Elevator time limit: 1000 MS case time limit: 1000 MS memory limit: 64 MB
Total submission: 21 submission accepted: 13 description in the city's high-rise buildings, there is only one elevator, composed of n positive integers in a request list, the number in the list indicates the floor where the elevator will stop, the elev
Elevator Warehouse Address: click-me title:A 10-storey building (floor number 1-10) with an unlimited lift and an initial lift stop on the 1 floor. The lift moves 1 layers at a time of 1, while a layer stops at 1 (the time is initially 0). In order to keep the passengers waiting for the minimum amount of time (the elevator is at the stop time of the destination-passengers making the request ), you can write
ElevatorTime limit:2000/1000 MS (java/others) Memory limit:65536/32768 K (java/others)Total submission (s): 52791 Accepted Submission (s): 29174Problem DescriptionThe Highest building in We City have only one elevator. A request list is made to with N positive numbers. The numbers denote at which floors the elevator would stop, in specified order. It costs 6 seconds to move the
We often take the elevator in the company. Because of the high floor, it is a double-mounted elevator. But we often wait for the elevator for a long time, and some people often scold us for writing elevator scheduling.Algorithm. When I came back, I tried to write a simple one.
The scenario is very simple. There is on
During peak hours, intern Xiaofei was often impatient to stop on every floor of the elevator, so he came up with a way: Because the floor is not high, so during busy hours, every time the elevator goes up from the first floor, we only allow the elevator to stop on one of them. All passengers are taken from the elevator
Full Business process CoverageMsjeems is divided into: System Management, basic management, marketing management, planning management, technical management, production management, procurement management, warehouse management, installation management, maintenance management, quality control, financial management, report management, a total of 13 subsystems, the integration of the management functions of each subsystem, unified coordination, seamless integrated, constitute the whole system of busi
Label: style blog color AR for SP 2014 C on
Question: There is a building, and now we have designed an elevator scheduling algorithm: the elevator is on the first floor to let everyone go to the elevator, and then calculate the I of a Certain Floor Based on the floor selected by everyone, the elevator stops at layer I
Pair Programming-elevator Scheduling
12061181 Gao mengye
12061182 Hao Qian
1. Advantages and Disadvantages of Pair programming:
Advantage: You can give full play to the advantages of two people. Each person is good at different places, and the efficiency of cooperation between two people will be higher.
Disadvantage: if two people have a big difference in strength or have incorrect attitudes and cannot communicate well, the task will fail.
2. Advantag
Programming task: Elevator Scheduling
Peer staff: Zuo Shaohui-12061209, Yang haolan-12061202, Lu yurang
I. This soft job is really a daunting task. However, pairing programming gives me the confidence to complete the job and I have no active team members, later, we only applied to join the already-established team. Therefore, we are actually a three-person group. We all said that the team has a lot of power, and the idea will be much more open, and th
http://acm.hdu.edu.cn/showproblem.php?pid=1008ElevatorTime limit:2000/1000 MS (java/others) Memory limit:65536/32768 K (java/others)Total submission (s): 52650 Accepted Submission (s): 29078Problem DescriptionThe Highest building in We City have only one elevator. A request list is made to with N positive numbers. The numbers denote at which floors the elevator would stop, in specified order. It costs 6 se
Today, there is an electronic design contest to ask me the elevator running logic C code implementation, I think of learning data structure that will be written in C + +, but for a long time now also remember not clear, directly to the source code to him, let him see.Think of yourself immediately to start a long and arduous number of model national training, the mood is not good ah.The results of this sequencing run are as follows: ( to the source cod
Title Requirements:Shijiazhuang Railway University Foundation building a total of four elevators, each floor are people up and down, elevators in each floor stop. Zhang Yidong of class 1201-1 felt impatient at the stop on each floor.Because the floor is not too high, at the peak of the Class Period, the elevator from the first floor, but only allowed to stop on a certain floor. On the first floor, each passenger chooses his or her destination, and the
More floors of the shopping malls will generally have vertical up and down the elevator to facilitate customers directly to the designated floors, thereby accelerating consumption. If you observe carefully, you will find that these elevators, always put a large volume of red non-slip mat, these anti-skid pads fruited "Friday" such words! Of course, the day you go to the foot of the mat will be engraved on the day of the week, as if it is a latent rule
Members: Liuzhongrui, DouxiaosonA: Preface1. Background: Stone Iron big Elevator Dispatch. According to domestic and international statistics, passengers in the elevator in the car for more than 1 minutes, that is, causing discomfort. Therefore, the manufacturers continue to develop high-speed elevators and scheduling technology. The purpose of this paper is to discuss the transportation of
Question information:
1008. Elevator (20) Time Limit 400 MS
The memory limit is 32000 kb.
Code length limit: 16000 B
Criterion author Chen, Yue
The highest building in our city has only one elevator. A request list is made up with n positive numbers. the numbers denote at which floors the elevator will stop, in specified order. it costs 6 seconds to move the
// Which floor does the elevator stop on? Can the minimum number of floors of all passengers who climb the stairs of the elevator be reached? Public class test_005 {// person [I] indicates the number of people to reach the I-level. person [0], person [1] is blank by default, that is, no one goes to layer 1 static int [] person = {0, 0, 5, 7, 8, 9, 6, 6, 1, 4, 4, 8, 5, 2, 4, 5, 8, 6, 3, 3, 5, 9, 9, 6, 6, 9,
0x00 OverviewBased on the structure of bus algorithm, this algorithm increases the judgment of docking in the middle floor and the search of a stop at the top and bottom.1. If the elevator is at the top level, traverse all requests in the request queue, logging in the direction of the operation: most recent same-direction external request, nearest same-direction internal request, furthest counter-directional external request;When scheduling, increase
Elevator
Time Limit: 1000 ms memory limit: 32768 k any questions? Click Here ^_^
The highest building in our city has only one elevator. A request list is made up with n positive numbers. the numbers denote at which floors the elevator will stop, in specified order. it costs 6 seconds to move the elevator up one fl
Describe the vertical tunnel in which the adventure team enters the elevator after the power of the elevator is enabled, A track that passes through the top of the tower, an elevator stops at the bottom of the track, and a huge handle in the elevator that controls the lift.
The tower of Nescafe has a total of N layers,
Investigation report on elevator dispatching in Shijiazhuang Railway UniversityResearch person: Liu Di boResearch date: 2015.4.2Research location: Basic teaching building of Shijiazhuang Railway UniversityResearch object: Basic teaching Building Elevator1. BackgroundImagine, Shijiazhuang Railway University basic teaching building of the elevator configuration is as follows: the building has 1/storey, 4 elev
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.