Step 1 of the 2.SCRUM process
Complete the production backlog and ensure that the product backlog is organized before the Spint planning meeting.
Backlog
|
Id |
NAME |
IMP |
Est |
How to DEMO |
1 |
Randomly display the formula in the game |
15 |
20 |
Click to enter a game interface to display the equation directly |
2 |
Generate the right answers based on random questions |
15 |
5 |
The game interface has several options, including the correct answer, to choose from |
3 |
Answer the wrong question randomly change the question |
15 |
5 |
When choosing the wrong answer, change the title |
4 |
Fun and beautiful UI design |
15 |
20 |
UI for the main interface and the game interface |
5 |
Game Difficulty Design |
8 |
10 |
Multiple difficulties to meet demand |
6 |
Players get points |
8 |
5 |
In-game players have 10 points for each pair of 1 questions |
7 |
※. Third-party login, can be with the small partner PK Score |
Scrum Project 2.0