Rose HA 3107 installation process (Sybase)
Installation environment:
Two servers ("Server 1" and "Server 2", a full disk array cabinet, Sybase Database software, and Rose HA 3107 software .)
Installation Process:
1. Install Windows NT 4.0
(1) The SNMP and WINS services (Windows Internet Name Service) must be installed during NT4.0 installation ).
(2) install all drivers and configure the network.
(3) install services pack. (BOTH SP4 and SP5 are supported)
(4) In the Disk Manager of the two NT servers, check whether the drive letter of the volume of the database to be installed in the Cabinet is the same. The drive letter must be the same.
2. Install the Sybase Database
(1) create a sybase directory on a public disk, create data under it, and install two subdirectories.
(2) Disable Server 2 and install the Sybase Database on Server 1. During the installation process, install the program file on the local hard disk, install the library file on the cabinet, and then restart the computer.
(3) After installation, go to Sybase server config and delete the default SQL Server, backup server, and monitor server created during database installation.
(4) Delete the master. dat and sybprocs. DAT files in the Sybase \ data directory of the Public disk.
(5) Go to the server config of Sybase and create a new SQL server named pre-agreed virtual host name, the directory where the error log file is located is specified on the public volume of the Cabinet. Add \ PIPE \ Sybase \ query to the nlmsnmp Named Pipes driver option of network address, and add the virtual IP address and TCP/IP Port number to the IP port option of nlwnsck Winsock TCP/IP driver, the format is as follows: virtual IP address, 5000
(6) change the Error Log Path to the public disk path in config backup server. In network address, set the nlmsnmp Named Pipes driver option to \ PIPE \ Sybase \ backup, and the IP port option of nlwnsck Winsock TCP/IP driver to 5001.
(7) change the Error Log Path to the public disk path in config monitor server. In network address, the nlmsnmp Named Pipes driver option is \ PIPE \ Sybase \ monitor, and the IP port option of the nlwnsck Winsock TCP/IP driver is 5002.
(8) Disable Server 1 and install it on Server 2 according to the preceding steps. After the installation is complete, open the two servers. Stop all Sybase services on Server 2 and start Sybase services on Server 1 again to verify whether these services can be started. If it runs normally, perform the following steps. Otherwise, you must restore to normal before proceeding to the subsequent steps.
3. install and configure the Rose HA 3107 software.
(1) hardware Installation
Connect Server 1 and Server 2's COM1 ports with the RS232 serial line of Rose software
Note: We recommend that you use two heartbeat wires. If you want to establish a second heartbeat line through the network card, use the following method to connect.
1. Use a network cable to directly connect the NICS on the two servers.
2. Connect the NICS on the two servers through the hub.
If there is only one Nic on the server, you need to bind an IP address to the NIC for heartbeat connection.
(2) Software Installation
Go to the directory where the software is located on the CD, run the setup program, and install it by default. If you are prompted to enter the local and remote host names, enter the local server host names in the local column, enter the host name of another server in the remote field and enter the logon user password as prompted. Others are installed by default.
(3) create cluster resources
(1) Start the cluster administration tool. In the Tools menu, add the license and select the start button (the button is green ).
(2) In the private net menu, add the RS-232 line and select the COM1 port for connection. The transfer rate is-9600 by default. Then add the TCP/IP socket as the heartbeat line and select the corresponding IP address to connect. After the connection is successful, the two heartbeat lines between the two hosts are green on the private net administration interface. (Note: The heartbeat line must be set on both servers, and other resources only need to be set on one server .)
(3) Click resource objects to go to the resource administration page. Select volume from the create sub-menu in the resource menu. In the share volume column, select the public drive letter of the sybase database file in the inventory cabinet, select the create button, and click Close to exit. On the resource administration page, select volume to highlight it, and then click bring in. After bring in is successful, the host's resources are highlighted (for example,:), and the backup host's resources are green (for example :).
(4) use the same method to create an IP address and enter a virtual IP address in the Active IP address column. If multiple NICs exist, select the NICS to be used on the dual-host machine in the NIC column, select the IP address to be bound to the local machine in the original IP address column, and then click the Add button. Select the remote server in the server column, select the NIC and IP address, and click Add. After adding the file, click the create button. After creating the file, click Close to exit. On the resource administration page, select an IP address to highlight it, and then follow the (3) method to bring in.
(5) Create an alias name resource and enter the virtual shared host name in the computer alias name column. Click Create to exit. In the resource administration interface, select alias to highlight it, and then follow the (3) method to bring in.
(6) create a file share resource, select the shared volume of the database file in the file share column, and set volume, IP, alias items are added to the pre-requisite objects column, and then select the create button to exit. On the resource administration page, select File Share to highlight it, and then follow the (3) method to bring in.
(Note: In the following configuration process, set the virtual host name to "syb ")
(7) Create an NT services resource. In the list on the right, select Sybase sqlserver_syb to the NT Service column, and change the content in the object name column to Sybase sqlserver_syb. Add the File Share item in the available objects column to the pre-requisite objects column, select the create button, and exit. On the resource administration page, select Sybase sqlserver_syb to highlight it, and then follow the (3) method to bring in.
(8) Create an NT Services Resource, select Sybase monserver_syb from the list to the NT Service column, and change the content in the object name column to Sybase monserver_syb. Add the Sybase sqlserver_syb item in the available objects column to the pre-requisite objects column, select the create button, and exit. On the resource administration page, select Sybase monserver_syb to highlight it, and then follow the (3) method to bring in.
(9) Create an NT Services Resource, select Sybase bckserver_syb in the list, and change the content in the object name column to Sybase bckserver_syb. Add the Sybase monserver_syb item in the available objects column to the pre-requisite objects column, select the create button, and exit. On the resource administration page, select Sybase bckserver_syb to highlight it, and then follow the (3) method to bring in.
(10) You can select/cancel the automatic start cluster option in the Options menu. This option determines whether to start Rose HA when Windows NT starts.
Iv. Brief Introduction to Functions
: Used for manual switching between servers.
: Bring the resources in the vertex out.
: Stop the cluster service. (The button is red)
: Switch to the private net administration interface.
: Switch A single resource.
: Delete resources in a vertex
: View the resource content in the vertex
5. Test Procedure
1. Normal manual switch.
2. The host is shut down normally, and the service is switched to the backup host.
3. Unplug the host network cable and switch the service to the backup host. (Note: The NIC used must support network disconnection, such as 3com and Intel.
4. Unplug the heartbeat line. (Normal phenomenon: the heartbeat line turns red and neither side can be switched .)
5. Shut down abnormally. (Normal: all services are switched to the standby server .)
Vi. FAQs and Solutions
Rose HA 3107 FAQs and Solutions
1. The dual-host software on both hosts has been started, and the resources on both hosts are in the virtual state. What should I do?
On the host that is scheduled to host the resource, make the resource highlighted. Click the bring in button on the toolbar.
2. Why is the Windows NT Service Pack used when installing Rose HA 3107?
Use Service pack4, service pack5 or above.
3. When installing the trial version of Rose HA 3107, the system prompts "the license is invalid" at startup. The dual-host service cannot be started. How can this problem be solved.
Go to the license item of the tool sub-menu in the main menu, and click "OK.
4. When the shortcut buttons such as "takeover", "failover", "Bring in", and "Bring out" in the toolbar are unavailable. The status of the master and slave servers remains unchanged. The message "the public net is functioning, but all instances of private net are down or unavailable." is displayed .".
If the heartbeat line turns red on the "Private Net" Page, check the heartbeat line or change the heartbeat line.
5. after the dual-host service is stopped, the host in the STANDBY state before the shutdown is started, the host in the host State before the shutdown is started, and the host started first becomes the host, however, when the host is started later, the heartbeat line is disconnected and the resource cannot be bring in.
Check the IP address of the heartbeat line. If the IP address is not in the same CIDR Block, change it to the same CIDR block.
6. After the dual-host service is stopped, start the host in the STANDBY state before the shutdown. when the service is switched to half, what will happen to the host in the host State before the shutdown is started?
The dual-host will automatically change back to the status of the master-slave host before the shutdown, so there will be no confusion between the dual-host.
7. note that a patch cord error occurs, and the IP address of the standby server fails. The host displays all the resources of the standby server. The Standby server displays the volume error and the volume is out of the lock, the two hosts are displayed in different States. After the heartbeat line and IP address are restored to normal, the volume is still unlocked. How can we restore the above problems?
Run takeover on the host in the STANDBY state. After the switchover is successful, the dual-host instance returns to normal.
8. What will happen to the heartbeat line during the switchover?
If an error occurs in the heartbeat line, the switchover continues.
9. What will happen when the heartbeat jumper fails?
The switchover is automatically terminated and restored to the status before the switchover.
10. During the switchover, the host in the STANDBY state is switched off before the switchover. What will happen?
The dual-Host Program in the host status before switching has no response. Restart the dual-host software on the disabled host. At this time, the two hosts are displayed in different States. The host is displayed as a normal standby host and can take over the host normally. At this time, all resources on the host that is in the host State before switching are bring out.
Restart the host in the host status before the switchover. The switchover is normal.
11. An error is reported for the IP address of the host in the STANDBY state, but the IP address can still be switched normally without affecting the work of the dual host. An error will also be reported when the IP address of the backup host is switched. What is the reason for the above situation?
The active IP address and local IP address are not in the same network segment.
The local IP address and remote IP address may not be in the same CIDR block. When the Active IP address and the local IP address and one remote IP address are in the same CIDR Block, the above situations will not occur.
Or be careful when the patch cord IP address and the Active IP address and the local IP address are in the same network segment. The
Problem. Change the CIDR block of one IP address.
12. If the auto-switch back switch is not selected, the host in the STANDBY state is started before the shutdown, and the host in the host State before the shutdown. What will happen?
The starting host becomes the host, and the starting host becomes the standby host.
13. Both hosts start Rose HA 3107 on the local machine and cannot be started when the two hosts are started. The error "fail to get remote server's IP address from the Registry" is reported ". How can we deal with the above situation?
The above situation is caused by the different passwords of the Administrator on the two servers. Change the administrator password of the two servers to the same one and log on again.
14. The system cannot be switched during manual failover. The software error message is as follows:
"999. [System Error] Access Denied (0x5)
423. Lock volume <E:>: fail "(Note: e: Public disk volume)
What is the cause of this phenomenon? (Set the database file to be installed on the public disk edisk)
After the above phenomenon occurs, check whether the window for viewing the E disk is opened or the Disk Manager is in use. Switch between windows and the disk manager.
15. After the installation is complete, go to the control page and click Start. "cluster doesn't start" is displayed. The service cannot be started. How can this problem be solved.
Go to "service", start cluster service, get a message indicating an error during logon, double-click the service, and click "OK.
16. 3107 when the following conditions occur, the Standby server displays the volume of the host and reports an error. The Standby server switches the volume to the standby server. The remaining resources are still in the original state, and the status of the host is normal and unchanged, at this time, the volume is out of lock and both hosts can access the volume.
In this case, you should stop the cluster on the slave server (that is, the slave server), and then stop the cluster on the master server. After the database program is stopped, check whether the database is normal and restart the master server, you can. (Note: Copy all database files for backup and recovery .)
Other important notes:
1. after the dual-host software is installed, the start/stop operations of SYBASE database services should be implemented through the bring in and bring out functions of the dual-host software, do not use the built-in control tools such as Sybase.
2. the IP address and public IP address of the heartbeat line should be set in different CIDR blocks.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.