See a lot of engineers on the Internet to write the switch stack experiment, feeling is not very system, the following through their own experience to share to everyone:
Two Switch Stacking Labs:
First step: Material preparation
650) this.width=650; "src="/e/u261/themes/default/images/spacer.gif "style=" Background:url ("/e/u261/lang/zh-cn/ Images/localimage.png ") no-repeat center;border:1px solid #ddd;" alt= "Spacer.gif"/>650 "this.width=650;" src= "http ://s1.51cto.com/wyfs02/m00/78/30/wkiol1z3npmbxx0waacut2cd9py506.jpg "title=" stacking cable "alt=" Wkiol1z3npmbxx0waacut2cd9py506.jpg "/>
Step Two:
Configuring the Switch SW1 (as the primary switch)
Switch1 (config) #switch 1 Renumber 1
Switch1 (config) #switch 1 priority 10 (the device default priority is 1, the higher the priority value the greater the precedence)
Switch1#reload slot1
Switch1#wr
Step Three:
Configuring Switch SW2 (as slave switch)
Switch2 (config) #switch 1 Renumber 2
Switch2 (config) #switch 2 priority 9
Switch2#reload Slot2
Switch2#wr
Fourth Step:
Correct connection (the second module of the SWITCH1 is connected to the first module of the SWITCH2, the second module of the SWITCH1 is connected to the second module of the SWITCH2, resulting in redundancy)
First power on the Switch1
Power-On SWITCH2
Fifth Step:
Wait a minute, OK.
This article is from the "network Xiao Yang" blog, please be sure to keep this source http://7104405.blog.51cto.com/7094405/1726804
Cisco Switch 3750 Stacking experiment