Very chanced on metalworking practice, more time than usual.Burndown Chart: Team Cleancode031302505 Huang031302223 Ong Handsome031302511 Limberchen031302632 Zhang Yukun031302536 SulilingProject Progress Basic table of related database has been determinedHow to connect data between tablesBe sure to use SQL Server to store the data and establish a connection to the database.Problem:Whether the properties of the database tables meet the requirements laterHow the database is encodedExperience:In t
---restore content starts---Handsome as I can only leave behind the figure ...I. Standing meeting InformationThe main content of this conference is the reasonable planning task progress, refused to impracticality, refused to "M.F.B. S", to determine the content of today's mission to the login interface design and implementation, and preliminary discussion of the entire app is composed of several modules (ideal though plump, but the reality is always bone feeling). I hope the design of the overal
Today is the fourth day of our team standing meeting, but unlike usual, this morning did not run, but we still get up early to start the standing meeting.Yesterday:① implementation of the login page, registration page jump.② find a discussion, can be connected to the network of the party programming meeting discussion place, that is the library hall.Today:① set up a cloud server, for the follow-up of data upload and download to do bedding.② designed the upload page, after the login into the clou
What I did yesterday:The issue of the AVD simulator was solved yesterday.What to do today:Today, first familiarize yourself with the as programming method, and then start the design of the login interface.The difficulties encountered:Yesterday has been to solve the problem is why the start of the AVD simulator, has been stuck in the Android interface, the original thought is my installation problem, the Internet is a lot of differences in the discovery may be created by the resolution of the sim
I. Contents of the MeetingSumming up the progress of the members so far, members have outlined the tasks they have completed, updated their task Kanban and Burndown charts, and on this basis each member has roughly estimated the tasks that they have planned to accomplish today.Ii. Schedule of tasks1, identified the project icon and the background picture of all walks of life.2, completed the Welcome interface, the weather interface and the reminder screen has a timed jump and by clicking the but
What I did yesterday.1. Database connection design for Java file types by analogy with Web data connection designFirst, each function is designed as a function, and the result is realized.Things to do today1. Design the Login interface,Create a top-level container object with JFrame, JPanel create an intermediate Class container object, add JPanel created objects to the top-level container object, set to absolute layout;Add button JButton, add registration, login two buttons respectively, add JL
close to see, I hope to adjust a bit 2, as far as possible unified language, convenient for everyone to view3, can load specific maps and paths19. Lollipop1, at this stage only to the database of the increase, query and feedback2, will not and the bank to the system conflict3, the interface is simple, hope to adjust a bit20, where are the money?1, can not be added automatically, I hope that some improvements2, the category is not clear, want to multi-classification3, can not embody the characte
After the bath ready to sleep suddenly remembered, is not anything else did not do,-unfortunately, eventually still think up, and then climbed up rushed a cup of the Hunhunyushui, began to write essays in high spirits.--PrefaceTeam CODE.R031302620 Ma Gone With (captain)031302619 Lu Kunming031302319 Wang Shun031302404 Chenjunda
The following are the main elements of today's meeting,1. Stand-up meeting swing picture 2. Project Burndown Chart3. Project Progress
Determines the type and p
Yesterday:① set up a cloud server, for the follow-up of data upload and download to do bedding.② designed the upload page, after the login into the cloud disk, click Upload Press can upload.Today:① Preliminary design of the download function pageProblems encountered during the process and solutions:① continue to look for cloud disk main interface template, want to reference Baidu website page design, reference source code, found very complex, and will not be used.Team Project first stage
1. Yesterday:Specific applications learn about UI design, design the UI interface of the team project, and add various controls and buttons.2. Today:Begin to design the UI interface for your team project incrementally, implement the specific functionality of your project, and add controls to implement the appropriate functional requirements.Gradually start designing the UI interface for your team project, as well as optimizing the UI interface.UI interface Design has been a preliminary prototype
Personal Sprint 01What did you do yesterday?1. Install the Sqllite database;2. Query how to use Sqllite;3. Writing the initial pageWhat did you do today?1. Writing the registration page2. Writing the login pageWhat are you going to do tomorrow?1. Connect the registration and login pages to the database2. Perform a page beautificationWhat difficulties have you encountered?1. How to connect a database to a page2. How to get data parameters for a page3.
Yesterday's events (difficulties encountered):An attempt was made to fix an error in the JTable table, but it did not succeed. Because there is no reference to the example, so also have to explore themselves, such as the panel redraw or re-declaration of the table, but there is no difference. There is also a speculation that tbablemodel with the use of vector-based dynamic model, so it may be stored without releasing the problem, can be repaired to try again.What to do today:Due to the submissio
I. Contents of the MeetingSumming up the progress of the members so far, members have outlined the tasks they have completed, updated their task Kanban and Burndown charts, and on this basis each member has roughly estimated the tasks that they have planned to accomplish today.Ii. Schedule of tasks1, on the basis of the outcome of the meeting, the members began to carry out the task2, control ListView to achieve a weekly weather forecast display3, the implementation of the reminder to add4. All
What did you do yesterday?Production software logo, has been hesitant, uncertain, and because things are more, exams near, spend less time, inefficient.What are you going to do today?I also see the teacher's evaluation, is indeed very low efficiency, is not very valuable, because my own module almost finished, because the overall structure and change big changes, so my module also temporarily add up, follow-up work can not be done, can only do some art. Today to complete the logo, my module has
After three sprints, the course design was completed, and the source program was updated on GitHub.In the "arithmetic", there are 1-6 years of difficulty setting, each level of difficulty, and gradually, basically meet the needs of pupils in mathematics practice.In the difficulty setting, we draw lessons from the elementary School mathematics textbook:By the above textbook discussion, in the difficulty of the question we made a small adjustment to the three or four grade difficulty, reduced the
I. Contents of the MeetingSumming up the progress of the members so far, members have outlined the tasks they have completed, updated their task Kanban and Burndown charts, and on this basis each member has roughly estimated the tasks that they have planned to accomplish today.Ii. Schedule of tasks1, on the basis of the outcome of the meeting, the members began to carry out the task2, control ListView to achieve a weekly weather forecast display3. All other items are in progress.Iii. Task Kanban
Mao Shan everbright Large group: Lin Qingguang, Lu Shengtian, Huang Xiungjun, Chen Ziyi . After three phases of collaborative efforts, co-operation, "Primary school arithmetic" app has realized all the functions originally conceived: User registration and login (including retrieve password, remember password function), user registration completed at the same time become a game account (can be upgraded, add coin function), which, The core functions of the program include addition, subtraction, mu
I. Contents of the MeetingSumming up the progress of the members so far, members have outlined the tasks they have completed, updated their task Kanban and Burndown charts, and on this basis each member has roughly estimated the tasks that they have planned to accomplish today.Ii. Schedule of tasks1, on the basis of the outcome of the meeting, the members began to carry out the task2, control ListView to achieve a weekly weather forecast display3. All other items are in progress.Iii. Task Kanban
the user name replyGu Weihua: Resolves a breakpoint inside eclipse that encounters multiple threads, does not work or goes away, and if the statement is empty, it will continue to connect the Eclipse and sqlite databases implementation.(3) What difficulties are encountered?Zhang She Qi: Today, there is an interface , there is no syntax error, but when running or testing, you will get an error:"Source not Found" on "activitythread.performlaunchactivity ( Activitythread$activityclientrecord, Inte
I. Details of the meetingTime 2016/5/29Ii. minutes of proceedings
Name
What did you do today?
What to do tomorrow
Problems encountered
Rico
Optimize the main interface background
Continue to optimize
Not currently
Mao Wenwen
Be familiar with the relevant tab knowledge
Complete the merge
Lack of knowledge.
Zhang More
Perfect the fan graph statistic interface
Beautify the whole
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.