Go Theory Class 6 Cabling construction considerations

Source: Internet
Author: User

As we all know, playing Go is separated from playing games, and ending games. For every opponent, the paralysis of each stage will hurt the game. The construction of the six types of cabling is like playing Go, so that the winning coupons can be stabilized only after each stage is completed.

Silver-side grass belly

The layout in go determines the trend of the entire game, and it is difficult to win if you become stupid. Before wiring construction, the overall planning is very important. With reasonable planning, it is possible to bring about a global victory. At the same time, the "Golden Cape silver grass belly" is the general principle that go should abide by throughout the disk, that is, the first to grab the horn and then occupy the edge and finally the middle. The same is true for wiring. "edges and corners" are the connection points of the distribution frame, the bending points of the line, and the two ends of the line, the following two principles must be followed throughout the process.

This is a general principle that must be followed when all cables are installed. Because the outer diameter of the six types of cables is larger than that of the five types of cables, in order to avoid Cable winding, especially at the elbow, you must pay attention to the fill degree of the diameter during pipeline design, generally, it is recommended that the pipe with an internal diameter of 20mm be placed with 2 6 cables. If multiple cables are placed, the winding problem between cables may cause interference and affect the transmission quality.

It is very important to manage drag-and-drop projects if there are any problems. during the construction period, the technical process should be notified in a timely manner, and the persons in charge of various types of work should communicate with each other. If any problems are found, they should be notified immediately, complete the job in time before the subsequent job starts. Otherwise, not only will the construction period be delayed, but hidden risks may be hidden.

Practice cheats

The actual practice is the most appreciated, because the actual practice is "excellent", not only must we have experience in dealing with a variety of changes, but also have the wisdom of careful calculation. Wiring enters the practical stage, and the following two secrets are indispensable.

Proper cable bending radius should be properly ensured during installation, which can be ensured by reasonable design of the cable tray. Specifically, when the cable bypasses other cable trough, the turning slope should be gentle. Pay attention to whether the cables at both ends can be covered with the cover without pressure loss.

The tension should not be too large during the wire laying process. We should pay attention to the control of tension. For cables packed with reels, we recommend that at least one worker be arranged at both ends to put the sleeve on the self-made wire rod, the laying end workers first pre-pull some cables from the scroll box for the collaborators to extract the cables from the other end of the pipeline. The pre-drawn lines should not be too many to avoid tangle of multiple cables on the ground.

Close carefully

It is generally possible to win or lose a game before it enters the ending stage. However, opponents with an average strength often have to win or lose a game at the ending stage. Therefore, we should pay more attention to it. This should also be the case in the ending stage of wiring.

After finishing the Redundant cable Cabling Process, you must sort out and protect the redundant cables at both ends. Do not overlay the redundant cables, when the disk is online, it must follow the original rotation direction. The diameter of the coil should not be too small. If possible, use the waste wire head to be fixed on the bridge, ceiling or in the carton, but do not tighten the cable tie, and make a note to remind other personnel not to step on.

Note that labeling must be as comprehensive as possible. It is best to have an electronic document at the same time, because the lifecycle of the cabling system is long and the network or cable will be changed in the future, it is easier to implement a complete and comprehensive cabling system.

  1. Six categories of cabling six considerations
  2. Precautions for optical fiber cabling

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.