reading the question. Therefore, it takes less time. The final result is still satisfactory. There are 200 questions, 91 errors, and the correct answer rate is about 55%. However, there is still a gap between 61% and the pass rate.
I think it is very necessary to perform a simulated quest
I am a member of it from Ningxia Yinchuan, engaged in IT industry 10, engaged in IT management 6 years, has not taken the PMP exam, one is no time, two is no confidence, this year in the online and 51CTO teacher chatted for a long time, Wang teacher class magic voice, and 51CTO School's reputation, Let me decide to take the PMP test on September 8, 2018, from June 5 to the official entrance to September 8 f
PMP has four times a year (this year seems to have changed to five times. For details, you can ask). They are in May March, May June, May September, or may December, and are generally the last and last weeks of the month. The test generally takes four hours from nine o'clock A.M. to noon. The exam in China takes the form of a written examination. There are a total of 200 single-choice questions, both in Chinese and English. Among them, there are 25 ma
meeting), the organization structure of the project has been established, and the roles and responsibilities of the team members have been defined.
5, already has the document: At this time the project management plan which is used to instruct the project has worked out, therefore, in the commencement meeting, usually needs to the project scope, the progress, the cost, the risk response and so on the matter to confirm, and the stakeholder to reach the consensus.
The
(1) The advantages and disadvantages of the Project organization : excellent: Project manager power, lack: the dissolution of anxiety, no promotion of power, not conducive to the accumulation of professional technology, equipment duplication, it is difficult to ensure the full use of resources.(2) The advantages and disadvantages of matrix organization : Excellent: High resource utilization, horizontal information communication, Project Manager power improvement, and ability to develop professio
Process: PMP often refers to the process, as if it is very tall, but in reality, the process is a series of actions and activities , used to create predetermined products, services or results. It's so simple. In further detail, actions and activities will certainly have ITTO (inputs, tools and techniques, outputs).Feasibility Study: After the feasibility analysis, decide whether the project will continue. A feasibility study is often the basis for the
Definition of the project A project is a temporary work to create a unique product, service, or outcome. The project is the operational needs of the Organization and the strategic objectives of the service. The PMBOK guide describes the project management knowledge, in essence, is used to manage medium or higher scale, cross-departmental, cross-discipline purposes. The project in the PMP exam is usually also a project of this type. Three special new f
generally appears to be a fixed mandatory date. If the project is carried out under the contract, then the contractual terms are often a limiting factor.A hypothetical condition is a factor that is not currently determined, is not validated, but is still considered correct, true, or deterministic. Assumptions are uncertain and affect all aspects of the project planning, and if the assumptions are not established in the course of the implementation of the project, the hypothetical conditions oft
supervision, and as the project progresses, the scope specification needs to be modified and refined to reflect changes in the project itself and the external environment. In the actual project implementation, whether for the project or the sub-project, the project management personnel will have to write their respective project scope statement.Work Package: The work unit at the bottom of the WBS is called a work package, which is the basis for defining the scope of work, defining the project o
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.