SAP Learning Notes
20150428
PP Module
1, system outside the process, in-system process
Routing route, work step = process;
Factory code: ZS10; work center, work center can choose a cost center, a work center will correspond to multiple cost centers, or can only correspond to one;
What is the relationship between sales contract and sales contract number?
Ca0/ca02
2, from batch, to batch use is in: Need to select the number of routes according to the situation.
3, the role of the control code is: To complete a task after the need to be confirmed
Application scenarios for control codes: Internal processing and external co-occurrence
PP09, indicating internal processing-milestones, need to use the control code to confirm.
PP02, indicating external processing, that is, outside the association.
If the confirmation code is 1, it must be confirmed, and if the confirmation code is 2, it is not necessarily confirmed.
When the control code is added, it must be confirmed (to complete) before the next step.
4, virtual-The purpose of the column, if the virtual column tick, representative in the company does not need processing, is the finished product direct use.
If not ticked, prove that the material is semi-finished and raw material
5, A02 can be used as a standard BOM, also can be used as a project BOM
The group counter has 2 hours, 4 hours, 5 hours, and 3 kinds.
Filters are used for query functions.
6. CN indicates no material plan
CP indicates a domestic related delivery
The above is the sales order release requirements (is the Engineering department PE Feng to release)
7. Main production Plan MPs
MRP Material Requirements Planning
Production Operation Control Sfc/pac
8. The production order is generated by the planned order, so the time period of the production order is the same as the time of the planned order, but it can be modified later.
The project process card is for the production of semi-finished products, this is not as SAP.
9. MPs image description
Need two computers--Establish the sale order BOM---Determine the hardware required for two computers, may require CPU, memory, hard disk, monitor----first determine the delivery time, such as 30th delivery, here can be counted to complete two computers assembly takes a few days, such as 2 days, And then determine the latest start of the assembly time is 29th, of course, can advance----and then calculate the number 29th, 30th, the day of the first material preparation, such as 29th Advanced Line CPU, memory assembly, so 28th memory and CPU to arrive and so on.
10, starting from the sales contract-first by the sales contract to generate a sales order-a sales order to generate a planned order-a planned order to produce a production order
Running MPs---mp50/mp-41
A planned order can generate two lines, one is a planned order to produce a production order, and the other is a PR order generated by a planned order, resulting in a PO
MD04 Dynamic Inventory
MD05 Static Inventory
11, the MRP range, the default is ZS10
OUSTST Sales Contract
Pldord Planned Orders
Ousord Sales Order
View planned orders can be obtained by MD12/MD13
12, special procurement type, if filled with 52,ftx40 assembly and f800v8000 row racks will form a mother-to-child relationship, when the row frame is completed, all the cost of the row rack into the assembly, that is, the use of 52 special procurement type will be a one-time transfer two production orders.
PP01 Standard production order types
13, CO02 can make the production order modification
Co02s can make production order inquiry
Personal--SAP Study Notes