System Integration Knowledge Point finishing (10) information (documentation) and configuration management

Source: Internet
Author: User

Information (documentation) and configuration management

I. Important POINTS of knowledge

1. Document management

1.1. Classification of document management

(1) From the project cycle perspective: Develop documentation, product documentation, and manage documents.

2. Rules for chart numbering

650) this.width=650; "src=" http://s3.51cto.com/wyfs02/M00/74/E5/wKiom1YtuUGDGBFHAADr8CBnjyY881.jpg "title=" 1.jpg " alt= "Wkiom1ytuugdgbfhaadr8cbnjyy881.jpg"/>

3. Configuration management activities and processes

(1) configuration identification.

(2) Change control.

(3) Status report.

(4) configuration audit.

4. Configure the classification of the library

(1) The development Library, which holds the configuration entities currently being developed by the developer.

(2) The controlled library, which holds the current baseline and controls changes to the baseline.

(3) Product library for archiving a wide range of widely used published baselines.

(4) Backup libraries, including copies of different versions of the authoring software and related architectures, data and documents.

5. Configuration item version number identification

(1) Draft, the scope of 0.yz,yz is 01--99.

(2) Formal, x.y,x the main version number 1--9;y to the minor version number 0--9.

(3) Modify, X.yz, generally only increase z,xy remain unchanged.

6. Feature Configuration Audit validation content

(1) The development of the configuration item has been successfully completed.

(2) The configuration item has reached the specified performance and feature specific features.

(3) The running and supporting documentation for the configuration item has been completed and is in compliance with the requirements.

7. What the physical configuration audit validates

(1) Each configuration item that is built conforms to the appropriate technical documentation.

(2) Configure the information corresponding in the Encounter status report.





This article from "Rabbit-like rabbit sen Broken" blog, please be sure to keep this source http://arkling.blog.51cto.com/2844506/1706330

System Integration Knowledge Point finishing (10) information (documentation) and configuration management

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.