The construction owner and technical personnel should be familiar with network construction requirements, construction methods, and material usage, and be able to explain network construction requirements, construction methods, and material usage to the construction personnel, in addition, it is necessary to regularly conduct construction on the construction site, check the quality, and solve the problems raised by the on-site construction personnel at any time.
1. clarify requirements and methods
The owner and technical personnel of Integrated Wiring should be familiar with the network construction requirements, construction methods, and materials usage, and be able to explain the network construction requirements, construction methods, and materials usage to the construction personnel, in addition, it is necessary to regularly conduct construction on the construction site, check the quality, and solve the problems raised by the on-site construction personnel at any time.
2. Master Environment Information
Master the environmental data of the network construction site as much as possible, and propose Protection Measures to Ensure network reliability according to the environmental data:
In order to prevent accidental damage, outdoor cables should generally be placed in underground pipelines. If overhead is required, the cables should be tall (4 meters high) and fixed on the wall or pole, do not place frames on poles, wires, walls, or even door frames or window frames. Indoor cables should generally be laid in the cable trough at the top of the wall.
Communication Equipment and various cables should be fixed to prevent random movement and affect system reliability.
In order to protect the indoor environment, cable trough should be installed in the room, and cables should be placed in the cable trough. All cables must be drilled into the room and floor, and all cabling must be horizontal and vertical.