Advanced: October 23, 2015 job answer

Source: Internet
Author: User

advanced learners: 2015 Year 10 month 23 day job
One, business process management and reorganization
1

The core of process management is the process, The essence of process management is to construct superior business processes.
2 , process management and bpr

process management is centered on a standardized, end-to-end, business process Excellence , with a systematic approach that aims to continuously improve the organization's business performance. Similar to the definition of business process reengineering. The idea of process management includes the bpr bpr The concept is broader and more suitable for realistic needs.
3 , the process and method of business process improvement, analyze the problem with which 2 figure; look for a reason.

Analysis of the problem using brainstorming, matrix diagram method, Find the reason with Fishbone chart method.
4 , the process of analysis and design method is six (only a small title);

value chain analysis, abc Cost method, process modeling and simulation, based on Unified Modeling Language ( ) Business Process Analysis modeling method, Brainstorming and Delphi method, benchmarking method.
5 , bpr

BPR bpr To achieve consensus.
6 , bpr 3

Change of enterprise culture and concept, change of business process, organization and management
Second, knowledge management
1 , for the project organization, what is knowledge.

For the project organization, knowledge is the intellectual resources of the design and development results, various patents, non-patented technology, design and development ability, and the skills of the project members.
2 , the method of sharing tacit knowledge 4 article;

Coding, face-to-head communication, personnel rotation, network
Iii. Overall performance evaluation of the project
1 , what is 3E audits;

Performance Audits (3Eaudit) is the economic audit, efficiency audit and effect audit collectively, because the first English letter of the three areE, so called3Eaudits. It refers to the supervision, evaluation and verification of the rationality, economy and effectiveness of the economic activities of the audited units or projects by an independent audit institution or personnel, in accordance with relevant regulations and standards, and by means of the audit procedures and methods, and proposes an independent supervisory activity for improving the management benefits.
2 , Hall from where3Dimensions of System engineering.

Logical dimension: logic reasoning, probability and statistical reasoning, fuzzy mathematics

Time Dimension: Project-based time schedule division, Project initiation, project implementation and project termination; project evaluation can be divided into current assessment, project tracking and evaluation, post-project evaluation.

Knowledge dimension
3 , and what to solve separately: certainty, uncertainty that can be measured, uncertainty that cannot be measured.

logical reasoning solves the problem of project evaluation that determines the outcome of a problem, namely deterministic assessment. Probabilistic and statistical reasoning solves project assessment issues that determine the possible outcome of a problem, namely, risk assessment, or "nondeterministic uncertainty" project evaluation. Fuzzy mathematics solves the problem of project evaluation of uncertain results of uncertain problems, that is, uncertain project evaluation problem, also known as "non-measurement uncertainty" project evaluation.
4 , understand the calculation of payback period, the formula is:
Payback period=(number of years in which accumulated static cash flow appears positive-1)+|absolute value of accumulated static cash flow last year|/static cash flow in the current year.
5 and understand the formula of bank interest rate calculationfn=f* (1+i) nTimes

Advanced: October 23, 2015 job answer

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.