Sequence usage in Oracle

Source: Internet
Author: User
In Oracle, sequence is the so-called serial number, which is automatically increased every time it is obtained. It is generally used in places where the sequence numbers need to be sorted.

In Oracle, sequence is the so-called serial number, which is automatically increased every time it is obtained. It is generally used in places where the sequence numbers need to be sorted.

In Oracle, sequence is the so-called serial number, which is automatically increased every time it is obtained. It is generally used in places where the sequence numbers need to be sorted.

1. create sequence
First, you must have the create sequence or create any sequence permission,
Create sequence emp_sequence
Increment by 1 -- add several
Start with 1 -- count from 1
NOMAXVALUE -- do not set the maximum value
NOCYCLE -- always accumulate without repeating
CACHE 10;

Once emp_sequence is defined, you can use CURRVAL, NEXTVAL
CURRVAL = returns the current sequence Value
NEXTVAL = increase the sequence value, and then return the sequence Value
For example:
Emp_sequence.CURRVAL
Emp_sequence.NEXTVAL

Where sequence can be used:
-SELECT statements that do not contain subqueries, snapshot, and VIEW
-The INSERT statement is in the subquery.
-In the value of the NSERT statement
-UPDATE in SET

See the following example:
Insert into emp VALUES
(Em1_q. nextval, 'Lewis ', 'cler', 7902, SYSDATE, 1200, NULL, 20 );

SELECT empseq. currval from dual;

Note that:
-The first NEXTVAL returns the initial value. The subsequent NEXTVAL automatically increases the value of your defined increment by and then returns the added value. CURRVAL always returns the value of the current sequence, but CURRVAL can be used only after the first NEXTVAL initialization; otherwise, an error will occur. NEXTVAL increases the sequence value once. Therefore, if you use multiple NEXTVAL values in the same statement, their values are different. Understand?
-If the CACHE value is specified, oracle can place some sequence in the memory in advance, so that the access speed is faster.
After the cache is obtained, oracle automatically retrieves another group to the cache. The cache may be skipped. For example, if the database suddenly fails to be shut down (shutdown abort), the sequence in the cache will be lost. Therefore, nocache can be used to prevent this situation when creating sequence.

2. Alter sequence
You are either the owner of the sequence, or you have the alter any sequence permission to modify the sequence. You can alter all sequence parameters except the start value. If you want to change the start value, you must drop sequence and then re-create. Example:
ALTER sequence emp_sequence
Increment by 10
Max value 10000
CYCLE -- start from scratch after 10000
NOCACHE;

Initialization parameters that affect sequence:
Sequence_CACHE_ENTRIES =
Set the number of sequence that can be cached at the same time.

It's easy to Drop sequence.
DROP sequence order_seq;

End

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.