Recently participated in the building automation for two days of training, first recorded the contents of the study, to facilitate future inquiries.
1. What is building automation?
Building automation is the building of electrical equipment, such as elevators, pumps, fans, air conditioners and other electrical equipment on-line monitoring, by setting the corresponding sensors, travel switches, photoelectric control, to detect the working state of the equipment, and through the circuit back to control the computer room center computers, from the computer to obtain analysis results, Then return to the device terminal for mediation.
2. Building Automation Manufacturers
Honeywell (Honeywell), Siemens (Siemens Building Technology), Schneider Electric (Schneider), Johnson Controls, etc.
3. Training Content
1) Schneider Building control system hardware configuration
The above training model is a brief description of the Schneider building control system's overall architecture, such as:
It is known that 1 PC can hang multiple communication modules, 1 communication modules can hang multiple cpu,1 CPUs can hang multiple IO modules, which are connected by Lon Bus.
2) Schneider Building control system software programming
The following is the general process of building the project
A. Building a service in the database 731
B. Build LonWorks Network
C. Building LonWorks Network Group
Building Automation Learning Notes