In fact, the retrospective is very simple is the violence + judgment conditions, the conditions of the establishment of continued violence, conditions are not set to return to the next violence, the difficulty is to find the conditions for the establishment,In my opinion, backtracking is the pruning of violence, to find out the condition of the establishment of the basic solution ...Ideas:This question should find out the current bus order and the number of people can get on the train,, I used n
= edges[p[u]]. from; the } the } the returnCost ; - } the the intMain () the {94 while(SCANF ("%d%d%d", n, m, k) = =3) the { theInit (n +1); the 98s =0, t =N; AboutAddedge (s),1K0); - 101 while(m--)102 {103 intu, V, a, C;104scanf"%d%d%d%d", u, v, a, C); the for(inti =0; i )106Addedge (U, V,1, A * (I *2+1));107 }108 109 intCost =mincost (); the if(MAXF "-1");111 Elseprintf"%d\n", cost); the }1
equipment; third to N+2 line: 3 number per line Ti Vi GI indicates the firepower value, volume and weight of the equipment;
outputs description output DescriptionOutputs a number that represents the maximum firepower value that may be obtained
sample input to sample6 5410 2 220 3 240 4 330 3 3
sample output Sample outputs50
Data RangeFor 50% of data, v,g,n≤100For 100% of data, v,g,n≤1000
SolvingTwo-dimensional cost knapsack problem, the subject to meet the 01 backpack model, just the
empty, "section" Control hides(2) Custom "Submit" and "Close" buttonsInsert a two button control, such asAdd a rule for the submit button as follows "Disable submit after commit" rule"Error message Prompt" rules, such as"Error message emptying" rule, such as"Submit Form" rules, such asAbout the settings for the data connection "master commit", such asFile name format is (author _ date _ Time)Test User _20120720_003011Concat (String (Iuser), "_", translate (translate (substring (now (), ":", "")
GIS outsourcing of zhongke yanyuan --- transportation integrated Geographic Information Platform, yanyuan gisA gis portal that integrates maps, services, and transport. It is a GIS portal that integrates maps, services, and transport, without complex settings and deployment, you can quickly create interactive maps and applications and share them with other people in the company. To improve work efficiency. Platform:
Flexible data management and shar
Add the code to world. save.
[OBJECT]GUID = 0211B2BTYPE = 5ENTRY = 176495.MODEL = 3031XYZ = 2056.709473 237.530640 99.766960 4.839873GTYPE = 15GFLAGS = 40
This Zeppelin is grom' Gol
Related transportation tools and items
. Addgo 4170-orc platform elevator down. Addgo 4171-orc platform lift up. Addgo 20649-undervator). Addgo 20650-open/close the door of the undead underground city
. Addgo from 176080 to 176085 is the subway
. Addgo 164871The airships
Tags: bzoj short circuit dynamic plan zjoi2006 spfa
Some docks are composed of several edges. In some cases, some docks need to be repaired and cannot be used during this period. If you change the route, you will have to spend a certain amount of time to find the minimum cost within the specified number of days.
Idea: Use spfa for short circuit. The key is dynamic planning. I thought about this rule for a long time and finally found myself thinking complicated. I first thought about how to use
DescriptionA has n cities in China, ranging from 1 to n. There are m two-way roads between cities. Each road imposes weight limitations on vehicles. Now there are Q trucks carrying goods. drivers want to know that each truck can carry a maximum of multiple goods without exceeding the vehicle weight limit.
Input FormatThe first line has two integers n, m separated by a space, indicating N cities and M roads in.Next, line M contains three integers x, y, and z in each row. Each integer is separated
Information StoreUsing adjacency table to store city information and line information is more efficient than adjacency matrix.Main data structuresI) time, the input and output format of the canonical timesII) Vnode, head node, for creating vertex tables, storing city informationIII) Arcnode, table nodes, used to create edge tables, store arc-pointing city information, and line informationIV) InfoType, storage line informationV) Priority queue, precedence queues, for optimizing the insertion node
Topic Link: [POJ 1797]heavy TRANSPORTATION[SPFA]
The analysis:
For all paths from point 1 to N, the maximum size of the smallest capacity on the path.
Ideas for solving problems:
will be the shortest way of thinking change on the line. The Dis[i] Array records the smallest road capacity on the road from point 1 to I. Note Initialization of the DIS array.
Personal experience:
It was written because it was stuck in the initialization and tried several t
the
Given an M-without-direction graph, you need to plan N-day transportation solutions. N days, every day from the S walk to T walk once, each point in some days can not pass. The cost is equal to the length of the path each day, and if the path chosen by the first day is different from the I-1 Day (i>1), it will take more than K to change the route price. Ask for the minimum total cost.(N Solving
Brain hole problem, not too difficult. May at first
It's just a second answer, and then consider how to validate.Meet the Bi−ai≤mid b_i-a_i \le mid point on the tube, set the transmission point built in X,y X,y, the remaining points need to meet:| x−ai|+| Y−bi|≤mid | x-a_i|+| Y-b_i|\le midThis is
The bare maximum spanning tree +lca=. =, two templates just a little bit better =w=
Type Rec=record ll,rr,len:longint;
End
var n,m,l:longint;
I,j:longint;
A:ARRAY[0..50010] of rec;
F,D,LAST:ARRAY[0..10010] of Longint;
EndurerOriginal
1Version
Code added to the first part of the homepage of the website:/-------- --------/
Code added to the central part:/-------- --------/
1. hxxp: // G *** M *** 06. Z *** KD *** 5366cn/kkk/wm.htm
Contains VBScript programs
A strongly connected and directed simple graph. Each edge has two values, D and B. Set S to a non-null real subset of the point set.
Q: Is there sum (d (I, j)
No idea at all during the competition... The maximum stream is still a whiteboard.
Idea:
This question is about selecting the maximum load path from 1 to n and finding the maximum load.
To obtain the maximum load, we need to find the minimum load that each route can carry.
You can use Dijkstra algorithm to find
Assume that the current
Want to see more problem-solving reports:Http://blog.csdn.net/wangjian8006/article/details/7870410Reprinted please indicate the source: http://blog.csdn.net/wangjian8006
There are n cities and M roads with a carrying capacity on each road. Now the
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.