After the second stage of the sprint, we have a further improvement in the original function, and added a Notepad function, can basically realize the user's text input, save and modify, and can remind the user time, the alarm plate is mainly able to set the time, timing reminders, Prompt time can be selected from Monday to Friday, as well as the sound of the alarm clock can be selected from the phone's SD card, all rely on the cooperation between team
I. Progress (B206)You all go home, so what do I do? I have to go, too. But this will regret, in order to return to the stool or refueling it ~Local tyrants teammate Fruit 6 shot out of the effect is not the same ~ everyone Happy Dragon Boat Festival.Two. Sprint Backlog
not chected out
CHECK out
note
algorithm needs to be modified
Sprint Stage One (third day)Yesterday: In C # Windows Forms applications, design a simple game interface.Today: First of all the problems encountered yesterday, although not to find the reason, but as long as each step of the changes to run immediately, to exclude some of the illegal operation is ignored.Task: Improve the interface settings.Encounter problems: Each startup project will be error, forced to restore the first modification.Fix the problem
1. Member Technology StatusPeople are not too familiar with the development of Android-based systems. It starts from scratch, but everyone is full of passion and motivation.2. Partial Task Requirements Index card3. Mission claimFramework and interface beautification of the claimant: Guo HaoBaidu Map API information collection and claiming person: Zhang JianDatabase design and Information acquisition: Ranghujie, Duyongsu4. First Sprint time and targetM
Our team's project progress is relatively slow, but the basic completion of the second phase of the plan content, we are not very positive, but some teammates are very strong, in the project, occasionally will find that the content of the plan will lack some parts, there are unreasonable plan content, very hard to solve the problem, Some plans make a slight change. We have to continue to refuel, and hope that efforts can be done better. time flies, immediately to the final stage of the
The first sprint was performed in the last two weeks. The following points were neglected.
1. Statistical analysis of the planned time and actual time. The planned time value recorded on the card also has the actual value, which is not identified separately. As a result, the actual values are not counted. However, from the task completion, 0.7 of the input is indeed a suitable value.
2. The difference between the chicken and pig of participants is t
mainactivity is a main class that inherits from the flashlight class. An inherited list of three nodes is formed at this time. The Baseactivity class is mainly used for initialization;Today's task: realize the dynamic layout of flashlight;Tomorrow's goal: to achieve the dynamic layout of the flashlight;5.12Yesterday completed: Activity_main.xml modified, the use of the framework layout, control the level of display, to achieve the effect of overlay display;Today's task: realize the dynamic layo
2017-2018-1 Java Experimental Station sprint DAY07
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Write a blog, do the summary
100%
Qili
Partial button picture, PS for button picture
100%
Zhang Haolin
Help to complete the team blog, the whole process of the design of the leak to
2017-2018-1 Java Experimental Station sprint DAY04
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Write a blog, do the summary
100%
Qili
Find the background music
100%
Zhang Haolin
Game operating Instructions
100%
Zhang Tai Yuk
Game Introduction Page
2017-2018-1 Java Experimental Station sprint DAY05
Tasks completed by individual members today
Group members
Work Today
Complete Progress
Zhang Yiqi
Carry out the summary
100%
Qili
Find the button music
100%
Zhang Haolin
Write a blog
100%
Zhang Tai Yuk
Game Start Page
100%
Wangbiao
2017-2018-1 Java Experimental Station sprint DAY01
Tasks claimed by individual members in the Alpha phase
Group members
Division
Task Volume
Zhang Yiqi
Write blog, post-marketing, marketing, chores, the coordination of various functions
Qili
Provide a promotional map, provide the game some windows (login, tips, shopping, etc.) background map, buttons, a
5.26Before completion: Flashlight basic ability to achieve;Today's mission: the design of the main interface;Problems encountered: In an activity to achieve the interface of the jump;5.27Completed yesterday: Design of the main interface;Today's mission: The design of warning lights;Problems encountered: In multi-threaded access to the view, warning lights alternately flashing;5.28Completed yesterday: The design of warning lights;Today's mission: The design of the Morse code module;Problems encou
Sprint Planning Meetingmeeting time: 8 pm 16:00Meeting Venue: DormitoryConference Process? First, we discuss some of the tasks that need to be done to complete the volleyball scoring rules: initial design of the program, data analysis, typical users , scene, code writing, code review, work progress. ? then the realization of the basic function is discussed, and the work is claimed by the Division of labor. ? In the end, everyone made an estimate of
Personal Sprint 02A Task: Implement the function of post, the user can post, publish the problem, everyone visible and can display the user name replyTwo Estimated time: 5 days.Three. Actual time: 1 days (4 days remaining)Four Ask yourself a question and answer three questions(1) What did you do yesterday?To implement the function of posting, users can post their own posts, issue issues.(2) What to do today?Resolves a problem in which a block of code
Team Cleancode 031302505 Huang031302223 Ong Handsome031302511 Limberchen031302632 Zhang Yukun031302536 SulilingI. Completion of the situation:team members are basically familiar with the use of Git, recently submitted code on GitHub, now the main task is to learn the use of the server, there are some shortcomings in the improvement of the alpha version . Two. Project Progress:Three. Challenges encountered: to re-find the Weather Module API interface, the use of the server in the process of
Today is the second day of our team project's second sprint and the individual is summarized as follows:Yesterday: Yesterday we made a system optimization of our code, our future software development is on a computerToday: After the first stage of the interface design, we began to design the specific functions of the buttons today, we first set the slide-off menu.Difficulties encountered: Planning menu references online ready-made packages but I'm not
Personal Sprint 10A Task: Implement user-defined function, can modify user name (default user name is Id,id not change) upload avatar, modify avatar, change login password, see the latest news of people who are concernedTwo Estimated time: 3 days.Three. Actual time: 3 days (0 days remaining)Four Ask yourself a question and answer three questions(1) What did you do yesterday?Solve the problem of how to copy the content when the Classpath file is accide
I. Standing meeting ContentWe will be nearing the end of our mission to complete the progress of the imperfect place, in yesterday's task after the deletion, we pay more attention to the main problem of the function of the solution, perhaps our appWill not be better than we expected, perhaps this time more energy into the main functions to achieve more perfect.Ii. Standing meeting Work photoIii. Schedule of tasksEveryone in the final final sprint, the
This recommendation is for the Panel's recommendation only, if there is any inconvenience, please forgive me 0.0Press first Sprint Stage rating table to arrange
Group number
Group name (or title)
Suggested a
Recommendation two
Recommendation three
1
Bug Killer
It's better to jump directly from the Web by scanning the code.
Connecting to a database
Beautify the interface.
What to do today:Today I have not set up a good environment, to build the environment requires a Web server, I found some online tutorials, step by step to seeI also have registered login interface design, that is, the jump function is not fully implementedWhat I did yesterday:Start the first day of the sprint todayWhat to do tomorrow:Tomorrow try to put all the login registration interface and registration successful failure interface and the main in
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.