Merge ERRORS.VI Features: 1, in order to search the wrong input, and the error in the array input error, output the first error.2, if there is no error, that is, the error status is False (tick), in order to search the first warning, that is, to return the first code nonzero warning. 3, if there is no error, there is no warning, output error input 1.LabVIEW Series-The use of merge error (VI)
To stop a parallel loop in LabVIEWQuestion: How do I stop two parallel loops in LabVIEW? I use a local variable, but when I stop the program execution, the second time I can'tRun the program. How do I solve this problem?Answer:You use a local variable to stop the execution of 2 while loops in parallel to be correct. However, to remember that your local variable is a Boolean entity, you cannot use the Latch mechanical action (latch mechanical action).
Thread 3 in LabVIEW Program-thread priority 3. thread priority
In the VI property settings Panel VI properties-> execution, there is also a drop-down control used to set the thread priority (priority ). This option can change the priority of the VI running thread.
There are six priority settings, the first five of which are the five priorities from low to high. The higher the priority, the easier it is to seize CPU resources. For example, if you set t
LabVIEW operation tips
Link part:1. If you want to cancel the connection, Press ESC, right-click, or click the source control.
2. If you want to locate the link, click it at the corresponding position. Double-click the link to confirm the link. If you want to cancel the link, right-click it.
3. For two input parameter functions (such as calculation and comparison), you can press and hold the ctrl key and move the mouse over the input port.
The ico
Format Time Date stringThe function function is to specify the format using the time format code and to display the value or values of the time identity in that format.Note: The insertion character is preceded by a%
Insert character
Display format
Insert character
Display format
%a
Abbreviation of the week name
%b
Month name abbreviation
%c
Region Time/Date
D
Date
H
24-hour syste
can automatically organize the data within the loop into an array.Incoming outgoing data through a shift register, and the type and value of the data are not changed. The special point of a shift register is that the same memory is forced on the terminals at both ends of the loop structure. Therefore, the last iteration of the execution of a given value, to the right side of the shift register to the terminal, if the next iteration of the operation needs to use this data, from the left side of
Waits for an event to occur and executes the corresponding conditional branch to handle the event. Event StructureIncludes one or more sub-program block diagrams or event branches, when the structure processing time, only one subroutine block diagram or branch is executed. When you wait for an event notification, the structure can time out.The "timeout" terminal in the upper-left corner of the line border, specifying the time, in milliseconds, to wait for the event to occur. The default value is
Label:Namespace Add the followingusing System; using System.Collections.Generic; using System.Linq; using System.Text; using ADOX;using System.Data;Create an Access databaseFirst add the ADOX COM componentAdd the process as follows; Click Add Reference to select the component in the COM component bar.Use Microsoft ADO ext.2.8 to click OK.C # code is implemented as followsnamespacedatabase{ Public classAccessdatabase { Public voidDatabase () {} Public voidCreatdb (stringpath) {ADOX. Catalog Catal
Because 99% of the new shares are higher than the purchase price, the purchase of new shares does not require any transaction costs. If the strategy is proper, the annual income can exceed 10%. Therefore, creating new shares is almost no risky financial investment. How can we purchase new shares?
New Stock purchase
Error: unable to collect goods because the purchase application is not approved and the purchase order is not completed
Problem: an error is reported when the purchase order is copied from the purchase application to create a category: the purchase application is not appro
The overall requirements of the purchase order module:The hospital in the procurement of drugs, the first to create a purchase order, the purchase order content including the procurement of pharmaceutical information (purchase volume, purchase amount), the
Problem: an error is reported when the purchase order is copied from the purchase application to create a category: the purchase application is not approved.
Solution: Google searches for possible content about the approved purchase order.
Find two important information:
List of common mm transaction codes (T code)Mm0
Demand:Before we put the purchase order to the supervision unit audit, the approval of the purchase order will be accepted. The supplier decides not to issue the purchase order.As follows:In this list is the Purchase Order Detail table, the data found here is only specific to the supplier's
About In-app PurchaseIn-app Purchase allows you to embed a store inside your App using the store Kit framework. This framework connects to the app Store in your app ' s behalf to securely process payments from users, prompting them to a Uthorize payment. The framework then notifies your app, which provides the purchased items to users. Use In-app Purchase to collect payment for additional features and conte
We have reviewed the purchase order before, this article is to submit after the audit.is to change (update) The audit status of the purchase order.Demand:The user must first view the contents of the purchase order.View Purchase Order page: page layout with Purchase order mod
In Oracle EBS form, the function of converting a purchase order into a purchase order is provided. Let me familiarize myself with the entire process:
1. EnterPurchase order
2. EnterAllocate
3. approval. This step is essential. If the purchase order is not approved, it cannot be converted into a purchase
In the previous article we knew about the procurement requirements. In this article we need to look at how the database of the purchase order module is built.We design with two tables:1: Purchase order basic Information Form (YYCGD):That is, on the corresponding page:Of course, when we design the database, it's impossible to have only these fields. Let's look at how the real database is designed:Let's take
P1108 low price purchase, p1108 low price purchase
DescriptionThe "buy at a low price" recommendation is half the rule of success in the dairy market. To be considered a great investor, you must follow the following questions and suggestions: "low price purchase; low price purchase again ". Every time you buy a stock,
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.