7.13.2016
PDCA
P (Plan)-planning, defining guidelines, objectives and activity plans
D (DO)-executes to implement the contents of the plan
C (check)-check, summarize the results of the execution plan, identify the problem
A (Action)-Actions to process the results of a summary check
Man-Machine material method Ring
People: Labor
Machine: Machine
Material: Material
Method: Methods
Ring: Environment
paper:
Title, abstract, body. (Note: No keywords, references)
Abstract: Within 330 words.
Text: Divided into the project background of about 500 words, a paragraph (project background four words can not appear in the paper);
The transition is within 300 words;
argument, an argument is a paragraph;
End.
4+n segment. If it is to write the overall management, n=7; progress management n=6; Quality Management n=3 ... process class paper, one is a paragraph.
Summary:
2016.7.15
1, the process steps all back, including the number of back, how many points.
Party A: Construction party
Party B: Contractor
Party c: Supervising party
Expert judgment: 1. Brainstorming Method 2, Delphi method
Decomposition and a top-down meaning, summary and bottom-up one meaning.
Brainstorming: 1. Every expert's speech can be seen by others. 2, I just collect opinions, do not give conclusions.
Delphi: 1, experts are not met, the views of each expert anonymous. 2. Finally, I formed a conclusion that every expert basically agrees with. This prevents individual views from being magnified.
Input: The condition of doing a thing.
Progressive Details: Recent plans are detailed and the plans are sketchy in the distance.
Rolling Wave plan: plan to keep updating.
Direct cost, Indirect cost: A project is independently assumed to be called directly. Co-assumed by several projects is called indirect.
Pre-allocation: Many of the core characters are in the default.
Virtual team: Not on-site, through the network of the team.
Weighted system: As the final exam is weighted.
Dummy activity: a virtual activity.
Baselines, baselines:
Performance Information:
Performance report: verb or noun. N: Unlike performance information, performance information can be formal or informal. But the performance report must be formal. V: Collect information and organize performance reports.
Organizational process assets: assets accumulated by an organization in the course of the past (experience, lessons learned)
Maslow's demand Theory: Five levels of demand, from 5 to 1: Physiology, security, social interaction , respect, self-realization.
Communication model: Pay attention to noise pollution and feedback.
Advanced System Project Manager Note 1