2016 first half of information System Supervisor exam morning real problem (middle)

Source: Internet
Author: User

It is one of The basic requirements for the initial registration of the information System Supervision Engineer to take the examination of Information System Supervisor of soft examination and to obtain the certificate of Information System Supervision engineer. You must take the exam. The following is the first half of 2016 for you to organize the Information System Supervisor exam Morning real problem , to help you take the exam.


2016 first half of information System Supervisor exam morning real problem (26-50 questions)

The requirement Analysis specification cannot be used as (26).

A The basis of feasibility study

B Conventions between users and developers

C The basis of system outline design

D The basis of software acceptance test

A data Flow diagram (Dataflowdiagram,dfd/dataflowchart) is a tool that describes a system's data flow. It abstracts data independently and graphically describes the context and actual flow of information. The process is represented in the data Flow Diagram (27).

A Rectangular

B Rectangular with rounded corners

C Square

D Circle or Ellipse

In software engineering, high-quality documents should have integrity, consistency, and (28).

A Unity

B Security

C No ambiguity

D Combination of

Software configuration management covers the software lifecycle and affects all data and processes. Software configuration management items must remain correct, complete, and (29).

A Scientific

B Traceability

C Data Flow Analysis

D Structured analysis

Software static testing can be divided into static analysis and code walk-through, in which static analysis mainly on the program Control Flow analysis, (30), interface analysis and expression analysis.

A Configuration Item Analysis

B Business Flow Analytics

C Data Flow Analysis

D Structured analysis

The "Checkout" and "login" processing in the change control of the software configuration task implements two important change control elements, i.e. (31) and synchronization control.

A Access control

B Review

C Version control

D Registered

(32) does not belong to the basic characteristics of object-oriented technology.

A Encapsulation of

B Modular Nature

C Polymorphism

D Inheritance of

(33) is a diagram of the classes in the expression system and their interrelation, which is the core of object-oriented design, and establishes the basis of State diagrams, collaboration diagrams and other graphs.

A Object graph

B Component diagram

C Class diagram

D Configuration diagram

In object-oriented analysis design, the function of polymorphic mechanism is (34).

A Information hiding

B Implementing "One interface, multiple methods"

C Data abstraction

D Implementing "multiple interfaces, one method"

In project Quality management, the action is to restore the process to its previous normal state by "Troubleshooting" or taking "corrective action" (35).

A Quality planning

B Quality Assurance

C Quality control

D Quality Improvement

Important decisions about the future success or failure of the project should be decided by the project Construction unit. In order to help the construction unit decision, the supervision should (36).

A Covert information that may be detrimental to project stakeholders or senior management

B Fully coordinated with the contractor

C Fully coordinated with the contractor

D Provide accurate and complete and timely data in a regular and standardized manner

Party A, party B and party C are the construction parties, contractors and supervisors of a project, and party B will subcontract the non-critical parts of the project to Ding Fang. In the following procedure, it is correct (37).

A Party C should carefully listen to the views of party A and the opinions of party A should be conscientiously implemented in the supervision work.

B Party B May Entrust party C with the contract to help it comb the software configuration process and train relevant personnel

C C-side should manage and coordinate all aspects of Ding Fang's subcontracting project to ensure the project quality and project progress.

D Before subcontracting, party C should review the qualification of Ding Fang and sign the supervision opinion

The following information system engineering construction problems, belonging to the quality control is (38).

① system test is not clear, too many bugs, testing coverage is not comprehensive

② project implementation business needs investigation is insufficient, not comprehensive

③ project funds use unreasonable, exceed budget

④ Project Implementation Scope change

⑤ Business requirements during the implementation of the project

A ①④

B ②④

C ②⑤

D ①②⑤

In the information engineering supervision activities, the general contracting units of the Sub-Unit supervision and management, (39) as the project supervision activities.

A can also

B No

C OK

D Not exactly

According to the basic principle of quality management, the "D" in the PDCA Cycle refers to (40).

A Plan

B Implement

C Check

D Processing

For a project bidding, the total bid price of the integrator is 30 million yuan. According to the requirements of the tenderer, the Contractor shall submit a bid margin amount not exceeding (41) million.

A 60

B 80

C 90

D 150

(42) does not belong to the contents of the supervision contract.

A Supervision Business Content

B Liability for breach of contract and resolution of disputes

C The rights and obligations of the three parties, the construction unit, the supervision unit and the contractor

D How to take and pay for supervision expenses

In the Informatization project, the supervision plan should be prepared after signing the contract of entrusted supervision and (43).

A After implementing organization design approval

B After approval of preliminary design documents

C After receiving the implementation design file

D Before commencement of project implementation

The main person responsible for compiling the supervision outline is (44).

A Company Project Director

B Professional supervision Engineer

C Chief Supervision Engineer

D Company Technical Director

The following description of the supervision planning, the correct is: (45).

A The purpose of compiling supervision planning is to embody the responsibilities and tasks stipulated in the contract of supervision, and to make measures to realize the supervision task on this basis.

B Supervision planning in the company director under the auspices of the establishment, and approved by the construction unit, the company director signed after the implementation

C Supervision planning is only a programmatic document that directs the work of supervision project and does not have the validity of contract.

D Supervision planning is on the basis of the supervision outline, according to the actual situation of the project to the specific implementation and operation requirements of the concrete, detailed, to guide the project Supervision Department to carry out the supervision of the whole business

The following about the outline of the supervision, supervision planning and supervision of the implementation of the details of the narrative, the incorrect is: (46).

A The purpose of compiling supervision outline for supervising unit is to develop basic plan for future supervision work.

B The preparation time of supervision outline is earlier than the sign of supervision contract

C The function of supervision implementation rules is to guide the development of specific supervision business of this major or the book project.

D Supervision outline, supervision plan, supervision and implementation rules are independent of each other, there is no correlation, indispensable

The following set up the work of the project supervision Organization in the order of arrangement, correct is (47).

① determine the supervision work, and classify and merge to form the department

② clear the overall objectives of supervision and determine the supervision tasks

③ develop the supervision work flow

④ establishment of Supervision Organization structure chart

⑤ set up the task, work and Function Division of Supervision Department and personnel

A ①②③④⑤

B ④①③②⑤

C ②①④⑤③

D ④②⑤①③

The following is an incorrect description of the meaning of the quality Control point: (48).

A The setting of the quality control point is advantageous to calculate the deviation of the sub-item control target value from the actual value

B It is advantageous to realize the quality control point at the upper level by realizing the sub-target of the lower level quality control point.

C Quality control points facilitate the decomposition of complex engineering quality objectives

D The goal of quality control point is single, which is disadvantageous to supervision engineer's control and management

A serious quality accident occurred in the course of the implementation of the integrated Cabling Project, at which time the chief Supervision engineer should first work on the issue of the project suspension order and require the construction unit to take (49) measures.

A Seize the rectification and return to the early resumption

B Prevent accidents from expanding and protect the site.

C Prevention of abnormal disclosure of accident information

D Strengthening supervision over the responsible person of accident

The basic principle of quality control in information engineering is (50).

A People as the core

B Enhanced Active control

C The key points of control

D Quality control to be fully controlled


2016 first half of information System Supervisor exam morning real problem (middle)

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.