I have participated in many weekly project meetings. So far, no project manager has been able to implement more than four projects (including four items) to the owner at the weekly meeting :(
Mentality analysis:
A project and project must be coordinated by multiple parties, such as owners, supervisors, consultants, implementers, and interface providers. It is a normal task to assign work to all parties, including for our owners;
Our colleagues
Meeting time : 2016.june.7 1:00~2:00Chairperson: Kirill Zaitsev, from MirantisMeeting Summary:1.Action Item ReviewUpdate the wiki to mention new CPLs.KZAITSEV_MB Ping stable Reviewers to review the Backports.2.Murano packages move into Murano-appsThe leave Murano-core team as part of the Murano-app-core.I believe that Murano-apps should contain only small apps that demonstrate Murano capabilities. Everything else should is somewhere else under someone
/** 253.Meeting Rooms II * 2016-6-20 by Mingyang * greedy algorithm, and rearrange array to certain distance like */ Public intminmeetingrooms (interval[] intervals) {if(Intervals = =NULL|| Intervals.length = = 0)return0; Arrays.sort (intervals,NewComparator(){ Public intCompare (Interval i1, Interval i2) {returnI1.start-I2.start; } }); //use heaps to manage the end time of a roomPriorityqueueNewPriorityqueue
Meeting time : 2016.july.12 1:00~2:00Chairperson: Kirill Zaitsev, from MirantisMeeting Summary:1.Action Items ReviewAbout Agent Versionsand TBH I ' ve decided to leave it's the it's it's for this cycle,Since we already have N1 beta releaseTo make it clean and clear for everyone involved.2.Open DiscussionHere are a commit to infra, which adds py27 jobs with Mitaka reqs on master.The idea was to ensure we can install Master Murano on top of Mitaka code.
I. Standing meeting Information The second stage of the team's sprint phase 15th day.After getting up early, the team members are re-explaining and complementing everyone's plans, agreeing on tasks that need to be completed today, and reviewing and summarizing the team's progress.There is a picture of the truth:Ii. Schedule of tasksToday we started the task of the revision and integration, put everyone's things out to see what there is no disagreement
I. The process of meetingIn the last 20 minutes of class in the afternoon of Monday, our group conducted a summary meeting of the Alpha version of "Class School". The first thing to do is to analyze the current version of the situation, everyone said their progress, including the completed and is about to complete. This is followed by an analysis of the problems that existed during the development of the previous period, with each person making a summ
At this meeting we identified the next task and summed up the tasks of the previous phase:For the previous stage, the following points need to be noted:1, the interface is not unified, using different plug-ins2, the interface does not integrate together3, follow-up to the interface to do it againFor this phase has entered the critical stage of our project: the establishment of back-end code, including the operation of interacting with the databaseThe
Daily Task content:
Name
Today's mission
Tomorrow's arrangement
Jinhao
Follow Up Server status
Understanding the internal mechanism of crawlers
Gudaxin
Try to connect to the crawler database and get the database format by reading code and blogsBasic understanding of Crawler data storage location complete data extraction
Define the database format, complete processing to complete the data upload to the online system server
group name: flying daughter policeproject name: Gift Selection Gadgetteam members: Shen Besan (group leader), try, Yang Yuning, Tan LimingCode Address: Https:https://git.coding.net/shenbaishan/gift.gitSsh:[email Protected]:shenbaishan/gift.gitmeeting time:2016-11-9 13:00-----13:30Meeting content:A. Completed item:① confirm the final presentation of each module--try② trial Run the final program--Shen Besan③ recording pre-release video--Yang YuningTwo. Program Completion:① Plus data② record
group name: flying daughter policeproject name: Gift Selection Gadgetteam members: Shen Besan (group leader), try, Yang Yuning, Tan Limingcode Address: HTTPS:https://git.coding.net/shenbaishan/gift-selection.gitSSH: [email protected]: Shenbaishan/gift-selection.gitmeeting time:2016-11-29 13:00-----13:30Venue: First Floor Hall of graduate teaching building, headquartersMeeting content:A. Completed item:①bug Statistical Report--Shen Besan② record final release video--try③ final Test for final vers
group name: flying daughter policeproject name: Gift Selection Gadgetteam members: Shen Besan (group leader), try, Yang Yuning, Tan Limingcode Address: HTTPS:https://git.coding.net/shenbaishan/gift-selection.gitSSH: [email protected]: Shenbaishan/gift-selection.gitmeeting time:2016-11-29 13:00-----13:30Venue: First Floor Hall of graduate teaching building, headquartersMeeting content:A. Completed item:① guess you like the module--Shen Besan②bug Finishing Correction-try③wbs drawing--Yang YuningTw
Meeting time : 2015.november.4th 1:00~2:00Chairperson: Serg Melikyan, PTL from MirantisMeeting Summary:1.Tagging LibertyPIC: Kirill Zaitsev Desc: Murano is still in Liberty 1.0.0 version.Kirill would try to tag stable Branch 1.0.1 in this week,And everything seems to being fine with it.2.Jenkins Gate ChangedDesc: The GATE-MURANO-DEVSTACK-DSVM is useless now for muranoclient patches verification, and would be disabled.This work should is done in the Op
Frequency analysis Model1. This station will be opened in Tuesday, but because of my personal negligence, hey, don't say.2. Meeting time: March 29, 2016 12:03~12:30.Duration: 27 minutesMeeting Members: Group leader: Yang Joppeng http://www.cnblogs.com/robinYangRP/Member: He Meichi http://www.cnblogs.com/heyjoymq/Tibet Yun Qiang http://www.cnblogs.com/zangrunqiang/Guo Ming http://www.cnblogs.com/guoyouming/1 This time compared to the last to see the im
Frequency analysis Model1. Meeting time: March 31, 2016 12:07~12:30.Duration: 23 minutesMeeting Members: Group leader: Yang Joppeng http://www.cnblogs.com/robinYangRP/Member: He Meichi http://www.cnblogs.com/heyjoymq/Tibet Yun Qiang http://www.cnblogs.com/zangrunqiang/Guo Ming http://www.cnblogs.com/guoyouming/1) After the last discussion and analysis, this member's goal direction is more clear, the programming aspect also has the slight enhancement.
Meeting time : 2015.september.8th 1:00~2:00Chairperson: Serg Melikyan, PTL from MirantisMeeting Summary:1. Future ofSTACKFORGE/YAQL.Action: The OpenStack community choose a date upon which to perform a mass migration of all stackforge/projects into openstack/.The date is either October or November 7 (both Saturdays),As least likely to interfere with the release or summit.The community create a wiki page for all such projects toEither sign up for this
In the evening to the youth road to participate in the Wiz Notes hosted knowledge sharing meeting, feel that many of the knowledge of the ideas themselves know, but if you want to speak to yourself also may not have the night to tell the good, in fact, the most important is to tell stories, combined with visual storytelling, it is best to tell their stories, I can not tell my own story, tell me what kind of lively and interesting stories I have listen
Group Name: dmAttendees: Zhang Jinghen, elegant, ho Yue, Zhao, Wang ZixianProject Progress:1. Zhang Jinghen: After sifting through the elements, the optimization of the last yesterday to test, for further testing. For elegant and Zhao students to write code for further review and assistance.2. Elegant: Improve the refinement and grooming of the code to further deploy the design of forms and structures.3. Zhao: Continue to complete the code collation, write a general framework of the program, con
Meeting time : 2016.may.10 1:00~2:00Chairperson: Serg Melikyan, from MirantisMeeting Summary:1. Murano Contributors Rules
Six usage Rule: Use it if the really necessary (for example if existing code would now work in Py3 at all. If It is a matter of performance only prefer readability
Do not import functions. Only module Imports is accepted
Commit-names for Murano-apps repository, i.e. [Apache] or [Kubernetes] on
Meeting time : 2015.september.22th 1:00~2:00Chairperson: Serg Melikyan, PTL from MirantisMeeting Summary:1.About PTL CandidacyPIC: Serg MelikyanDesc: Our PTL (program Technical leads) Miss deadline for sending he candidacy as PTL for the next cycle.So it's up to TC (Technical Committee) to assign PTL for Murano.But I think he's still the Murano PTL for the next cycle.becasue lots of people support him. Link: https://wiki.openstack.org/wiki/PTL_Electio
team.
Id
Names (name)
Importance (IMP)
Initial estimate (EST)
Annotations (note)
Claiming person
1
Cloud Server Environment Configuration
5
3 (Day)
Fundamentals of Operation
Miukinmin
2
Building the underlying database
6
1
Fundamentals of Operation
Wang Wenchi
3
User Login, registration
7
3
Basic functions
Wang Wenchi
4
Pe
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.