lines is a description of the route, including three integers, which in turn represent the two port number of the route connection and the route length (>0). Pier A is numbered 1 and Pier B is M. The transportation cost per unit length is 1. The route is bidirectional. The next line is an integer d, followed by a line of D that is three integers P (1output Format:Includes an integer representing the minimum total cost. Total cost =n days the sum of t
SharePoint Code-free workflow design and development example--transportation reimbursement Process (iii)Category: SharePoint2012-07-21 01:28 8512 People read Comments (7) favorite reports SharePoint Work Traffic Task development tool 4, SharePoint Designer no code workflow designDevelopment tools for SharePoint Designer 2010Create a new list workflow, and bind the transport expense claim form librarySet workflow startup Options "Automatically star
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 29682
Accepted: 7919
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all streets can carry the weight.Fortunate
Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 24398
Accepted: 6472
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all
Original title Link: http://poj.org/problem?id=1797Heavy Transportation
Time Limit: 3000MS
Memory Limit: 30000K
Total Submissions: 24576
Accepted: 6510
DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L
Gold Transportation
Time Limit: 2000MS
Memory Limit: 65536K
Total Submissions: 2995
Accepted: 1065
DescriptionRecently, a number of gold mines has been discovered in zorroming state. To protect this treasure, we must transport this gold to the storehouses as quickly as possible. Suppose the zorroming state consists of N towns and there is M bidirectional roads among these towns. The gold
2000-ton number is special, which is exactly twice the transportation volume of trains and is just a complete number. The problem is: how far can 2000 tons of coal be consumed by 1000 tons at most? We know that 2000 tons of coal need to be set off twice by train, plus the return time in the middle, three times in total (no return is required after the last departure), that is, how far the 1000-ton coal train can run three times, 1000/3 meters.
Lik
. If the freight car cannot reach the destination, output-1.Example 1 input 1
??4 3 1 2 4 2 3 3 3 1 1 31 3 1 4 1 3
Sample output 1
3-13
Restrictions
1 s for each test point.Prompt
For 30% of data, 0 For 60% of data, 0 For 100% of data, 0 Source
Noip 2013 raise group Day 1
First, based on the nature of the maximum spanning tree, it can ensure that the transportation of goods on the maximum spanning tree is better than that on other sides.
Then t
Label: poj1797
Heavy Transportation
Time limit:3000 Ms
Memory limit:30000 K
Total submissions:21037
Accepted:5569
DescriptionBackground
Hugo heavy is happy. after the breakdown of the cargolifter project he can now expand business. but he needs a clever man who tells him whether there really is a way from the place his customer has build his giant steel crane to the place where it is needed on which all streets c
Oracle Tablespace Transportation premise: the user must have SYSDBA system permissions for Tablespace transmission. The moved Tablespace is a self-contained Tablespace and should not depend on the existence of objects of external Tablespace objects. Determine whether to include the data. You can use the TRANSPORT_SET_CHECK process in the system package DBMS_TTS to check whether the data is transmitted to the table space OLTP. For example, you can use
contains the number of scenarios (city plans). For each city the number N of the street crossings (1 OutputThe output for every scenario begins with a line containing "scenario #i:", where I am the number of the scenario starting at 1. Then print a, containing the maximum allowed weight that Hugo can transport to the customer. Terminate the output for the scenario with a blank line.Sample Input13 31 2 31 3 42 3 5Sample OutputScenario #1:4 Each road has a limited weightThe maximum number of good
http://poj.org/problem?id=1797DescriptionBackgroundHugo Heavy is happy. After the breakdown of the Cargolifter project he can now expand business. But he needs a clever mans tells him whether there really is a-a-a-from-the-place his customer have build his giant stee L Crane to the place where it's needed on which all streets can carry the weight.Fortunately he already have a plan of the city with all streets and bridges and all the allowed weights. Unfortunately he have no idea how to find the
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.