indicates that startup is successful.Cacls.exe display and Edit ACLCdplayer.exe CD playerChange.exe query related to the terminal server (XP unavailable)Charmap.exe character ing tableChglogon.exe start or stop session records (XP unavailable)Chgport.exe port change (Terminal Service) (XP unavailable)Chgusr.exe Change User (Terminal Service) (XP unavailable)Chkdsk.exe disk detection programChkntfs.exe NTFS disk detection programCidaemon.exeCipher.exe displays or changes encrypted files or direc
. The Chinese use a two-way linked list to write the Linked List class with the data structure book. The Indians opened a large array and then started to work. Why are Indians not using linked lists? 1. The devices (minicomputers) You provide have at least MB of memory, which is nothing to waste. 2. Convenient array access and high efficiency. I can see that when I get something, I just need to write code. Is it different from performing software analysis? A few of my colleagues came back from I
A few months ago, I came to work in a communication company from a software company and entered the billing and Information System Department. This Department maintains several important systems in the company: business, billing, accounting, customer service, resource management, business analysis, and product sales. These systems are the basis of the company's business. After several months of busy work, I gradually became familiar with my colleagues and working environment, and became more and
clipboard ViewerClipsrv.exe run the clipboard ServiceClspack.exe create a list of system filesCluster.exe displays the cluster of the domain (XP unavailable)Cmd.exe is added to 2000 \ XP DoSCmdl32.exe automatic download connection managementCmgr32.exe Connection ManagerMonitor the Connection Manager of CMMs 32.exeCmstp.exe Connection Manager Configuration File InstallerComclust.exe ClusterCommand cmd Command PromptComp.exe compares the content of two
layout, the important information mentioned in "don't let me think" is placed in a prominent position, these things need to be re-designed constantly.
6. Arrange the time reasonably
Including arranging your own time and team time properly.
You should spend most of your time on project management and should not be stuck in a certain technical difficulty.
Meetings required for team management must be held, and meetings not required, such as regular meetings or so. If there is nothing to do, it wi
relationships are relatively simple.
3. Standardization: Through the level 5 of CMMS, the internal departments can also implement level 3 or Level 4 standards.
4. Title: the new employee refers to the old employee and teacher and feels like a school.
5. company brand: in Shenyang, he said he was from Neusoft and he still had a number near Dongda.
Neusoft's disadvantages:
1. Culture has deteriorated: At the beginning, the simple culture gradually beca
:
The people who implement the regulations, the persons who supervise the implementation of the regulations, and the professional qualities of managers at all levels determine whether the regulations can be implemented! If the rule is in front of these colleagues,When you are in favor of yourself, you will not talk about norms when you are in favor of yourself., It will be a very dangerous problem, and eventually lead to over-level authentication of CMMs
CMM/cmme is considered to be the most mature and effective method and standard for improving the software engineering level. It is used to evaluate and improve the process, it is a framework that describes the key factors to be improved in the software development process. It describes a way to improve in a progressive manner. It provides a foundation for software process improvement and changes software development from a relatively casual and immature process to a very mature, regular, and man
tools for measurement data analysis. Specific metric requirements involved in Level 4 of CMMs:
1. Determine the project objectives based on the business objectives and the project objectives2. Select the most valuable sub-processes for quantitative management based on the quality and performance objectives, with granularity up to sub-Processes3. Use statistical methods and ideas instead of simply using SPC4. QFD can be decomposed layer by layer to se
"Grassroots", and at last the upper layer and the boss
Most of the proposals for adopting agile methods are raised from the actual development team and terminated by the boss or the boss's boss. The reason is simple. Front-line technical staff (Technical fans, technical angry youth, and technical guru) are more sensitive and strongly interested in new development methods. They often propose suggestions for improving existing processes. However, many agile methods involve changes to existing pro
project process, which is not applicable to the current team; second, most of the early projects in the telecommunications system solutions division were transferred from the U.S. to China. Many of these projects were not managed using CMM/cmme at the U.S. headquarters, we do not need to draw out any CMM in China. Third, agile is well known, and the telecommunications system solution Division does not need to use the CMM name to attract business for itself.
When talking about the third article,
With the popularization of 3G technology and the development of wireless standards and technologies such as LTE, NFC, Bluetooth 4.0, cmms B, and MIMO, mobile Terminals need to integrate multi-band main antennas (supporting 2g, 3G, LTE and other multi-standard), as well as GPS, BT, WiFi, NFC, wireless charging and other antennas.
As a result, terminal antenna engineers are facing huge challenges:
Antenna size
-The cell phone size is getting smaller and
destiny". This type of programmer has never been self-motivated. In this case, if the direct supervisor does not provide a warning or a little thrust, five years or eight years later, this person may be finished. Isn't this a more important part of team culture construction?
It is easy to check whether the management of yourself or your superiors is false:
Do employees know what their resumes can look like after three years?
In this process, what kind of guidance does the boss give? In terms o
, agile software development, and cmme in the company? I will not explain it in detail here, but I will talk about Agile, cmme, and the status quo. If you have any mistakes, you are welcome to make a picture.
Agile Declaration
1Human and interaction over processes and tools
2. software that can work is more important than comprehensive documents
3. Customer cooperation over contract negotiation
4. Respond to changes at any time over compliance
Agile:Human and interaction over processes and tool
Software Quality Assurance (SQA-Software Quality Assurance) is a key process domain in level 2 of CMMs. It is a third-party independent audit activity that runs through the entire software process, common features that appear in the check and verification of most key process domains play an important role throughout the software development process. From the six key process domains included in level 2, whether it is requirement management, software pr
unavailable)Charmap.exe character ing tableChglogon.exe start or stop session records (XP unavailable)Chgport.exe port change (Terminal Service) (XP unavailable)Chgusr.exe Change User (Terminal Service) (XP unavailable)Chkdsk.exe disk detection programChkntfs.exe NTFS disk detection programCidaemon.exeCipher.exe displays or changes encrypted files or directories on NTFSCisvc.exe open the index contentCkcnv.exe convert cookieCleanmgr.exe disk cleanupCliconfg.exe SQL client network ToolClipbrd.ex
development process, with the in-depth understanding, we made some modifications to the cost estimation. Although I cannot know the real price of the project, I believe that the calculated cost will not be too far different from the original project cost.
The calculation procedure of the younger brother is: estimate the number of Function Points for the project-> Project Development workload (person-month)-> development cost/person-month-> total development cost. It is difficult to calculate th
busy. The Chinese use a two-way linked list to write the Linked List class in the book "Data Structure. The Indians opened a large array and then started to work. Why don't Indians use linked lists? They said:
1. The device (minicomputer) You provided has at least 512 MB of memory, which is nothing to waste.
2. Convenient array access and high efficiency.
I can see that when I get something, I just need to write code. Is it different from performing software analysis?
A few of my colleagues cam
China Mobile
Step 1: Set cmnet to access the Internet
New APN
1. Name: cmnet
2. APN: cmnet
3. APN type: Default
Only the above three options are entered. The other options are default and do not need to be entered.
Step 2: Set MMS
New APN
1. Name: CMMs
2. APN: cmwap
3. Proxy: 10.0.0.172
4. Port: 80
5. Username: (empty)
6. Password: (empty)
7. SERVER: (empty)
8. mmsc: http://mmsc.monternet.com
9. MMS Proxy: 010.000.000.172
10. MMS port: 80
11. MMS
I am still busy recently, and there is nothing special about it, that is, the life of the company's residential quarters on the 2.1 line. The blog update is not very diligent and still seems to have nothing to write.
The formal evaluation of cmmi3 is about to begin. This time, it plays the role of PM in a project of a company. The document has been around for a while, and the rest of the work is to participate in interviews. this is the thing about cmme. however, working overtime to get documen
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.