A. Sprint Requirements:
Unlocking Reminders Section
Interface design
Login function
Memo function
Achievement System
Two Job Claim:Because there are members leave home, so deferred claim, the main task is to learn how to develop and build a development environment on the Andriod platform.Online collection of reference code, and practical operation exercises.Three Daily standing meeting time and place:According to the discussion, th
Daily Scrum: the first daymeeting time:4.14.8:30 P.M.Venue: first Floor hall of basic teaching buildingpanel members: Bin等, Lin Yanlu, ZhangConference Process• First we discussed the experimental first Sprint1 to achieve the function of our initial goal.• We then combed through the first phase of user requirements and the tasks required.• Assignments and pick-up of tasks are followed.• In the end everyone has a time estimate of their own tasks,Sprint
Today is the Nineth day of the sprint. Should have entered the second half of the sprint. The UI design for today's Android interface is basically complete. But there are some bugs, how can not adjust themselves, tomorrow need to consult the great God to go.Today we have finished the tasks that were assigned yesterday. Yesterday, my own hands to make the design to start again. Then the function of the contr
How to integrate Sprint Boot into MongoDB: sprintmongodb
Mongodb is one of the first popular non-relational databases and is widely used. It is usually used for offline data analysis and is mostly used on the Intranet. Many companies use cloud services and their servers are open to external addresses by default. As a result, a large number of MongoDB instances were attacked due to configuration vulnerabilities and their data was deleted some time ago,
I. Standing meeting Information The second stage of the team's sprint phase 13th day.At today's standing meeting, the team members are explaining the progress of each person. The overall progress is still optimistic.There is a picture of the truth:Ii. Schedule of tasksYesterday was mainly to continue writing the statistics interface to the music scene and finish the main interface. So far each of us progress you have already had a "qualitative leap",
Personal Sprint 07A Task: Continue to implement the registration interface to complete the function of SMS Verification code reply during registrationTwo Estimated time: 2 days.Three Actual time Taken: 5 days (3 days overdue).Four Ask yourself a question and answer three questions:(1) What did you do yesterday?Programming, has been solving the problem of SMS Verification code reply function(2) What to do today?Programming, continue to solve the proble
Team Project Sprint Eighth Day Personal summary is as follows:1. What did you do yesterday?Yesterday solved the problem of unable to get full screen, that is, simply add a theme attribute value in the XML file, the original has been unable to get full screen because the property value is added to the wrong place, in addition, a function added a welcome interface, for this interface set a certain time, After the end of time automatically jump to the ma
the seventh day of the sprint, crying out, smart search finally writtenteam:F4 Members: 031302301 Bijong031302302 Cai Yixuan031302430 Shaoyang031302418 Huang YanningMeeting content:1. Stand-up meeting Photo:2. Project Burndown Chart3. Project ProgressIntelligent search function for ① map complete② added label add function complete③ geo-fencing implementation4. Project difficulties① path Planning I don't know if we can finish it in a specified time.5.
The third day of the sprintRead the teacher's reply, I know before including the current sprint report is wrong, just say what we did today, and do not have a good memory of what we did yesterday, what to do tomorrow, fortunately received a reply in time, fixed the error.The reason for the weekend, Flowers to party lecture, but still very serious to complete our daily task. On the party lecture originally hard, not only to a day, but also to write 4 r
Today is the Nineth day of the sprint. The last two days have been doing on the landing and integration of the whole process of the task, for any time to explode the error, have been exhausted, for every small jump implementation is a little excitement and luxury.Yesterday: have been doing about the landing interface and the main interface connection, originally a imageview is not difficult to achieve, but it takes a lot of timeToday: Finally realized
Personal Sprint 09A Task: Implement user-defined function, can modify user name (default user name is Id,id not change) upload avatar, modify avatar, change login password, see the latest news of people who are concernedTwo Estimated time: 3 days.Three. Actual Time: 2 days (1 days remaining)Four Ask yourself a question and answer three questions(1) What did you do yesterday?Figure out how Sqlitedatabase created and never closed errors are caused by im
The fourth day of the sprint, the first two days a day in a hurry to work, one day learning .... team:F4 Members: 031302301 Bijong031302302 Cai Yixuan031302430 Shaoyang031302418 Huang YanningMeeting content:1. Stand-up meeting Photo:2. Project Burndown Chart3. Project Progress① renaming a cluttered file name② geo-fence commissioning is basically complete4. Project difficulties① because it was not clear before, the group members of the name of the file
Personal Sprint 03A Task: Implement the function of post, the user can post, publish the problem, everyone visible and can display the user name replyTwo Estimated time: 5 days.Three. Actual Time: 2 days (3 days remaining)Four Ask yourself a question and answer three questions(1) What did you do yesterday?Resolves an issue in which a block of code that requests data is never executed when using the aggregated data API , and continues to implement the
Struggling programmers in a few kilobytes of upload speed ... team:F4 Members: 031302301 Bijong031302302 Cai Yixuan031302430 Shaoyang031302418 Huang YanningMeeting content:1. Stand-up meeting Photo:2. Project Burndown Chart3. Sprint Form4. ExperienceA period of idle let hands some unfamiliar, but we still quickly adapt, the new phase of the task is half repetitive work, half is a new challenge, we will still as hard as before to develop, just like the
Standing meeting 11) today is the first day of the second stage of the sprint, so yesterday, as the PM of my organization opened a small meeting,Discuss the objectives and overall tasks of this phase and simply split the task.2) My task is to do with the small Zhang, less than together to complete the user-defined shortcut key setting function.3) Problems encountered: Before the main code is written in Form1.Load, and the code to set the shortcut key
1. This cycle is relatively short, or according to the previous sprint process requirements, backlog-Kanban-Burndown chart-Daily stand, etc., and reflected on the blog.2. Demo time: June 2016 21 pmThe demonstration can refer to the graduation design reply, which contains two parts:Project presentation, which summarizes the project, team, development process, etc.Run demos, implement functions, business, user feedback, and more.Hope that the group care
The second sprint is over today and has learned a lot of things for 10 days.Just say what you did yesterday: integrate the functions of each component.Today: The team summarizes and strengthens performance.Problems encountered in these 10 days:First, for the Internet cloud, before all the other team members in use, I have no how to contact, so in this area do not very good. But after their own slow study, it is easy to solve these problems.Second, the
1, A, test procedures, analysis code, B, the initial internal testing version of the package to the user experience, summed up the functionality of the lack of delivery to PM.Problems: In the design code of Myball.cs and Ball.cs, most of the code and variables are not written in comments and are more difficult to understand.The return code is supplemented by programmers.User feedback: (1), small ball size, the number of more, (2), keyboard control is too sensitive (large displacement).2, yesterd
reflect the realization of what is the function;5.31Completed yesterday: The design of a different 6 function buttons;Today's task: Exclude error from code, worning errors, and prevent programs from crashing;Problems encountered: Appropriate deletion of the code;6.1Completed yesterday: Exclude code error, worning errors;Today's mission: to complete the second design phase of the product, to test it on the mobile side;Problems encountered: Enter the return to the main interface button pause;The
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.