A: Preface
1. Background: Stone Iron big Elevator Dispatch. According to domestic and international statistics, passengers in the elevator in the car for more than 1 minutes, that is, causing discomfort. Therefore, the manufacturers continue to develop high-speed elevators and scheduling technology. The purpose of this paper is to discuss the transportation of elevator during peak period.
2. Objective: Increase unit time traffic and reduce energy consumption.
3. Current situation: Stone iron large basic teaching building elevator: 4 public Elevators (two 20-storey 20-station, two 18-layer 18-station, complete set of 22 Group control), 1 teachers elevator 20 Floor 20 station, are giants Kone gps53k, load 1150kg, speed 1.60m/s.
Second: Preliminary investigation
On-site investigation, Peak period: weekdays, 7:40-8:05,9:50-10:10,11:57-12:12,13:45-14:00,15:50-16:10,17:55-18:15
Peak passenger status (average per ladder): upstairs: 12~15, Downstairs: 12~13 people
Leisure passenger status (average per ladder): up and down
Open/close time: 3s
Number |
Specifications |
Stop Layer |
Actual speed |
Flat-layer Time |
Average Transit time |
A1 |
20 Floor 20 Stations |
-2,-1,1,9,11,13,15,17 |
About 0.8M/S |
8.7s |
37.2s |
A2 |
18 Floor 18 Stations |
1,9,11,13,15,17 |
About 0.8M/S |
8.7s |
36.5s |
B1 |
20 Floor 20 Stations |
-2,-1,1,8,10,12,14,16,18 |
About 0.8M/S |
8.7s |
42.2s |
B2 |
18 Floor 18 Stations |
1,8,10,12,14,16,18 |
About 0.8M/S |
8.7s |
40.2s |
III: Demand PROVISIONS
1. Customer outbound input.
2. Set up the elevator operation log, and can output in real time.
3. Can better simulate multi-ladder operation, explore the optimization algorithm.
Four: Optimization algorithm discussion
Based on set selection and group control technology, it is set up artificially. Set parameter reference Kone company parameter document and Merck sub-code.
Analysis on pre-demand of elevator dispatching