Consultant of soft examination information System, March 18, 2016 operation

Source: Internet
Author: User

Consultant of soft examination information System, March 18, 2016 operation:

Fourth chapter the organization Construction of Supervision Unit
1. What are the 3 parts of the system construction of supervision units?
2, the Supervision Unit supervision service quality management methods have 2 kinds, which 2 kinds? What are the pros and cons?
3, Supervision Service quality control mode, according to the time can be divided into which 3 kinds? What is divided by the control body? What is the evaluation method divided into?
4. What are the contents of supervision service quality control?
5. What steps does the supervision unit follow to establish and perfect the quality assurance system?
6, the supervision unit's right, should follow the principle of "", carry out supervision work?
7. What is the code of conduct for supervision units?
8, in the code of conduct, what is justice, what is independence, what is science.
9. The risk category of supervision Unit (record)? At the same time, understand the different types of content.
10, the supervision unit's risk prevention method is what to do (remember).

Fifth the organization and planning of Supervision Project
11, the organization and scale of the project Department of Supervision, according to what factors should be determined?
12, Supervision project implementation () responsibility system? What must the supervisor include? Can the Director's representative not be equipped?
13. The Supervision unit shall notify the construction company in writing () within the day after the contract of the entrusted supervision is signed ().
14, when the director needs to adjust, how to do? When the professional supervision engineer needs to adjust, how to do?
15, the responsibilities of the Director, the responsibilities of the representative of the Director, the responsibilities of the supervision engineer, the supervisor's duties?
16. What work does the Director not delegate to the Director (record)?
17, the definition of the outline of the project? Purpose and function.
18, the definition of supervision planning? Role? How long does the planning of supervision be prepared?
19, the definition of the supervision rules.
20, P60 page, table 5-1, be sure to understand. (remember)
21, supervision planning to carry out supervision work basis and foundation, the supervision plan is equivalent to the preliminary design, supervision equivalent ()?
22, the role of supervision planning? (remember)
23, the basic requirements of compiling supervision planning?
24, the basis of compiling supervision planning? The basis of compiling supervision rules?
25, the contents of the supervision plan (remember)? The contents of the supervision rules? EG: The supervision tools and facilities are in the planning, not the rules.
26, the supervision unit to provide the details to the contractor, can play a role? Can the contractor play a role?
27. The effect of the supervision rules on the construction unit, the contractor and the project department? (abbreviated according to the textbook content).

Sixth Chapter Quality Control
28. What aspects does the supervision unit have on the personnel control of the contractor?
29, what is the most important factor in quality control?
30, who is the quality control system can effectively run the overall project quality control key? () is one of the key factors in project success? Supervision Unit is the Coordinator, that is, to (), but also ()?
31, in the tripartite collaborative quality control, quality management system requirements: The construction unit, the contractor, the supervision unit participants (remember).
32, Supervision Unit supervision, inspection contractor Quality Assurance System of the main content including Which?
33. What is the significance of setting the quality control point?
A: (1) decomposition; (2) analysis; (3) monitoring; (4) deviation correction (5) Guarantee
34. What is the setting principle of quality control point? Remember
35, in the tender stage and the preparation stage, the supervision unit to the contractor and personnel qualification audit points of attention?
36. What are the key points for quality control in the critical process?
37. How to check the hardware design for the soft introduction from the country? How does software design check?
38, the project quality has a significant impact on the hardware and software, how to search/
39. Under what circumstances, the Director is empowered to issue a lockout order? Remember
40, the contractor after the acceptance of the application, the Supervision Unit audit acceptance plan and acceptance program, the main review content is what?
41, the acceptance of the quality problems, how to deal with it?
42. What are the means of quality control? Remember
43, for the test of the contractor, the supervision unit should supervise the evaluation of the contractor's ()? Remember
44, for the third-party testing, the main work of supervision units what? Remember
45, side station records to do what?


Consultant of soft examination information System, March 18, 2016 operation

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.