I. Progress (B206)You all go home, so what do I do? I have to go, too. But this will regret, in order to return to the stool or refueling it ~Local tyrants teammate Fruit 6 shot out of the effect is not the same ~ everyone Happy Dragon Boat Festival.Two. Sprint Backlog
not chected out
CHECK out
note
algorithm needs to be modified
Sprint Stage One (third day)Yesterday: In C # Windows Forms applications, design a simple game interface.Today: First of all the problems encountered yesterday, although not to find the reason, but as long as each step of the changes to run immediately, to exclude some of the illegal operation is ignored.Task: Improve the interface settings.Encounter problems: Each startup project will be error, forced to restore the first modification.Fix the problem
1. Member Technology StatusPeople are not too familiar with the development of Android-based systems. It starts from scratch, but everyone is full of passion and motivation.2. Partial Task Requirements Index card3. Mission claimFramework and interface beautification of the claimant: Guo HaoBaidu Map API information collection and claiming person: Zhang JianDatabase design and Information acquisition: Ranghujie, Duyongsu4. First Sprint time and targetM
Our team's project progress is relatively slow, but the basic completion of the second phase of the plan content, we are not very positive, but some teammates are very strong, in the project, occasionally will find that the content of the plan will lack some parts, there are unreasonable plan content, very hard to solve the problem, Some plans make a slight change. We have to continue to refuel, and hope that efforts can be done better. time flies, immediately to the final stage of the
The first sprint was performed in the last two weeks. The following points were neglected.
1. Statistical analysis of the planned time and actual time. The planned time value recorded on the card also has the actual value, which is not identified separately. As a result, the actual values are not counted. However, from the task completion, 0.7 of the input is indeed a suitable value.
2. The difference between the chicken and pig of participants is t
mainactivity is a main class that inherits from the flashlight class. An inherited list of three nodes is formed at this time. The Baseactivity class is mainly used for initialization;Today's task: realize the dynamic layout of flashlight;Tomorrow's goal: to achieve the dynamic layout of the flashlight;5.12Yesterday completed: Activity_main.xml modified, the use of the framework layout, control the level of display, to achieve the effect of overlay display;Today's task: realize the dynamic layo
2017-2018-1 Java Experimental Station sprint DAY07
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Write a blog, do the summary
100%
Qili
Partial button picture, PS for button picture
100%
Zhang Haolin
Help to complete the team blog, the whole process of the design of the leak to
2017-2018-1 Java Experimental Station sprint DAY04
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Write a blog, do the summary
100%
Qili
Find the background music
100%
Zhang Haolin
Game operating Instructions
100%
Zhang Tai Yuk
Game Introduction Page
2017-2018-1 Java Experimental Station sprint DAY05
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Carry out the summary
100%
Qili
Find the button music
100%
Zhang Haolin
Write a blog
100%
Zhang Tai Yuk
Game Start Page
100%
Wangbiao
2017-2018-1 Java Experimental Station sprint DAY01
Tasks claimed by individual members in the Alpha phase
Group members
Division
Task Volume
Zhang Yiqi
Write blog, post-marketing, marketing, chores, the coordination of various functions
Qili
Provide a promotional map, provide the game some windows (login, tips, shopping, etc.) background map, buttons, a
team blog
team GitHub
Third sprint questions and suggestions
hgf520
Regionalcrimeunit
Server version cannot order
xjy-gg
goidenbubble
Upload the app to the store.
liezhihua
LWHTF
Upload the app to the store, Burndown chart with tools
caicaihong
RaiCai
github commit record too little,
deadline:2015-11-07 8:00amThis team work will last two weeks, complete the alpha version of the project, and demonstrate in the 2015.11.07 practice session.Read or re-read the building Act to help with the scheduling and problems of the project sprint.1, in a period of two weeks, scheduled sprint 10 days. Stand-up meetings are held every day to discuss the progress of each member of the project yesterday, t
Irritability, irritability, irritability.I wanted to make a list of the ListView from the big early morning and did not do well at night. I don't know why. Decide to ask your classmates tomorrow. Do not come out too affect the mood. Although it feels good to make something.Also feel really no teammate is quite lonely. Because it wouldn't have been. Plus lookers at the end of the day can not find out what is wrong.Ask the other team to do Android development tomorrow. Ask for advice and experienc
Ok this is the tenth day, according to the Whiteboard task on the words, today is not completed, so wait to see if we can finish him today, the problem today is that I adjusted the UI design, because the previous design has been duplicated, wasted the screen. So it's better to save up and arrange some other things. Cause today did not do about the weather of the city database, and so will continue to look at the database of the establishment of things, look for other weather app template to look
1. Current situationTeam members to position, straighten out the plan ideas, set up a work plan.2, some requirements index cardThe first stage does not have a specific implementation of the functionality.3. Mission claimProduct Owner: Wang HongyuMaster: Chen SimingProject Development members: Xu Jiahao, Wu Xutao4. Recent TargetsObjective: At the end of the first phase, we basically implement the entire function of the project.5. Expected difficultiesThe leader is too addicted to the game, drag t
Today, I find myself unable to do the project as planned. Get this and then unknowingly get over there, the result is which side is not good, but very tangled. Still have to give yourself a plan day shift, every time just plan this two days of not at all. Tomorrow you will specify a plan whiteboard, and then strictly follow this execution.Today the main thing is to understand the githup aspect. There is a problem with the interface. Then the UI tuning also made some changes:Well, I know it's the
Date
What did you do today?
What to do tomorrow
The difficulties encountered
6.1
The implementation of the accounting window
Continue to improve
Confirm that the return of the key cannot be connected
6.2
Perfect the Accounting window
Expected Values window
The Accounting window option needs to be a radio box
6.3
Expected Values window
Refine expected Values window
No connection to other items
2016-05-24 TuesdayAs a result of this group's temporary change of development tools, use Android developmentToday mainly in the Learning configuration andriod development environment.2016-05-25 WednesdayThe development environment has been basically configured to complete, today we will initially implement the registration interfaceProblem: Database connection is not working properly storing data2016-05-26 ThursdayCompleted the login screenDifficulty: User name error when still logged in normall
What I did yesterday:1. Integrate the code and add comments.2. Found a program error, when clicking on the page pop-up browser window, you need to run the thread two times to run correctly.What to do today:Increase the scoring system in the browser.The difficulties encountered:1. When consolidating code, many variables, methods are not very clear about their role, need to re-read their code from beginning to end.2. In solving the thread running problem, there are two cases, first click on the pa
Things to do yesterday:Basic layout of the score query interface, binding with button settings eventsThings to do today:When you import the contents of an Excel table into a database, you also synchronize the student information for the score tableThe difficulties encountered:Run error array out of bounds when importing, because the subscript of the query statement is set incorrectly when importing Excel tableAfter the completion of the function, the test found that the table refreshed after the
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.