Facebook's features took another big step yesterday and published Facebook graph, a feature that is stunning after open Graph, and what is Facebook Graph search (social graph searching)? What impact does SEO have to cause?
Let's take a look at what the Facebook Graph search
Figure is connected by vertices and edges, if the edge is no direction is the previous article in the non-directed graph, about the non-directed graph can refer to my previous article, if the edge is a direction, it is called a directed graph. From the vertex a→b, we can understand that a to B can be reached, the directed gra
Study and organize the Bipartite Graph
I learned about the bipartite graph today and summarized it as follows:
There are many problems with the bipartite graph, but the final result is to find the maximum number of matching.
Maximum matching of bipartite graphs and common graph creation methods
Point 1:
Minimum vertex
/*
1. A graph is a data structure composed of the vertex set and the relationship set between the vertex. Graph definition: g = (V, E)
2. vertices and edges: nodes in a graph are generally called vertices, and the links between vertices are called
3. Full graph: In an undirected
=====================================found that the previous picture of the study is very bad, nothing, now began to organize the graph theory of knowledgeThe author is a Konjac konjac, Orz, you gods.=====================================
Definition: The topological ordering of a directed acyclic graph (Directed acyclic graph, or DAG), in which all vertic
Shortest path
In solving the problem of network routing, it is very important to find the shortest path or the least weighted path of one vertex to another in the graph.
It is formally stated that given a weighted graph g= (v,e), the shortest path to vertex T in the vertex s to V is the least expensive path to connect s to T in the set S in the E-side.
When S is found, we solve the single-pair vertex shor
Reprinted from: http://www.cnblogs.com/skywang12345/p/3691463.htmlBasic concepts of Ⅰ graphs1. Definition of diagramDefinition: Graph (graph) is composed of some points (vertex) and the connection (edge) between these points, where the point is usually the "vertex (vertex)", and the connection between the point and point becomes "Edge or arc" (Edege). It is usually written as g= (V,e).2. Types of graphsDepe
Tree (free tree), unordered tree, and root treeFree Treeis a non-loop connected graph (no root is determined) (one of the vertices in the free tree is chosen as the root, then a normal tree).Starting at the root, for each vertex (usually called a node in the tree), the child is left-to-right in order, it becomes aordered Tree。In the application of graphs, we often need to find a sub-graph of a given
Data Flow Graph
A data flow chart is also called a data flow chart date flow digoal and DFD. It is a graphical tool that helps you understand and analyze system data flows, it accurately describes the functions, inputs, outputs, and data storage of the system logically, and is an important part of the system logic model.
Basic components of a data flow chart
Data Stream: It is composed of a set of fixed data, indicating the data flow. It is w
=Executors.newSingleThreadExecutor(); for (int i = 0; i The cachedthreadpool result is a disorderly sequence.public class ScheduledThreadPool{ public static void main(String[] args) { //延迟1秒后,每隔3秒输出当前时间,实现线程调度 ScheduledExecutorService executorService=Executors.newScheduledThreadPool(3); final SimpleDateFormat df = new SimpleDateFormat("yyyy-MM-dd HH:mm:ss"); executorService.scheduleAtFixedRate(new Runnable() { public void r
this expectation "because also to ensure that the matching points can still be matched"Then continue to try to matchUntil all points have been matched.Board:#include #include #include #include #include #define LL Long Long int#define Redge (U) for (int k = h[u],to; k; k = ed[k].nxt)#define REP (i,n) for (int i = 1; I #define BUG (s,n) for (int i = 1; I using namespaceStdConst intMAXN =405, MAXM =100005, INF =1000000000;inline intRead () {intout =0, flag =1;Charc = GetChar (); while(C -|| C > $
Problem Solving Ideas:The above requirements for the minimum point coverage, the minimum point coverage = = Maximum match, to note that the initial mode 0, no consumption, so mode 0 does not need to connect the edge.#include HDU 1150 Machine Schedule (binary graph matching)
Hungarian algorithm, very around, actually write a little bit of length.BOOL Find (int a) {int i,j;for (I=head[a];i;i=next[i]) {j=to[i];//Gets the adjacent point if (!unable[j]) {//If this point can be matched (reassigned once the previous match was reached) unable[j]=true;//Suppose this time cannot match if (!ub[j] | | | find (UB[J)) {//If you can match ub[j]=a;//set value unable[j]=false;//next time you can return true;//can}}} Return false;//cannot}int Hungary (int n) {int res=0;for (i=0;iThe
of each case represents how many units of time it began to rain, then n visitors, the next n rows is the location of each visitor (within the one-dimensional coordinate plane) and his movement speed, then the M-line represents the number of umbrellas, then M-line represents the position of each umbrella, asked before the rain The maximum number of people can get an umbrella (two people cannot share an umbrella). Resolution: In a given time the wife can reach the position of the umbrella to buil
In reviewing the Hungarian algorithm, it was found that this article introduced the Hungarian algorithm, very easy to understand, so the reference came.Complexity: adjacency matrix: O (v^3) adjacency table: O (v*e)Attached link: Interesting writing algorithm series--Hungarian algorithmHere's the code: intMAXN;//MAXN is the maximum number of vertices for x, y setsintXMATCH[MAXN];//Xmatch[i] Represents the matching of I in the X collection in the Y setintYMATCH[MAXN];//Ymatch[i] Represents the ma
speeds of all your guests, the positions of the umbrellas, and the time until it starts to rain, F IND out what many of your guests can at the most reach an umbrella. The want to share a umbrella, however. Guests do not.Inputthe input starts with a line containing a single integer, the number of the test cases.Each test case starts with a line containing the time t in minutes until it would start to rain (1 The absolute value of all coordinates was less than 10000.Outputfor Each test case, writ
I also smattering, only know can be proved, here also do not waste time. (Refer to "Introduction to Algorithms" for details)Finally, explain why there is a negative right side of the time can not:The connection matrix is as follows (picture can be drawn by itself):1 2 31 \ 2 12 2 \-43 1-4 \Then the first mark of the point is 3 and Dis[3] is recorded as 1, but in fact dis[3] should be 2, so there will be an error.Finally, attach a code that is not so standard:1#include 2#include 3 intm[ -][ -],e
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.