InfoPath and SharePoint (5) Release InfoPath forms to Content Type, using pointinfopath
Whether you customize the form in the List or publish the form to the Library, there is a defect that it cannot be reused by other lists/libraries.
Therefore, SharePoint provides a function to publish a form to Content Type, so that other lists/libraries can reference it.
Open a previously designed form:
Select
This chapter introduces the file format of INFOPATH. The examples used in the previous sections generate an xsn file after the release of both the client version and the WEB version. This file extension is the extension of the INFOPATH file, but we can open it like other software. Let's take a look at what is there.
First, change the extension name to. Zip. Use any decompression tool to decompress the pack
I think it is most convenient to use web services to interact with infopath. infopath can only extract data from databases (SQL Server and access), rather than directly edit data. Through the web service, infopath submits XML data for further data processing. Infopath pages can also be beautiful, which is equivalent to
field to false
showdefaulttaskregion
Boolean
set whether to display the default task editing panel. In the previous article, we saw the default task Panel. This is non-infopath content. If you want to design the task panel in infopath, set this field to false
currentstep
string
obtains the current workflow step. If taskstep is set for an activit
Recently developed a small attendance system, InfoPath forms are almost finished, so get a colleague there is going to test, on the colleague's machine open InfoPath XML file when a mistake, said found no form template, depressed! In retrospect, I used to deploy on a network path, but I chose a local path, so when these XML files are opened on other machines, InfoPath
can be opened in a browser or InfoPath" for compatibility. Select "full trust" for the security level ".
6. Save the template.
7. Create an information initialization list "WFMetaData". The value of "PurcharIDFormat0" in the "Confirm application number rules" column is "P-, yyyyMMddHHmmA ". Use this rule to create a scheduler ticket number.
8. Insert ----- à Loading event: first create a data source and r
(true) is used to copy a copy of The sonnode node, and the child node is also copied. The premise of using appendchild is that the parent node of the added node is a duplicate node.
Note with the count () functionCount (/My: Wenzhou Torch/My: Template structure/My: Elevator type parameter [My: Production No. =/My: Wenzhou Torch/My: the production ID is used to generate the serial number]/My: Part group [My: Part type =/My: Wenzhou Torch/My: Part type is used to generate the serial number]/My:
Convention: Review the previously created form:
Today, we will continue to explore INFOPATN to see how its form data is submitted. Like all other software or development languages, to submit a form, you need to trigger the submission action. First, add a button to the form. In the upper control toolbar, select the button control.
Double-click the button inserted into the form to open the properties Toolbar of the button, change the problem displayed on the button to "Submit", and select "S
How can I check whether the infopath form is successfully published?: Open the SharePoint 3.0 management center and go to the applicationProgramManagement includes the infopath form Services Section. Go to "manage form template" to view all your published forms. In the Status column, if it is ready, it indicates that the form is ready for use. If it is installing, that is, it is possible that the form templ
InfopathIt is a data input tool based on XML technology. It consists of three parts: schema, XSLT, and XML). Its data is stored in XML format. However, the development interface provided by it encapsulates XML processing, instead of using xmldocument, it provides a setXdocument object.
In actual application scenarios, we generally use infopath as the client to input data and interact with the server.Infopath must pass data to the server after receiv
From: Microsoft
Operation Method: Create a COM add-on to add the custom function to infopath.
Microsoft Office infopath 2007 supports COM add-ons used to extend the form editing user experience. Although this is a new feature of office infopath 2007, other office applicationsProgram(Such as Microsoft Office Word and Mi
This example designs a form of employee information, including name, gender, birth date, ID card number, department, mobile phone number, and email. Three verification rules are added. The ID card must comply with the required digits and rules, the mobile phone number must be 11 digits, and the emai must comply with the email address rules.
Step 1: Enable
ArticleDirectory
Comments
Turn: http://blogs.msdn.com/infopath/archive/2005/04/15/creating-an-infopath-custom-control-using-c-and-net.aspx
In Office 2003 Service Pack 1 (SP1), new features and Infopathcontrol And Infopathcontrolsite Objects were added to infopath to support the development of custom controls implemented using Microsoft ActiveX te
At work, I often encounter questions related to InfoPath from customers and colleagues. blog readers often send emails, indicating that there are too few tutorials related to InfoPath. To be honest, I have never read the learning materials of InfoPath, And I have accumulated my understanding and experience. Recently, I have summarized some of my experiences and s
The knowledge points and content involved in infopath forms when working together with workflows are a little complicated. Naturally, various errors are generated, and I often feel inexplicable about these errors, as a matter of fact, we did it step by step according to the reference materials. Why am I wrong? In this situation, I am as confused and helpless as everyone else. I even try my best to capture my head, and my mind is like a cat. But then w
for search, and the ID, file name, and workflow status exist as the whole form data.
The data source in infopath has two types of domains:
Field (element ):When a field of this type is released and upgraded to a field, the data in the list library cannot be edited and expressed in infopath, because the Application Form (fields in the hotel reservation Application Information Section) is filled in upon
Recently, a friend said via MSN: "Ocean hasn't written anything recently ?". Think about what to write. From the actual project experience, there are indeed many things that can be written, at least a booklet can be written, but there is always no calm to write. The last time I went to Beijing, I was deeply touched by kb and ting mm. It was time to write something. I remember seeing bin in the bathroom, bin said with a smile, "how ocean is here", but he has found angry elements in his eyes, so t
After designing an infopath template, You need to publish it to a public place (such as a public network). You can download the template content and generate an XML data file in a fixed format. A complex infopath template can contain a primary data source (schema file) or multiple secondary data sources, and may also include files generated by vsta (Visual Studio Tools for application ).Code. The source fil
From: http://blogs.msdn.com/infopath/archive/2004/04/09/110504.aspxExtending the infopath control set with custom controls
Infopath provides a rich and complete set of generic built-in controls in both 1.0 and SP-1, but there are some cases where there is a need for a control that is specific to your form or to your organization.The
In Moss 2007, infopath 2007 and workflow foundation can be used to efficiently create very powerful workflow applications. This is because the content in the SDK is not smooth and it is difficult to read. So I want to share with you my little experience and hope to avoid detours, and then combine the SDK, ECM starter kits and WSS workflow starterkits to quickly master this great feature.
1. I want to create a workflow project for moss.
Download WSS wo
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.