Large-scale project involves a lot of construction teams, management units and related departments, each other needs to pass the number of data, documents are amazing, must establish an effective information management methods, so that managers grasp the project information in a timely manner, complete and accurate control of the project construction situation.
The modern construction management information is enormous, which brings a lot of work and heavy burden to the supervisors and the staff of all levels. There are many problems in the management of engineering information based on traditional working methods:
1. Planning no time to run the site, resulting in delays in rework schedule
2. Data management confusion is not intuitive, inefficient decision-making
3. Difficult coordination among participating parties and increased communication costs
Wish3d the latest release of Wish3dEarth, the realization of the three-dimensional world of the ultimate portability, with the same as the C/s mode of powerful features, no plug-ins, cross-platform features to become the super-large data volume release of the weapon to help you solve the engineering information management problems.
Realistic three-dimensional model: to make planning and design according to the
In the process of engineering planning and design, planners often do not have the time to personally run the site, the need for relevant personnel to rely on photo recording method to collect the situation. Heavy workload, low efficiency, it is difficult to ensure the timely and effective information, often cause rework, thereby delaying the duration, increase the cost of the project.
Get a picture of the site
Tilt Photography Three-dimensional modeling technology overturned the previous practice: the relevant personnel in advance to the site, using unmanned aerial vehicles to fly the construction site, using the model to record the scene to the planners; which places need to be re-viewed, focusing on this part, to create a more detailed three-dimensional model of the reality. compared with the way to take photos, convenience, accuracy greatly improved, to avoid the lack of experience caused by the loss of information, improve work efficiency.
Moreover, using wish3d Earth can direct three- dimensional measurement and spatial analysis of the three-dimensional model of tilt photography, which is more obvious in the complex engineering of topography.
Analysis of Wish3d Earth's Square volume
Wish3d Earth Area measurement & triangulation measurement
Web-side Data management: The construction situation is under control
The head of a large engineering and construction company told us that their projects are distributed throughout the country, the amount of engineering data is very large, and most of the previous use of mailbox, QQ, the form of transmission of data, often resulting in scattered data, management confusion problems.
Is there a way to realize real-time transmission of big data and manage it effectively ?
Wish3d Earth is a three-dimensional digital globe based on B/S model
Of course. Based on the web technology of B/S architecture mode, users do not need to download any client, just install a browser, you can achieve the Web platform information publishing, data sharing, communication and collaboration.
The real-dimensional model of wish3d Earth can be loaded up to 180G by measurement.
Wish3d Earth is based on the B/S model of the three-dimensional digital Earth, providing flexible information dissemination and management services, users can access data through the browser; measured, wish3d earth can load up to 180G real-three-dimensional model, easy to solve the big data volume issue.
This means that the time before the need to spend a lot of time to do word, PPT can be saved, open the browser can see all the engineering data, convenient, intuitive, WYSIWYG. Communication and collaboration are more convenient, information is more accurate, and leaders can make decisions quickly.
Cross-platform sharing: anytime, anywhere communication progress
Large-scale projects involve a lot of construction teams, management units and related departments, it is very difficult to coordinate the time and focus on the progress of the project.
The cross-platform nature of the Wish3d Earth makes it an unparalleled advantage in data sharing with previous technologies.
We used to use data lines when we were transmitting files before computers and mobile phones, even though very few data operations were complicated; now, whether you're a computer, a mobile phone or a tablet, there's no need to share data without having to install a browser. On the phone can report the progress of the project anytime, anywhere, solve the problem of data sharing.
Learn more about Wish3d Earth