The predecessor of the cmme model is SW-CMM and SE-CMM, the former is what we refer to CMM. The main difference between cmme and SW-CMM is that it covers many fields; so far it includes four areas:
1Software Engineering (SW-CMM)
Software
From: DIY tribe 2010-03-14
Sei organizes a cmme seminar every year. Most cmme chief evaluators take advantage of this opportunity to learn about the latest sei trends and to socialize with people in the circle. Most of the work of the Chief evaluators is relatively independent. The SEPG conference and the annual cmme seminar have become a rare opportunity for mutual communication and friendship. At the meeting, an American chief evaluator chatted with me about an interesting s
Let's take a look at the differences between CMMs and CMM. The main difference between cmme and SW-CMM is in three aspects: professional field, maturity level, process domain, model structure. Compared with CMM, cmme covers four specialized fields: Software Engineering (SW), System Engineering (SE), integrated product and process development (ippd), and procurement (supplier sourcing ). The origins and origins of IPD and cmme determine the great diffe
When a new object is created, all inherited constructors are inherited
This means that each parent class has a constructor (because each class has at least one constructor), and each constructor executes when the object is created.
Executing The new instruction is a big event because he will start a chain reaction to the constructor. Also, even abstract classes have constructors. Although you cannot perform a new operation on an abstract function, the abstract function is also the p
Misunderstanding 1: CMMS is cumbersome
In fact, cmme also advocates conciseness and efficiency. Min years agoThe various methodologies of jade began to resonate in the market and place them in a brand new development method opposed to cmme. At the same time, Mark, a senior scientist at Carnegie Mellon University, a pioneer in Process ImprovementIn his paper published in the IEEE journal, Dr. paulk pointed out that the idea of agile development is in
and management based on the characteristics of small software enterprises, while maintaining the essence and structure of CMMs. Because the specific Improvement Directions of each software enterprise are different, the improvement strategies adopted are different, and the models used are different (continuous or segmented). This article does not explain how to crop KPA one by one, this is not easy to grasp the subject, and it is easy to fall into det
remaining options. Continue until a match is found, or all possible permutation and combinations of quantifiers and branching options fail, and then move to the next character at the beginning of the process, repeat this process.
For example, the following code demonstrates how this process processes branches through backtracking.
/h(ello|appy) hippo/.test("hello there, happy hippo");
The above regular exp
This article is the official HTML5 training course for h5edu institutions, mainly introduces: JavaScript intensive Tutorial--Regular expression backtrackingThe following example shows the process of processing a regular expression:/h (ello|appy) hippo/.test ("Hello there,happy hippo");This regular expression "Hello Hippo" or "Happy
Sei organizes a cmme seminar every year. Most cmme chief evaluators use this opportunity to learn about sei.As a place to socialize with people in the circle. The work of the chief evaluators is mostly independent. The SEPG conference and the annual cmme seminar have become a rare opportunity for everyone to communicate and enhance each other.Friendship. At the meeting, an American chief evaluator chatted with me about an interesting story. He saw this article on a software engineering blog site
mainly completed by the internal project team.
Based on some of our actual situations, in terms of CMM tailoring, we can expand vertically to the level 4 of the level 2 of the CMMS Level 3, while retaining most of the KPA of the level 2 of the CMMS Level 2, on this basis, we will add the KPA for Level 3 inter-group coordination, integration of software management, training syllabus, and Level 4 software qu
generally refers to a small-scale single practice, such as a demand tracking matrix, use cases, sequence diagrams, user stories, every Hitachi meeting, and automated testing. Practices vary in size. Some practices are a set of sub-practices, such as continuous integration.Process
A set of practices that can solve certain problems in certain fields.
Note: The following models and methodologies are not exactly the same as processes, but the process aspects are extracted here.Cmme
The content list
Apache Tomcat, liferay enterprise portal, Apache struts, Hibernate Orm, velocity template language, and Lucene search engine. Dotcms is developed using Eclipse IDE and uses velocity + Struts as the front end to make dotcms easy to expand and build. Dotcms license: The dotmarketing Public License.
Home: http://www.dotcms.org/projects/dotcms/
14. openedit
Penedit includes three modules: Web content management, e-commerce, and blog. Web content management includes online editing, dynam
This tutorial learns how to create a new species-the river lizard-by combining lizards with the 2 of hippos, see the effect chart first
First open the Lizard picture
Hippo Material
Use the pen to pull out the big mouth hippo, drag into the Lizard document, the position below, you can reduce the hippo layer opacity to place.
The four or five levels of high maturity level of CMMs emphasize data and quantitative project management, provided that the process itself is stable and the Organization has a mature and easy-to-use software development process management support platform, routine task feedback, changes, and defect records should be integrated into daily work. Data collection should be automated as much as possible, and data collection cannot interrupt developers' wo
The four or five levels of high maturity level of CMMs emphasize data and quantitative project management, provided that the process itself is stable and the Organization has a mature and easy-to-use software development process management support platform, routine task feedback, changes, and defect records should be integrated into daily work. Data collection should be automated as much as possible, and data collection cannot interrupt developers' wo
. Establish a change management environment.5. Use cyclic engineering tools to make changes more free.6. Use strict model-based design symbols.7. Provide objective quality control measures for the process.8. Demo-based evaluation using intermediate products.9. Release a detailed and expanded plan.10. Create an upgradeable and configurable process.
As shown in table 1, the key process fields of CMM directly inspire most traditional principles, but they have almost no influence on modern pri
Q: Q A about Agile Software Development
Q: How can agile development be integrated into the cmme currently being implemented?
A: First of all, I would like to explain why CMMS is proposed based on CMM. Barry Boehm elaborated on this in his new book balancing agility and discipline: A Guide for the perplexed. In general, there are two main reasons: 1. Significant changes have been made to the components in CMM that may easily lead to bureaucracy; 2.
Comparison between CMMs and agile development modes: April 9, 2012 by flysky
I have participated in the development of two versions of a new product project. I have adopted the agile approach of cmme and project. I will summarize the two models.
CMMS uses the traditional waterfall model for development.The development process is project initiation-> Requirement Analysis-> outline design-> detailed design
write super () also can, the compiler will automatically addPublic class Hippo extends animal{Public Hippo () {Super ()}Public Hippo (String name) {Super (name)}}This ()This refers to the object itself, which can only be used in the constructor and placed on the first line , so this () and super () can only select oneUse this () to call another constructor in th
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.