How to set up a flexible data acquisition route?

Source: Internet
Author: User
1.1 Business Background

With the complication of the production process, the existing MES system data maintenance is complicated and can even lead to the inability to meet the current business requirements.

1.2 Business purposes

To solve the operation of MES users because of the heavy work of maintenance collection route, reduce the workload of maintenance personnel, improve the work efficiency of maintenance personnel and realize the multi-factory mixed line production mode.

1.3 Business Requirements 1.3.1 Collection Point settings

Sets the acquisition point information.

The following points should be taken into consideration when setting up the collection point:

① collection point number set to meet the same production line of the acquisition point number should be set in accordance with the order of production

② porting the original acquisition route configuration to the acquisition point configuration

③ acquisition Point new allows automatic change and generation of new acquisition route configurations

④ acquisition Point new acquisition point type

1.3.2 Process Line Maintenance

Route maintenance. (The process route is to instruct the manufacturing unit to complete the production task according to the prescribed operation process)

such as: welding + WBS + coating + PBS COARSE + PBS + final assembly + detection + storage

1.3.3 Scheduled scheduling

Plan schedules to select the corresponding route and production line according to the production plan, and determine whether to generate a new acquisition route.

Note: When scheduling, the production line drop-down box for the page is changed with the selection of the route.

1.3.4 Data acquisition

Data acquisition Logic:

When the vehicle is carried out the point of sampling to determine whether the vehicle should pass this acquisition point, if passed, the acquisition of success, if not, you need to determine whether the acquisition point is configured to allow the modification and new acquisition route, if this is configured, and then determine whether there is a collection route in the corresponding acquisition route, if there is, Change this acquisition route to a new acquisition route, and if not, automatically generate a collection route and change the acquisition route to a new acquisition route.

How to set up a flexible data acquisition route?

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.