controllogix plc

Read about controllogix plc, The latest news, videos, and discussion topics about controllogix plc from alibabacloud.com

Siemens PLC Learning note 20-(use of multiple background data blocks)

The engine set consists of 1 petrol engines and 1 diesel engines, which is required to control the engine group with PLC, so that the speed of each engine is stabilized at the set speed, and the starting and delay of the cooling fan are controlled. Each engine is set with a Start button and a Stop button.The program is as follows:1. Program Module2. Symbol table3. Fan Control Program4. Starter Control5. Start the UnitNote: 1) Complete a local instance

Siemens PLC Learning Note 19-(FB programming)

The FB block can be called multiple times by the OB1, and all parameters and static data of the function are stored in a separate data block (DB) that is assigned to the function block, which is referred to as the background data block. When the FB is called, the background data block is automatically opened, the value of the actual parameter is stored in the background data block, and when the block exits, the data in the background data block remains.Below through the case design introduction

Data Types and addressing methods of memory in PLC

, word, and doubleword) A> byte (B): the continuous 8-bit binary number starting from 0 is called a byte. B> word (W): two adjacent bytes constitute the length of a word. C> double-character (DW): the adjacent four bytes constitute the length of a double-character. D> storage features of long and double-character data: high storage is low in bytes, and its position is high in bytes. 6. Negative (signed number) Representation A> negative expression: PLC

Siemens plc learning notes 3 (S7-300 signal module)

S7-300 PLC Siemens This is the second video study note of Yang Shengfeng. 1. Digital Volume Module 1) Digital Volume input module The digital input module converts the Digital Signal levels sent during the field process to the internal signal levels of the S7-300. A. Digital Input module sm321 (external 24 V power supply required) Sm321 has four types of modules: DC 16-point input, DC 32-point input, AC 16-point input, and AC 8-point input. Figure: B

Function Realization: PLC's volume Control to LPC

Design Scenario 1:On the PLC, when using qdial to adjust the volume, trigger the Qdial signal:valuechange (), corresponding slot sends the custom key code 0x22 to LPC;On LPC, when the 0x22 key is received, the operation: set the current volume value, when the setup is complete, the PLC will receive the volume data from LPC to update.Problem found:1, when the trigger valuechange () signal, due to LPC set 3s

PLC Learning 1

PLC Learning 1 By: Chen Hao Hardware plc: OMRON cp1h xa40dr-a. Example 1 Function Description: One switch controls one lamp. Hardware wiring :. L1 and L2/N: connected to AC 220 V COM and 00 (0ch channel): Access the Input Switch DC 24 V (I corresponds to the input address of 0.00) COM (first from the left of 100ch) and 00 (100ch): both ends are equivalent to one switch. 220v power supply and 2

Automatic loading and unloading equipment plc and touch screen design information

Because of a variety of reasons colleagues are very unpleasant to go, equipment is not moving up, is my life.Write a simple program, debugging equipment, the results of colleagues said the problem, not only the motor is not controlled. I had to check the program from the beginning, because the program is very simple, so certainly not a procedural problem. After a few troubleshooting equipment, it is found in a connection between the stepper motor driver direction control of the terminal and the

Several program flow control statements of St language in PLC

St language is one of the 5 standard languages stipulated in Iec61131-3, the PLC which is commonly used to see the brand supports this language (Schneider, AB can directly choose to create this type of program segment or function block, Siemens a little Trouble), one of the advantages of St language is good transplant, The St language of the family is basically similar, so if there is a giant good algorithm, with St language implementation is no bette

Electromechanical Drive control Seventh Week study Note--PLC

system program, checks the status of power, memory, I/O, and alert timers, and can diagnose grammatical errors in the user program. When the programmable logic controller is put into operation, first it receives the status and data of each input device in the field by scanning, and then stores the I/O image area Separately, then reads the user program from the user program memory, and then executes the result of the logic or arithmetic operation according to the instruction after the command is

Eighth Week PLC Programming exercises

1. Traffic light Control:requirements : In the scenario where the SW1 switch is turned on, the traffic light controller starts to work and the controller stops working when the SW1 is turned off.SW2 for control mode selector switch:When the SW2 is turned off, the green, yellow, and red lights turn on, the specific timing is: green light 100 seconds, flash 5 seconds (every second light off once), yellow light 5 seconds, red light on 100 seconds.When the SW2 is turned on, the intersection becomes

PLC Control Servo Motor

1. Explanation of the procedureA. Simple method:Drva D1000 D1100 Y0 Y4   Drva This is the absolute position Control command, D1000 is absolute position designation, D1100 is the pulse output frequency, Y0 pulse output address, Y4 is the direction output, it has two states on and off, if the D1000 is negative, Y4 is off, then if the load is a positive turn, If the D1000 is positive Y4 is on, the load is reversedTwo, detailed Http://wenku.baidu.com/link?url=2VuqALnRp90y_C8Hh44NGdFu7d0L5JPnZ6iUGx

Siemens PLC Learning note 11-(Loading and delivery instructions)

) format into the accumulator 1, or the specified counter's current count value in the BCD code (0~999) format into the accumulator 1. Instruction format: LCLC T3 //The current time and time base of Timer 3 is loaded into the accumulator 1 Low character LC C10 //The counter C10 count value is loaded into the accumulator 1 low word in BCD code format8.MOVE instructionThis instruction is a function box in the form of a transfer instruction, the ability to copy byte, Word or double-word data

Siemens PLC Learning note 18-(with parametric FC programming)

With parameter FC, when editing the function, define the formal parameter in the local variable declaration table, and use the virtual symbolic address in the function (FC) to complete the program writing.Here's a simple example of how to write a parameter FC function.This example completes the programming of a mathematical formula: Y = (X + 5) * 11/5;The procedure is as follows:The FC mathematical formula is written as follows (internally defined input parameter variables: x and output paramete

Siemens PLC Learning Note 16-(Structure of logical blocks)

duplex data type, or a parameter type that is specifically used for parameter passing, such as a timer, a counter, an address or a pointer to a block, and so on.3. How to use variables1) Use the variable name, preceded by the prefix "#", to distinguish it from the symbolic address in the symbol table. In incremental mode, the prefix is automatically generated.2) directly use the address of the local variable, which is only valid for the background data block and the L stack.In addition, when ca

Anti-interference capability of PLC

Why is PLC so reliable?This is not a simple question. You should answer clearly not one or two articles. Here, I have been a chief engineer of stiplc for many years.Exchange experience with friends:1. What content does reliability include?Reliability means that the product can accurately complete all the designed functions under the specified conditions. Electronic products generally include:(1) Mechanical Properties(2) Electrical Performance(3) Therm

Float examples and plc programming examples

Float examples and plc programming examplesFloat instance description Float is a powerful attribute. In the actual front-end development process, people often use it for layout. However, sometimes, it is difficult to use it. For example, now we want to implement a two-column layout, with the left column fixed in width, and the right column automatically expanded in width. See: Idea: Use div + float, div1 as the column on the left, div2 as the column

Twincat (Balford Beckhoff) Frequently asked Questions (FAQ)-How to get different PLC programs to run on separate threads TC2

In a task configuration, create a new task that can set the name and scan period?Right click on the Task,append program call and find the PRG written in the main application.?Run no problem, SUB1 collect the data of the Y variable of main once every second??For more instructional videos and downloads, please pay attention to the following information:My Youku Space:Http://i.youku.com/acetaohai123?My online forum:http://csrobot.gz01.bdysite.com/?Problem Exchange:qq:910358960Email:[email protected

Siemens PLC Learning note Five-(programming language, data type)

: Motor:structSpeed:intCurrent:realEnd_structC. StringString strings are a one-dimensional array of up to 254 characters (CHAR), with a maximum length of 256 bytes (the first 2 bytes are information that stores the length of the string). such as ' I ' M is string 'D. Date and timeThe date and time (Date_and_time) is used to store the year, month, day, hour, minute, second, millisecond, and week, accounting for 8 bytes, saved in BCD format. Week 1~7 represents Monday to Sundaysuch as: dt#2014-09-

PLC FBD Control software

the event action when the event occurs and disappears, through the event trigger condition, can open the picture, play the sound, execute the *.exe executable program and set the variable value, etc.2.5 Real-time databaseThe user specifies the data storage method, which can be stored in the database by timing, conditional expression and rate of change.2.6 Control StrategyWith FBD61499 graphical programming, users can complete advanced complex control with simple drag-and-drop and wiring. Input

Industrial plc, about the timer ton,tof, a little new cognition, or wake up!

The timers in the PLC are placed in a specific PRG task unit, and the PRG unit needs to be placed in a specific periodic cycle task in order to be executed, and this cycle cycle task cycle T; The timing time of the timer T0; T and T0 The order of magnitude, or size determines the accuracy of the timer.Ttest:ton;Uicount:uint;TTest (in: = Not ttest.q, PT: = t#2s);IF TTEST.Q ThenUicount: = uicount+10;End_ifSituation one: T0 > > t (Timer T0 (seconds) time

Total Pages: 15 1 .... 4 5 6 7 8 .... 15 Go to: Go

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.