Operation demonstration video tutorial of
All the questions you encounter will be answered here
How to direct the total station, how to modify the observation meteorological parameters of the Total Station, how to use a ruler to measure the height of the instrument mirror, how to place the total station, how to calculate the accuracy of the Total Station, how to adjust the electronic bubble of the Total Station and the laser pair, how to distinguish the left and right of the Total Station disk, and how to set the zero-point total station
How to set out the level, second-class leveling standard download
How to wire the theodolite and how to test the angle of the theodolite
Update log:
September January 11, 2014 --- a full set of video tutorials for schools (For details, refer to the video description column)
June October 20, 2013-added the "8-lecture single video of Central TV University's architectural survey"
Ii. Recording of basic measurement skills
Introduction to the Construction Function of the Total Station in lecture 01st. wmv 13.4 m
02nd lecture Total Station test back method test horizontal angle. wmv7.95m
03rd lecture on distance measurement of total station. wmv4.94m
04th lecture on three-dimensional coordinate measurement of total station. wmv9.25m
05th. wmv16.3m
06th about the placement of theodolite. wmv5.99m
07th horizontal angle. wmv11m
08th general level measurement. wmv12m
09th lecture IV level measurement. wmv31m
10th draw the grid coordinate using the coordinate grid ruler method. wmv13.54m
11th use the CASS software to draw the grid coordinate. avi3.14m
Lecture 1 Total Station suspension height measurement. wmv9.07m
13th check of the circular level of the lecture level. wmv8.86m
14th lecture on Total Station Data Management and transmission. wmv3.08m
15th calibration of cross-wire yarn of the lecture level. wmv4.68m
16th introduction to the internal structure of the Total Station. wmv9.84m
17th check and calibration of the video quasi-axis of the Speak Level Instrument parallel to the leveling axis. wmv2.17m
18th. wmv4.54m
19th check and calibration of cross-wire and vertical wires of theodolite. wmv4.95m
20th inspection of the theodolite quasi-axis. wmv4.73m
21st. wmv9.42m
22nd inspection of theodolite optical mid-range tool. wmv40m
23rd survey of Large-Scale Topographic Map Using the theodolite method. wmv100m
24th introduction to the use of the basic measuring plug-in-theodolite and function calculator. flv52.9m
Iii. Introduction to the use of common Total Stations
01st lecture Total Station Data Collection 1: South nts310 series instruments. wmv3.1m
Lecture 02nd Total Station Data Acquisition 2: Swiss 300 series instruments. wmv9.1m
Lecture 03rd Total Station Data Collection 3: Swiss 850 series instruments. wmv8.9m
04th lecture Total Station Project point coordinate lofting 1: Southern nts310 series instruments. wmv3.1m
05th lecture Total Station Project point coordinate lofting 2: Swiss 300 series instruments. wmv4.7m
06th lecture Total Station Project point coordinate lofting 3: Swiss 850 series instruments. wmv9.8m
07th lecture Total Station rear delivery method Fixed Point 1: South nts310 series instruments. wmv2.2m
08th lecture Total Station rear delivery method Fixed Point 2: Swiss 300 series instruments. wmv4.5m
09th lecture Total Station rear delivery method Fixed Point 3: Swiss 850 series instruments. wmv5m
10th parameter settings of Total Station Instrument: Southern nts310 series instrument. wmv4.7m
11th lecture on total station road construction lofting: Southern nts310 series instruments. wmv9.4m
12th lecture Total Station suspension height measurement. wmv10.1m
13th lecture on Total Station Data Management and transmission. wmv4.8m
14th introduction to the internal structure of the Total Station. wmv8.6m
15th Case 1: A simple method for measuring the construction of the gymnasium cap. wmv49.9m
16th Case 2: Measurement of the land acquisition line of the College's houshan Student Apartment Project. wmv118.3m
Iv. Full Set of school videos
The first set of architectural surveying: 867 m from the Central Broadcasting and Television University (Lecture 8)
Second set of surveying: Jilin University (51 lectures) 9.22 GB
The third set of "engineering surveying": Lecture 69, Guangdong Jiaotong Vocational and Technical College, 4.97g
Fourth set of surveying Northwestern University of Technology (Lecture 27) 0.99g
Fifth set of "Architectural surveying" Zhejiang Guangxia Vocational and Technical College (full 16) 2.87g
Set 6 "Surveying" Harbin Institute of Technology (36 lectures) 375 m
Seventh set of surveying: Xi'an Jiaotong University (48 lectures) 2.12 GB