Activity resource estimation Input
1. List of Activities and detailed support basis
2. Organizational Process assets
3. Resource Availability
Tools and technologies for estimating activity resources
1. Expert suggestion Method
2. Determine the Replacement Scheme
3. Public estimation data
4. estimation Software
5. Bottom-up Estimation
Activity resource estimation output
1. Activity Resource requirements
2. detailed basis for Resource requirements
3. Updated activity list
Activity Duration Estimation
Input of Activity Duration Estimation
1. activity list
2. activity list attributes
3. Project Scope
4. Project Cost Estimation
5. Activity Resource requirements
6. Resource Availability
7. process assets of the Organization
8. Risk records
Tools and technologies for estimation of Activity Duration
1. Expert judgment
2. analogy Estimation
3. quota-based duration
4. Three-point estimation of duration
5. reserved time
6. Maximum Activity Duration
Output of Activity Duration Estimation
1. estimation results of Activity Duration
2. activity list (updated)
3. activity list attributes (updated)
Develop a schedule
Input for plan preparation
1. Project Scope
2. Project Progress Network Diagram
3. Estimation of Activity Duration
4. Activity Resource requirements
5. activity list attributes
6. Risk records
7. activity list attributes
8. Resource calendar
9. Constraints
Tools and technologies for preparing progress plans
1. Critical Path Method (CPM)
2. Progress Compression
3. Simulation
4. Resource Balance
5. Key Chain
6. Project Management Software
Project Schedualer
SureTrak Project Manager
Primavera Project Planner
MS Project
7. encoding structure
8. calendar used
9. Advances and latencies
10. Plan Review Technology (Program Evaluation and Review Technique, PERT)
Output of Schedule
1. project progress plan
At least the planned start date and expected completion date of each detailed activity are included. Project Progress plans can be expressed in summary or details. Commonly used representation: Project Network Diagram with date information, Gantt chart, and milestone diagram.
2. Detailed Basis of the progress plan
3. Progress Management Plan (update)
4. Resource requirements (updated)
Progress Control
The progress control includes: determining the current progress; imposing an impact on the factors that cause the progress change to ensure that the change is in a favorable direction; and determining whether the progress has changed; manage changes when they occur and are occurring.
Progress Control Input
1. project progress plan
2. Performance Report
3. approved change requirements
4. Progress Management Plan
Tools and technologies for progress control
1. Progress Report
2. Progress Change Control System
3. Performance Measurement
4. Project Management Software
5. Deviation Analysis
6. Gantt chart comparison
Progress control output
1. progress plan (update)
2. Change requirements
3. recommended corrective actions
4. Lessons learned