According to the "Medium and long-term railway network planning (2008 Adjustment)" [1], China will plan and build "four longitudinal four horizontal" passenger dedicated line, the passenger car speed target reaches more than 200 kilometers per hour (Yi million railway speed 160 km).
Four longitudinal for the Beijing-Shanghai Expressway, BJMTR high-speed railway, Beijing-Kazakhstan Express Rail, Hangfu deep passenger dedicated line (Southeast Coastal passenger line); four-Xu Lan passenger dedicated line (including Xu Passenger line), Shanghai-Kunming Railway, Green too passenger dedicated line, Shanghai-Han-Rong high-speed railway [1].
"Four longitudinal four horizontal" passenger line contains the line may not necessarily be "passenger line" grade, part I-Class railway, and for "passenger line" grade of the line is not all included in the "four longitudinal four horizontal" network.
Railroad lines and railway corridors are two different meanings of words. The railroad line refers to the specific route that has been named, and the railway channel is the link between the two places. For example, Ning-Han-Yu-Rong passenger dedicated line is often described as Shanghai-Han-Rong express passenger channel, Hangchangkun passenger dedicated line is often described as the Shanghai-Kunming rapid Passenger transport channel.
Four-vertical editing
BEIJING-Shanghai high-speed railway
Opening of four-longitudinal and four-cross passenger dedicated lines as at the end of 2012
Opening of four-longitudinal and four-cross passenger dedicated lines as at the end of 2012
Main site: Beijing South railway station-Tianjin South railway station-Jinan West railway station-Xuzhou East railway station-Bengbu South railway station-Nanjing South railway station-Shanghai Hongqiao station. The total length is about 1318 km, the design speed is 350km/h, and has the reserve space to speed up to 380km/h. BEIJING-Shanghai High-speed railway officially opened operation on June 30, 2011, EMU to the highest speed 300km/h operation, between Beijing and Shanghai, the shortest running time reduced to 4 hours 48 minutes.
In addition, there are Bengbu-Hefei branch (co-mussel passenger line), which is an important part of the Beijing-Fu passenger dedicated line. The design speed is at/h. The two major economic zones, the Bohai Sea and the Yangtze River Delta, are connected by Beijing-Tianjin-Shanghai and Hebei-Shandong-Jiangsu four provinces. The whole line was opened on October 16, 2012.
BJMTR Passenger dedicated line
BJMTR passenger dedicated line (BEIJING-Guangzhou-Shenzhen High-speed railway)
Main site: Beijing West railway station-Shijiazhuang station-Zhengzhou East railway station-Wuhan station-Changsha South railway station-Guangzhou South railway station-Shenzhen North railway station-Hong Kong West Kowloon Station. BJMTR passenger dedicated line is composed of Jing-shi passenger dedicated line, solicitation passenger dedicated line, Wuhan-Guangzhou passenger dedicated line and Guang-Hong Kong-Shenzhen passenger dedicated line, connecting North China, central and South China, design speed is 350km/h. One of the Beijing-Shenzhen section opened on December 26, 2012, the Shenzhen-Hong Kong segment is expected to open in 2016.
BEIJING-Harbin Passenger Line
BEIJING-Harbin Passenger Line
Main site: Beijing Spark Station-Chengde South railway station-Chaoyang North station-Fuxin North Station-Shenyang station/Shenyang North railway station/Shen Yangnan Station-Tieling West railway station-Siping East railway station-Changchun station/Changchun West railway station-Harbin West railway station
Shen da Duan Way main site: Shenyang/North/South railway station-Anshan West railway station-Yingkou East railway station-Bayuquan station-Dalian station/Dalian North railway station
Pan-Bus line: Panjin station/Panjin North Station-Haicheng West railway station
Dial-facing contact line: planning
BEIJING-Kazakhstan passenger dedicated line by the Beijing-Shenyang passenger dedicated line, Kazakhstan-major passenger dedicated line, disk Battalion passenger dedicated line composed of about 1612 kilometers, connected to the northeast and Kannai area, the design speed of 350km/h.
Latest progress: Harbin-Da passenger line has been opened on December 1, 2012. The operation of the dedicated passenger line was opened on September 12, 2013. December 28, 2013 China National Railway Corporation formally launched the Beijing-Shenyang passenger dedicated line construction project, March 1, 2014 formally started, the plan will be opened at the end of 2018.
Hangfu Deep Passenger Line
Hangfu Deep passenger line (Southeast Coast passenger line)
Main site: Hangzhou East railway station-Ningbo station-Taizhou station-Wenzhou South railway station-Fuzhou station/Fuzhou South railway station-Xiamen North railway station-Shenzhen North station, from Hangzhou-Ningbo passenger dedicated line, Yong-Wen Railway, Wenzhou-Fuzhou Railway, Fuk-Xia Railway and Xiamen-Shenzhen Railway, connecting the Yangtze River Delta, the PRD and southeast coastal areas. Latest progress: High-speed rail is now open, Shenzhen North railway station-Shanghai Hongqiao station D2286 Times on December 28, 2013 9:55 from Shenzhen North Station, only 12 hours 17 minutes to Shanghai Hongqiao.
Four-horizontal editing
Xu Lan Passenger dedicated line
Xu Lan Passenger dedicated line
Main site: Xuzhou East railway station-Shangqiu station-Zhengzhou station/Zhengzhou East railway station-Luoyang Longmen Station-XI ' an North station-Baoji South railway station-Lanzhou West railway station
Xu Lan passenger dedicated line from the continuous passenger dedicated line, Wuhan passenger dedicated line, Zheng-Xi passenger dedicated line, West Bao passenger dedicated line, Baolan passenger dedicated line composed of about 1606 kilometers, connected to the northwest and East China, the full speed 250-350km/h.
Latest Progress: Wuhan passenger dedicated line, commenced on December 26, 2012, is expected to be opened in 2015. [2]
Zheng-Xi passenger dedicated line, has been opened. West Treasure passenger dedicated line, has been opened on December 28, 2013. Baolan passenger dedicated line is expected to open in 2017. [3]
Shanghai-Kunming high-speed railway
Shanghai-Kunming High-speed railway [4]
Main site: Shanghai Hongqiao railway station-Hangzhou East railway station-Nanchang West railway station-Changsha South railway station-Guiyang North railway station-Kunming South railway station
Shanghai-Kunming high-speed railway from Shanghai-Hangzhou passenger dedicated line, Changsha passenger dedicated line, long Kun passenger dedicated line, connecting East China, Central and southwest, design speed 350km/h.
Latest Progress: Changsha passenger dedicated line, laying completed at the end of December 2013. Nanchang West railway station-Changsha South railway station, was opened on September 16, 2014. [5] Nanchang West railway station-Hangzhou East railway station, was opened on December 10, 2014. [6] The full plan of the June 2014 joint test [7], December has been opened. [8]
Long Kun passenger dedicated line, started construction in March 2010, Changsha South railway station-Xinhuang West station, was opened on December 16, 2014, Xinhuang West station-Guiyang North station, has been opened on June 18, 2015.
Tsing Tai Passenger Line
Tsing Tai Passenger Line
Main site: Qingdao Station/Qingdao North railway station-Jinan station/Jinan West railway station/Jinan East railway station-Dezhou East railway station-Shijiazhuang station-Taiyuan South railway station. From the rubber-ji passenger dedicated line, Shiji passenger dedicated line and stone too passenger dedicated line composed of about 906 kilometers, connecting east China and North China. The entire design speed is 200~250km/h.
Latest development: Rubber-Chai passenger dedicated line was opened in July 2008. The Shandong section of Shiji passenger dedicated line officially commenced operation on March 16, 2014. [9] The Shek Tai passenger line was opened in April 2009.
Shanghai-Han-Rong high-speed railway
Shanghai-Han-Rong high-speed railway
Main site: Shanghai Hongqiao railway station-Nanjing South railway station-Hefei station-Hankou station-Chongqing North railway station-Chengdu East railway station. Shanghai-Han-Rong high-speed railway from Shanghai Nanjing, Hopewell Railway, co-Wu passenger dedicated line, Han Yi Railway, Yi-Li Railway, Yu-Li Railway, [10] Chengdu-Chongqing passenger Line [11], connecting the southwest and East China.
Latest progress: Nanjing Station-Lichuan Station section has been opened. Chongqing Station-Lichuan Station section was opened in December 2013.
Four longitudinal four-horizontal passenger line (high-speed rail)