Advanced System Project Manager Note 1

Source: Internet
Author: User

7.13.2016

PDCA

P (Plan)-planning, defining guidelines, objectives and activity plans

D (DO)-executes to implement the contents of the plan

C (check)-check, summarize the results of the execution plan, identify the problem

A (Action)-Actions to process the results of a summary check

Man-Machine material method Ring

People: Labor

Machine: Machine

Material: Material

Method: Methods

Ring: Environment

paper:

Title, abstract, body. (Note: No keywords, references)

Abstract: Within 330 words.

Text: Divided into the project background of about 500 words, a paragraph (project background four words can not appear in the paper);

The transition is within 300 words;

argument, an argument is a paragraph;

End.

4+n segment. If it is to write the overall management, n=7; progress management n=6; Quality Management n=3 ... process class paper, one is a paragraph.

Summary:

2016.7.15

1, the process steps all back, including the number of back, how many points.

Party A: Construction party

Party B: Contractor

Party c: Supervising party

Expert judgment: 1. Brainstorming Method 2, Delphi method

Decomposition and a top-down meaning, summary and bottom-up one meaning.

Brainstorming: 1. Every expert's speech can be seen by others. 2, I just collect opinions, do not give conclusions.

Delphi: 1, experts are not met, the views of each expert anonymous. 2. Finally, I formed a conclusion that every expert basically agrees with. This prevents individual views from being magnified.

Input: The condition of doing a thing.

Progressive Details: Recent plans are detailed and the plans are sketchy in the distance.

Rolling Wave plan: plan to keep updating.

Direct cost, Indirect cost: A project is independently assumed to be called directly. Co-assumed by several projects is called indirect.

Pre-allocation: Many of the core characters are in the default.

Virtual team: Not on-site, through the network of the team.

Weighted system: As the final exam is weighted.

Dummy activity: a virtual activity.

Baselines, baselines:

Performance Information:

Performance report: verb or noun. N: Unlike performance information, performance information can be formal or informal. But the performance report must be formal. V: Collect information and organize performance reports.

Organizational process assets: assets accumulated by an organization in the course of the past (experience, lessons learned)

Maslow's demand Theory: Five levels of demand, from 5 to 1: Physiology, security, social interaction , respect, self-realization.

Communication model: Pay attention to noise pollution and feedback.

Advanced System Project Manager Note 1

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.