In most scenarios, engineers can use CAD to report, avoid to do ppt, waste time, PPT is generally used once discarded. and engineers for the design of the intermediate reporting, or three-dimensional BIM reporting, review reports, display reports, etc., can be directly using CAD software, the method is to use the view to report.
The view is a magical thing, it supports different views, with different layers, different visual styles (simple rendering), such as wireframe, hiding, coloring and other modes.
CAD also provides slide vslide, but imagine that each reported page is saved as a slideshow, sorted out in order, and then lost.
and the CAD own view play (view switch) tool is not very useful.
Design a report-based view reporting tool, similar to PPT, click on the switch to the next view, you can do anything with the mouse-scaling ah, the size of ah ..., does not affect the next view.
Each view corresponds to a different layer, and if you are working on a layer's switch during the reporting process, you will be in a hurry to influence the reporting effect.
For three-dimensional graphics, a good view in advance, do a good job of visual style and transduction, a view.
With a test program to do hundreds of views, without any obstacles, if you use the viewport as a set of drawings, such as large drawings, the machine can not stand, will directly hang off.