Software Architecture activities and Suggestions
Version 1.0:
This article is a learning note for the book "software architecture practice.
I,
Architecture-related activities
According to the approximate time sequence, the architecture activities include the following processes:
Ø
Create a business case: the architect needs to participate in the activi
SCMFive basic activities
Chen nengtech
2007-10-17
From: Software Configuration Management in Agile Methods-Juha koskela
SCMOf 5Basic activities
According to the definition of IEEE Std. 828-1990, SCM includes five tasks: planning, recognition, control, status record, and auditing. As shown in:
Configuration Recognitio
To transfer objects between different activities in Android, we can consider using bundle. putserializable (Key, object); you can also consider using bundle. putparcelable (Key, object); the object in the previous method must implement the serializable interface, and the object in the next method must implement the parcelable interface. The following is a complete example.
1. Create an android project. The directory structure of the project is as foll
In Android projects, some global static variables are sometimes required to save some data. In this way, other pages can call the data after the value assignment interface is disabled.
But we know that global static variables in Java (Java does not have the concept of global variables, but Java provides the public static keyword to implement some keywords similar to global variables) they are all stored in the memory when the program is loaded. They are stored in the method area. If the program
There are 12 main configuration management activities:
I. Configuration Management Plan
Ii. Configuration ID
3. Determine the configuration management scope
Iv. Confirm and record configuration item attributes
5. Define identifiers for configuration items
6. Determine the configuration baseline
VII. Determine the Configuration Structure
8. Confirm configuration item naming rules
9. configuration item Control
10. configuration status report
11. Configu
to Android.Advantage: it is first learned, difficult to understand, and there is no consideration for resource release.Disadvantage: values can only be transferred between two activities. If values are transferred between multiple activities, you need to save the variables for multiple transfers. The complexity of the Code increases and it is not easy to maintain.Now, I hope that my friends can improve and
You can use the method of clearing the history stack to cleverly close all the activities. First, use activity A, which is set as invisible, to start the program. Activity A serves only to pad the bottom of the stack, this activity is only used to start and exit the program. When you exit, you only need to jump to activity A and let a finish to close all the activities.
Intent intent = new intent ();
In
Vifir.com open-source campus activities were successfully held 7 o'clock in the new campus of the University of electronic science and technology on the evening of March 13, September 26. This activity is also about to enter other campuses. Please pay attention to and participate in the open-source technology activities of Chengdu universities.
Vifir.com open-source campus
Don't want to write a derogatory word in the title,
If any friends are willing to participate in this kind of public welfare activities, can add me, I will recommend the event leader to you
Today to see a public welfare activities in Putuo District, mainly to accompany children with disabilities chat, Park walkNext to my feeling, the first time I saw a child who was not quite the same as our normal
Practical activities: Old Boys education operation and maintenance class studentsPractice location: An IDC room in Changping, ChinaPractical activities Objective: to understand the IDC room in and out of the process, visit IDC Computer room equipment, practical installation of a number of real server system, for the graduation enterprise work well pave the table.This IDC room practice is also my first time
Opening
In the previous article, we mainly talked about WorkFlow Design step.6-invokemethod call object or type method-wf4.0 and how to use invokemethod to design and develop a workflow.
The extended content mainly describes how to use collection in a workflow.
Summary
In this article, we are the first extension article. This article mainly describes the usage of collection. Generally, we operate collections in the following ways: add, delete, and query, therefore, WF provid
Activitycollector class as an activity manager3 */4 Packagecom.example.activitytest;5 6 Importandroid.app.Activity;7 8 Importjava.util.ArrayList;9 Importjava.util.List;Ten One /** A * Created by admin on 2017/1/22. - */ - the Public classActivitycollector { - /* - staging an activity with a list - */ + Public StaticlistNewArraylist(); - //provides a addactivity () method to remove an activity from the list. + Public Static voidaddactivity (activity activity) { A Act
[Android] switching between activities, passing data, androidactivity
I wrote a similar tool based on the image cropping function of the android system. The function is basically implemented, but there is a call question: how can I call this cropping tool from my program and get the cropped image?
In fact, this is also very simple, that is, the basic usage of intent.
Original address please keep http://www.cnblogs.com/rossoneri/p/3998755.html
First, g
September 09, 2017, in the heat of the summer, we in (Shanghai Xuhui) Hongqiao Road 3rd, 2 block, 10 floor organized a Microsoft Azure Aspnetcore micro-service activities.As a result of busy work, after the completion of activities, failed to timely release relevant information, deliberately in the coming of the Spring Festival, to add up.There are activities in the back, we talk about the first time after
Unknowingly found that they have written on the farm related articles can start a separate topic, and there are several topic did not have time to write, this estimate can also explain from a side of the current farm boom. Following the topic of this "alternative online payment method: Seeing how foreign happy farms make money", the recent two examples of social game developer, which use farm apps for brand-placement marketing, are a new attempt to make money.
For brand advertisers, the use of
Four days ago, the UbuntuEdge fundraising project launched a prize-winning promotion activity, which is now completed in three days. Whether you have donated $20 or $2000, you can participate in this activity. Participating in this activity will have the opportunity to win enough money to buy the UbuntuEdge service with enough text lettering for your UbuntuEdge mobile phone. The activities are as follows: 1. You must first register and log on to the I
new activity is created, and another activity is retrieved from the stack structure. When you call the back button, you need to delete useless activity from the stack, finally, define a method to clear the activity when the system exits, and call the finish method of each activity to release the memory resources.(2) To share complex data types, we can rewrite the application class to define a member in this class-activity management class activitymanager, in this way, it can be shared by all th
It seems that I haven't heard the # cmdn club # sound for a long time. In the past four months, I have investigated three technical conferences in the United States and visited two non-csdn technical conferences in China, we held an iOS devcamp and Android devcamp event and, as always, focused on offline activities on topics such as mobile Internet, mobile entrepreneurship, and app sharing held by many colleagues in the industry.
Beijing, Shanghai, an
Today, when the system proposed this function, I thought it was very simple, but at last let me get it for one night. The final solution is as follows:
1. Exit all activities opened by the system. For details, refer to this blog. At this point, the problem occurs. When you exit, not all the activities exit, and the system will return to a specific activity. My solution is to overwrite Map
Import Java. util
I. faulthandler
The following figure shows how to add a workflow:
First, add a seruence, add three codes in it, add a code outside, enable seruence error handling, add a faulthandler in the container, and add a code activity in faulthandler.
Set the faultType attribute of faulthandler as follows:
Be sure to bind the property.
Running effect:
Note that if faulthandler captures errors, other code activities in seruence will not be e
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.