Install the language pack (LANGUAGE Package)

Source: Internet
Author: User
Tags change settings pack sap gui

by Maple Bamboo Painting

A Description

After SAP ECC is installed, if it is a production version, there are usually only two languages-english and German. If you want a Chinese environment, you need to define the supported language types and import the language packs. If the Ides version is installed, the system already contains dozens of language packs, just set the configuration parameters to use Chinese.

Different SAP products, different versions, and the corresponding language packs are different, for example, ECC 6 SR2 and ECC 6 SR3 language packs are two distinct volume labels. In addition to SAP products, installing/updating Some component packages also requires that the appropriate language pack be Installed.

The example of this article is the language pack that installs ECC 6 SR3, the installation file is labeled 51033496_6, There are multiple language packs under this volume, the path of the Chinese package is lang6zh, the file name is zhecc63f.pat, and it is copied into the Server's usr\sap\trans\ before installation Eps\in path. After the import is complete, you can delete or remove the file from the Server.

The steps of the operation consist of two parts: defining the supported languages, importing the language packs, and other products such as srm, solution manager, and so On. Before doing this, the domain controller needs to be configured, see "transport management domain controller configuration", also need to activate the language code, see "activation language support (NLS)". Due to the problem of Chinese translation, it is done in English Environment.

Two Operation

Enter the thing code SMLT in the foreground or follow the path shown in Figure 1 to enter the Figure 2 Interface.

Figure 1 Foreground path

Figure 2 Language Management interface

Figure 2 is the language management interface, which is the initial environment and contains only English and German Languages. Click the new Language button () to pop up the figure 3 dialog box.

Figure 3 New Support Language dialog box

Figure 3 is a new support language dialog box, selected by Legend support language (ZH), support language (supplementation Language) selected in English (en). After setting the click on the Save button (), the system pops up the Figure 4 dialog box, warning This setting can only be performed once, confirm the parameter is correct after clicking the Yes button to continue, the System pop-up Figure 5 dialog box indicates that the Chinese (ZH) has been saved Successfully.

Figure 4 Alert Information dialog box

Figure 5 Save Success dialog box

Figure 6 Language management interface (chinese already in It)

Figure 6 shows that the system supports chinese, but the language pack has not yet been imported. Select the Chinese entry, click the menu "language→import package", or click the button to pop up the figure 7 dialog Box.

Figure 7 Importing the Language Pack dialog box

Figure 7 is the Import Language dialog box, before doing this, you need to put the language pack file into the Server-specified directory (see the previous article), click the "find package" button, the system will automatically find the language pack information allowed to install, 8.

Figure 8 shows the language pack information that is allowed to be imported

Figure 8 indicates that the language pack is correct and can be imported, set before the import operation, click the "Settings" button, and pop up the figure 9 dialog box.

Figure 9 Importing the Language Pack parameter Settings dialog box

Figure 9 is the import Language Pack parameter Settings dialog box, where we set the number of processes to run at the time of import (set to 3) and set the import to all clients (import into all clients). When set, press the Confirm key () to Exit.

Figure 10 Performing an action

When all is set, check the run information (10) on the right side of the dialog box, the import operation can be immediate, or you can specify the time automatic action, which is performed in the Background. This example we choose to operate immediately, Click the Execute button, click execute, the system pops up the Figure 11 dialog box, Select "Yes" to Continue. The system then pops up the Figure 12 dialog box, indicating that the import operation has Started.

Figure 11 asking whether to start the Import Operation dialog box

Figure 12 Import operation start Run information

Three Import status Query

The import operation will take a while, because it is running in the background, during which time the SMLT interface can be exited and the SAP GUI can be closed. The following two methods are available to view the health of the import Operation.

One way is to see when running smlt, 13, the state of the Chinese entry is different from the English one, and there is a car running description on the diagram that is being executed.

Figure 13 Import Status

Another way is to enter the thing code STMS in the foreground, Click the Transfer Overview button (), display the Figure 14 interface, Double-click the item with the mouse ("System C11") into the figure 15 interface, you can see a total of 10 task requests are executing, when all of them into a green tick, it indicates that the task is completed, The language pack was successfully imported into the System.

Figure 14 Transport Overview

Figure 15 Import Status interface

Another way:

After installing SAP ECC6.0 ides, The default can only be shown in English or german, to display chinese, You must manually activate the Chinese language pack, the following steps:

one, The execution of transaction code smlt, to view the installed language pack, the General Language pack default is already installed in the system, but not activated. Click the Language Information button on the right side of the chinese, navigate to the Supplementation language marquee, Click the Change Settings button at the bottom of the window, then supplementation Language Select Chinese in the box, click Save.

second, go back to the list window of the language pack, click the Supplement Language button on the right side of the chinese, enter a description, and then click Execute to start the operation, and SAP initiates a background task to activate the language pack. Click the Back button to perform SM37 view background jobs, You can see a task named Sap-language-sup zh, the status of active, click the Refresh button to see the operation, when the status becomes finished, the task has been completed, This process takes a long time, and my machine takes more than 20 minutes to look at.

third, Execute SE38, Run the language activation program rscpinst, select [ZH chinese], Click the Activate button, and then exit.

Iv. Implementation of the RZ10. After entering, because it is just installed system, parameter files are not loaded, first to import the local parameter file into the system, click on the menu bar "ulitilies", "IMPORT PROFILES", and then select "of ACTION SERVERS". In the profile, Select a file of type instance profiles with the name associated with your installation information, prefixed with sid, DVEBMGS00 in the middle, suffix is your machine name, and in the editor profile, select "EXTENDED Maintenance ", Click the" Change "button, and then click the Create Parameter button to new the following parameters:

Zcsa/system_language = 1
Zcsa/second_language = E
Zcsa/installed_languages = 1ED
Install/codepage/appl_server = 8400
INSTALL/CODEPAGE/DB/TRANSP = 8400
INSTALL/CODEPAGE/DB/NON_TRANSP = 8400

The first is the parameter name, followed by the value, and the parameter file is saved after Completion.

five, Log out, Open the SAP MMC restart service, log in again, in the Simplified Chinese client 800 window.

Install the language pack (LANGUAGE Package)

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.